↑ Parent Menu⌂ Main Menu
← Chapter 2.7 Rock and Sand: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.7.9 Weak, Degradable and Soluble Rock

Sand and rock are usually the good ground on a railroad, but each has its own hazards: loose sand settles, scours, runs and liquefies; rock falls, slides on its joints, weathers, slakes and dissolves.
Author: Daniel P. Colwell
2.7.9 Weak, Degradable and Soluble Rock
Table 2.7-12: Problem Rocks
RockProblemTestsEngineering response
Shale, mudstone, claystoneSlaking and softening on wetting and drying; swelling; low residual strength on beddingSlake durability (ASTM D4644, withdrawn 2025): Id2 < 60% low durability; jar slake test; Atterberg limits of slaked materialTreat as soil in fills (compact in thin lifts, break down); protect cut faces; use fully softened or residual strength
Pyritic shale and slateOxidation of pyrite causes heave, acid drainage and sulfate attackSulfur and sulfate content; pHAvoid in fill near structures; sulfate-resistant concrete; acid drainage control
Limestone, dolomite, gypsum (karst)Solution cavities, sinkholes, pinnacled rock surface, collapse of soil coverGeophysics (ERT, MASW, GPR), closely spaced probes, coringGrouting, bridging slabs or geogrid, drainage control (do not concentrate water), avoid ponding in ditches
Weathered granite and gneiss (saprolite)Corestones and boulders in soil matrix; variable depth to rockSeismic refraction; borings with coringPlan excavation for boulders; bearing on variable surface
Volcanic tuff and ashLow density; may slake or collapseUnit weight, slake durabilityAs for weak rock

See Chapter 3.8, Section 3.8.5 for subsidence and karst collapse mechanisms.

Excavatability

Seismic P-wave velocity from refraction surveys (Chapter 5.1, Section 5.1.7) is the usual first indication of how rock can be excavated: velocities below about 4,000 to 5,000 ft/s are generally rippable with large dozers, about 5,000 to 8,000 ft/s may be marginal, and higher velocities usually need blasting. The limits depend on the equipment and on joint spacing; check against manufacturer rippability charts and test excavations.

← Previous · 2.0 The Underworld Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.8 — Groundwater Characterization and Seepage