Author: Daniel P. Colwell. This chapter was written and compiled by Daniel P. Colwell for Railway Ground Hazard Risk Management from the published sources below; credit for that material belongs to their authors and publishers. It contains no client- or project-specific data.
Sources
- Barton, N. and Choubey, V. (1977). “The Shear Strength of Rock Joints in Theory and Practice.” Rock Mechanics, 10Find source ↗
- Bieniawski, Z. T. (1989). Engineering Rock Mass Classifications. WileyFind source ↗
- Bolton, M. D. (1986). “The Strength and Dilatancy of Sands.” Géotechnique, 36(1)Find source ↗
- Deere, D. U. and Deere, D. W. (1988). “The Rock Quality Designation (RQD) Index in Practice.” ASTM STP 984Find source ↗
- FHWA (1993). Rockfall Hazard Rating System, FHWA-SA-93-057; Pierson, L. A., Davis, S. A. and Van Vickle, R. (1990). Oregon DOTFind source ↗
- FHWA (2012). Evaluating Scour at Bridges, HEC-18, 5th ed.Find source ↗Library entry
- Hoek, E. (2007). Practical Rock Engineering. Rocscience; Hoek, E., Carranza-Torres, C. and Corkum, B. (2002). “Hoek-Brown Failure Criterion – 2002 Edition.”Find source ↗
- Hoek, E. and Bray, J. W. (1981). Rock Slope Engineering, 3rd ed. IMMFind source ↗
- Holtz, R. D., Kovacs, W. D. and Sheahan, T. C. (2011). An Introduction to Geotechnical Engineering, 2nd ed. PearsonFind source ↗
- Idriss, I. M. and Boulanger, R. W. (2008). Soil Liquefaction During Earthquakes. EERI MNO-12Find source ↗
- ISRM (1981, 2007). Suggested Methods for Rock Characterization, Testing and MonitoringFind source ↗
- Kulhawy, F. H. and Mayne, P. W. (1990). Manual on Estimating Soil Properties for Foundation Design. EPRI EL-6800Find source ↗
- Wyllie, D. C. and Mah, C. W. (2004). Rock Slope Engineering, 4th ed. Spon PressFind source ↗
- ASTM D2487, D4644 (withdrawn 2025), D5731 (withdrawn 2025), D5878, D6913, D7012Official page ↗Library entry
Photograph credits
The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.
- Photo 2.7.4-1 — Casing and plastic tubing used for placement of explosive charges at depth for blast densification. Photograph courtesy of James K. Mitchell. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 2.7.4-2 — Surface expression of detonation of many charges for deep densification of loose sand at depth. Photograph from Montreal Engineering Co. Jebba Dam project file, courtesy of AMEC. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 2.7.4-3 — Sand compaction pile construction in Southern California. (Photograph from www.fudo-const.com, courtesy of Fudo Construction, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 2.7.4-4 — Sand compaction pile construction in Washington. (Photograph from www.fudo-const.com, courtesy of Fudo Construction, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 2.7.4-5 — Sand compaction pile construction in Hollister, California. (Photograph from www.fudo-const.com, courtesy of Fudo Construction, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 2.7.4-6 — Tops of sand compaction piles after construction in Southern California. (Photograph from www.fudo-const.com, courtesy of Fudo Construction, Inc.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗