The USACE manual Rock Foundations (EM 1110-1-2908) describes the Geomechanics Classification (RMR) and the Q-system and recommends trying more than one, because the classification itself forces a systematic look at strength, jointing, condition and water. For railroad cuts and bridge foundations on rock the RMR is the more convenient: its five basic parameters come straight from core logs and outcrop mapping, and through GSI it leads to the Hoek-Brown strength and modulus needed for slope and foundation analysis.
| Parameter | Ratings |
|---|---|
| Intact strength (UCS) | >36,000 psi: 15; 14,500–36,000: 12; 7,250–14,500: 7; 3,600–7,250: 4; 725–3,600: 2; 145–725: 1; <145: 0 |
| RQD | 90–100%: 20; 75–90: 17; 50–75: 13; 25–50: 8; <25: 3 |
| Discontinuity spacing | >6.6 ft: 20; 2–6.6 ft: 15; 8–24 in.: 10; 2.4–8 in.: 8; <2.4 in.: 5 |
| Discontinuity condition | 30, 25, 20, 10 or 0 from very rough and tight to open with soft gouge |
| Groundwater | Dry 15; damp 10; wet 7; dripping 4; flowing 0 |
| Orientation adjustment (slopes) | 0, −5, −25, −50, −60 from very favorable to very unfavorable |
Equation 2.7-9. GSI and generalized Hoek-Brown parameters
mb = mi exp[(GSI − 100)/(28 − 14D)]; s = exp[(GSI − 100)/(9 − 3D)]; a = ½ + (e−GSI/15 − e−20/3)/6
Equation 2.7-10. Rock mass modulus (Hoek and Diederichs)
| Input | Value | Result | Value |
|---|---|---|---|
| UCS, RQD | 8,000 psi, 62% | Basic / adjusted RMR | 60 / 55 |
| Joint spacing, condition | 10 in., slightly rough, highly weathered | Class | III — Fair |
| Groundwater, orientation | Damp, favorable | GSI | 60 |
| mi, disturbance D | 17, 0.7 (good blasting) | mb, s, a | 1.888, 0.00304, 0.503 |
| Rock mass modulus | 482 ksi |
Open the rock mass calculator →
RMR89 from five parameters plus orientation, rock mass class with c and φ ranges, GSI, Hoek-Brown mb, s, a, rock mass strength and modulus, and the failure envelope.
This is the cut of Table 2.7-16, worked by hand. It goes from the five RMR parameters to the Hoek-Brown constants and the rock mass modulus, which is the chain an analysis program needs.
| Variable | Value | Description |
|---|---|---|
| UCS | 8,000 psi (55 MPa) | Sandstone |
| RQD | 62% | |
| Spacing | 10 in. | Joint spacing |
| Condition | Slightly rough, highly weathered walls | |
| Water | Damp | |
| Orientation | Favorable for slopes | |
| mi | 17 | Intact rock constant, sandstone |
| D | 0.7 | Disturbance, good blasting |
| Ei | 2,400 ksi | Intact modulus: modulus ratio 300 × UCS, as used by the calculator |
| Rating tables | Table 2.7-15 (Bieniawski 1989) | Strength, RQD, spacing, condition, groundwater and orientation ratings |
Basic RMR 60, adjusted 55 (Class III, fair); GSI 60; mb = 1.888, s = 0.00304, a = 0.503; Erm = 482 ksi.
Blast damage (D = 0.7) cuts the rock mass modulus to about a fifth of the intact value and lowers s by a factor of about 20 compared with undisturbed rock. Controlled blasting near the final face is worth specifying for that reason alone.
These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.