This chapter covers the two coarse ends of the ground spectrum. Sand (USCS SW, SP, SM, SC) is free-draining, gains strength from friction and density, and is the basis of good subballast and embankment fill. Rock is the bedrock and boulder ground of cuts, tunnels and foundations, whose behavior is controlled less by the strength of the intact rock than by its joints, bedding, weathering and water.
| Material | Hazard | Where it shows up |
|---|---|---|
| Loose sand | Settlement under vibration and repeated loading; liquefaction when saturated | New fills, loose natural sand under track, seismic regions |
| Sand at waterways | Scour and erosion | Bridge piers and abutments, culvert outlets, river-bank alignments |
| Sand below the water table | Running and flowing sand in excavations; boiling | Culvert replacements, foundation excavations, undercutting |
| Wind-blown sand | Ballast fouling and burial of track | Desert and coastal lines |
| Rock cuts | Rockfall, planar and wedge sliding, toppling | Mountain and river-valley alignments |
| Weak and degradable rock | Slaking, swelling and softening of shale and mudstone | Cut faces, shale fill, shale subgrade |
| Soluble rock | Karst voids and sinkholes | Limestone, dolomite, gypsum terrain |