2.7.18 Rock Wedge Stability by the Comprehensive Vector Solution

Sand and rock are usually the good ground on a railroad, but each has its own hazards: loose sand settles, scours, runs and liquefies; rock falls, slides on its joints, weathers, slakes and dissolves.
Author: Daniel P. Colwell
2.7.18 Rock Wedge Stability by the Comprehensive Vector Solution

Section 3.4.9 screens a cut for wedges that can slide; this section computes how close one of them is to sliding. Wyllie and Mah's Rock Slope Engineering (Appendix III) gives the full vector solution first published by Hoek and Bray, which is the basis of the common wedge programs. The wedge is bounded by two slide planes, the upper slope, the face and an optional tension crack. Each slide plane has its own cohesion and friction, the wedge and crack can be full of water, and anchor and seismic forces can be added. The solution also checks whether contact is kept on both planes or lost on one, which changes the mode of sliding. Kliche's Rock Slope Stability and the FHWA Rock Slopes manual cover the same analysis and the field data it needs.

2.7.18.1 Method

Equation 2.7-11. Factor of safety with contact on both planes

N1 = ρ[W kz + T(r v − s) + E(r ve − se) + V(r v5 − s5)] − u1A1;   N2 similarly

FS = (N1 tanφ1 + N2 tanφ2 + c1A1 + c2A2) / ν(W iz − T w − E we − V w5)

The vectors and coefficients are those of Wyllie and Mah's equations III.1 to III.80, built from the dip and dip direction of each plane. Water pressure is the average for a fully saturated wedge with the water table at the upper surface. Partial saturation is modeled, as Wyllie and Mah suggest, by reducing the unit weight of water in proportion. The minimum anchor tension for a target factor of safety, and the anchor's best orientation, follow from equations III.105 to III.111.

Table 2.7-17. Verification against Wyllie and Mah's Appendix III example (γw = 62.5 pcf)
QuantityPublishedCalculator
Line of intersection, plunge / trend31.20° / 157.73°31.20° / 157.73°
Wedge weight2.8272 × 107 lb2.8272 × 107 lb
FS, saturated with tension crack1.13781.1378
FS, dry1.73601.7356
Minimum anchor tension for FS = 1.53.4307 × 106 lb3.4305 × 106 lb

2.7.18.2 Worked example

The Appendix III wedge is 100 ft high: plane 1 dips 45° toward 105° (c = 500 psf, φ = 20°) and plane 2 dips 70° toward 235° (c = 1,000 psf, φ = 30°), with a tension crack 40 ft behind the crest. It weighs about 14,136 tons. Saturated, its factor of safety is 1.14; drained, 1.74. A seismic coefficient of 0.1 on the saturated wedge lowers it to 0.93. To reach 1.5 saturated takes about 1,715 tons of anchor force, best installed nearly horizontal and pointing back along the line of intersection. Drainage is worth nearly as much as the anchors.

Wedge results are very sensitive to the friction angle and to water. Use friction from tilt or direct shear tests on the actual joint surfaces (Section 2.8 rock mass sections), check the dry and saturated cases, and remember that a tension crack full of water after a storm is the condition under which most wedges along track come down.

Open the rock wedge calculator →
Hoek and Bray comprehensive wedge solution: geometry, weight, water and tension crack, cohesion and friction on each plane, anchor and seismic forces, contact checks, and the minimum anchor tension at its optimum orientation.

2.7.18.3 Friction-only screening and when to go further

Wyllie and Mah screen wedges first with friction-only charts (their Section 7.5). With no cohesion and no water, the factor of safety does not depend on the size of the wedge, only on its shape and the friction angles: FS = A tanφA + B tanφB, where A and B are read from charts for the dips and dip directions of the two planes. Their guidance is practical. A wedge below 1.0 will probably fail as the cut is made, so the only realistic option is to cut the face no steeper than the line of intersection. Between 1.0 and 2.0 the wedge needs the comprehensive analysis of this section, usually to size bolts. Above 2.0 it can generally be left. Because the calculator solves the general case, setting c = 0 and no water reproduces the friction-only value for any friction angle.

Table 2.7-18. Friction-only factor of safety of the Appendix III wedge (c = 0, dry, same φ on both planes), from the calculator
φ (deg)FSWyllie and Mah guidance
200.90Below 1.0: cut at the line of intersection
251.161.0 to 2.0: comprehensive analysis and bolting
301.441.0 to 2.0: comprehensive analysis and bolting
351.741.0 to 2.0: comprehensive analysis and bolting
402.09Above 2.0: generally stable

2.7.18.4 Water and anchors

The tables below take the saturated Appendix III wedge and vary first the water level and then the anchor force. The anchor is set at the optimum orientation the calculator finds (plunge about 7° upward, trend 349°). Wyllie and Mah give a quick rule for that orientation. Point the anchor back along the line of intersection, viewed from the toe, and incline it so that it makes an angle equal to the average friction angle with that line: plunge ≈ ½(φ1 + φ2) − ψi = 25° − 31.2° = −6.2° (upward), close to the exact −7.0°. Draining the wedge raises its factor of safety from 1.14 to 1.74. Reaching the same gain with anchors would take roughly 2,500 tons of anchor force. Drains, kept working, are the cheaper first step.

Table 2.7-19. Effect of water and anchor force on the Appendix III wedge (c1 = 500 psf, c2 = 1,000 psf), from the calculator
Water (% of saturated)FSAnchor force, tons (optimum orientation, saturated)FS
01.7401.14
251.585001.23
501.4310001.33
751.2815001.45
1001.1420001.58
25001.73
05001,0001,5002,0002,50011.21.41.61.8Total anchor force (tons)Factor of safety, saturatedAnchor force at optimum orientation
Figure 2.7-1. Saturated Appendix III wedge: factor of safety against anchor force at the optimum orientation. The red line marks FS = 1.5; the blue line marks the FS the same wedge reaches dry.

2.7.18.5 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • D.C. Wyllie and C.W. Mah, Rock Slope Engineering: Civil and Mining, 4th edition: Appendix III comprehensive wedge solution and its worked example; Chapter 7 wedge chartsFind source ↗
  • C.A. Kliche, Rock Slope Stability (SME): wedge failure analysis and stabilizationFind source ↗
  • FHWA, Rock Slopes: Design, Excavation, Stabilization, FHWA-TS-89-045 (1989): rock slope design, wedge analysis and stabilization methodsFind source ↗
  • Slope Engineering for Mountain Roads (Geological Society of London, Engineering Geology Special Publication): rock slope hazards along transport corridorsFind source ↗Library entry