A Class I railroad wants to use sand from a borrow pit on its right-of-way as embankment fill for a new siding. A gradation test gave the grain sizes shown, with 3% fines. The engineer must classify the sand and comment on its use as fill.
A gradation-only classification: with 3% fines the sand gets a single symbol.
| Variable | Value | Description |
|---|---|---|
| D10, D30, D60 | 0.006, 0.012 and 0.024 in. | |
| Fines | 3% | Less than 5% |
SP, poorly graded sand.
A Cu of 4 means a narrow range of grain sizes. Uniform sands drain well but compact poorly and are prone to running below the water table.
Rock core from a cut on a Class I railroad was tested at the drill rig with a point load tester, giving the size-corrected index shown. The engineer must estimate the unconfined compressive strength and the ISRM strength grade for the cut design.
The point load test is a quick field substitute for the uniaxial compressive test.
| Variable | Value | Description |
|---|---|---|
| Is(50) | 400 psi | Size-corrected point load index |
| Factor | 24 | Typical conversion; it ranges from about 15 to 25 for different rocks |
qu ≈ 9,600 psi (66 MPa), ISRM grade R4, strong.
The conversion factor varies by rock type, so calibrate it with a few uniaxial tests on the same core before using point load results for design.
Blocks are sliding on a rough joint set in a rock cut above a Class I railroad main line. The joint has the residual friction angle, roughness and wall strength shown, and the normal stress on the joint is low. The engineer must find the friction angle of the joint for the stability analysis.
Barton’s criterion adds a roughness term to the residual friction angle; the term is largest at low normal stress, which is the condition in most rock slopes along track.
| Variable | Value | Description |
|---|---|---|
| φr | 28° | Residual friction angle |
| JRC | 6 | Joint roughness coefficient |
| JCS | 5,000 psi | Joint wall compressive strength |
| σn | 50 psi | Normal stress |
φ = 40°.
Roughness adds 12° at this low stress. At 500 psi the term would be 6 × 1 = 6°, so the friction angle measured in a high-stress laboratory test can understate the strength of a shallow block and overstate that of a deep one.