↑ Parent Menu⌂ Main Menu
← Chapter 2.1 Track Foundation Elements
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.1.17 Granular Layer Thickness Design (Li-Selig Method)

Everything beneath the subgrade surface that the track depends on — embankments, cuts, foundation soils, drainage structures, bridge approaches and the structural foundations that share the right-of-way.
Authors: Daniel P. Colwell and Mario Ruel
2.1.17 Granular Layer Thickness Design (Li-Selig Method)

The ballast and subballast together make up the granular layer that spreads wheel loads onto the subgrade. Older design methods limit the subgrade pressure to one allowable value (for example the 20 psi used with Talbot's equation in Chapter 2.3) and assume the whole track foundation is one uniform elastic half-space. Both choices ignore tonnage: a line carrying 10 MGT a year would get the same section as one carrying 100 MGT. The Li-Selig method, developed from heavy-axle-load research and summarized in Railway Geotechnics (Li, Hyslip, Sussmann and Chrismer, 2016), designs the granular layer to prevent the two subgrade failures caused by repeated loading of fine-grained soils: progressive shear failure at the subgrade surface (the soil is remolded and squeezes out to the shoulders, usually worst near the tie ends) and excessive plastic deformation (a ballast pocket growing in a soft layer of substantial depth).

2.1.17.1 Method

Equation 2.1-1. Cumulative plastic strain of fine-grained subgrade

εp (%) = a (σd/σs)m Nb

σd = deviator stress from traffic; σs = compressive strength of the soil; N = load cycles; a, b, m depend on soil type (Table 2.1-5).

Table 2.1-5. Plastic strain parameters by soil type (Li and Selig, 1996)
Soila (range)b (range)m (range)
CH fat clay1.2 (0.82 to 1.5)0.18 (0.12 to 0.27)2.4 (1.3 to 3.9)
CL lean clay1.1 (0.3 to 3.5)0.16 (0.08 to 0.34)2.0 (1.0 to 2.6)
MH elastic silt0.840.13 (0.08 to 0.19)2.0 (1.3 to 4.2)
ML silt0.640.10 (0.06 to 0.17)1.7 (1.4 to 2.0)

Equation 2.1-2. Design load and load cycles

Pd = Ps[1 + 33V/(100D)] (V in mph, D in inches; freight speeds only)   N = T/(8Ps)

T = tonnage over the design period in the same units as Ps; use 4 instead of 8 where one truck forms a load pulse (passenger cars). Other wheel loads convert to equivalent cycles with N0 = N(Pdi/Pd)m/b.

Equation 2.1-3. Allowable deviator stress and influence factors

σda = [εpa/(aNb)]1/m σs   Iε = σdaA/Pd   Iρ = 100ρa / [L a (Pd/σsA)m Nb]

A = 1,000 in.² and L = 6 in. make the factors dimensionless. Procedure 1 enters the strain chart with Iε; procedure 2 enters the deformation chart for the soil type with Iρ and T/L. Each chart returns H/L, and the larger H governs.

The published charts were computed with the GEOTRACK multilayer model for granular layer moduli of 20,000, 40,000 and 80,000 psi and subgrade moduli of 2,000 to 16,000 psi. They show why a thicker and stiffer granular layer helps: it moves the subgrade surface farther from the tie and spreads the load, and it evens out the stress across the track. When the subgrade is nearly as stiff as the granular layer, only the first effect remains.

2.1.17.2 Worked example: heavy-axle test track on soft clay

Table 2.1-6. Design inputs from the textbook example, converted to English units (calculator output)
InputValueResultValue
Static wheel load, speed, wheel diameter38.9 kips, 40 mph, 38.2 in.Pd by the AREMA formula52.3 kips
Design tonnage60 MGTEquivalent cycles N385,604
Soil CH: σs, Es, T13.05 psi, 2,000 psi, 4.92 ftAllowable σda (Equation 2.1-3)6.15 psi
Eb40,000 psiIε with Pd = 53.1 kips (textbook value)0.116
εpa, ρa2%, 1.0 in.Iρ0.0474

The textbook used Pd = 53.1 kips (236 kN). Its Iρ of 0.047 is reproduced. Its allowable stress of 47 kPa (6.8 psi) was read from a chart; Equation 2.1-3 gives 6.15 psi, so Iε is 0.116 rather than 0.128.

From the charts the textbook obtains H/L = 4.3 for procedure 1 (H about 26 in.) and H/L = 4.6 for procedure 2 (H about 28 in.), so the deformation criterion governs and about 28 in. of ballast and subballast is needed over this soft clay. The lower allowable stress from the equation would move procedure 1 slightly deeper, but procedure 2 still governs.

Open the Li-Selig trackbed calculator →
Design dynamic wheel load, equivalent load cycles for one or two traffic groups, allowable subgrade deviator stress and the two influence factors for the published design charts.

2.1.17.3 Sources in the library

These documents are in the reference library. The method summaries above are paraphrased; equations are standard or published forms.

  • Railway Geotechnics (Li, Hyslip, Sussmann and Chrismer, 2016), Chapter 5 (Design): failure criteria, design charts, procedures 1 and 2, Example 5.1, and comparisons with test track results.Find source ↗
  • Track Geotechnology and Substructure Management (Selig and Waters, 1994): subgrade failure modes and granular layer function.Find source ↗Library entry
  • Design and Construction of Pavements and Rail Tracks: Geotechnical Aspects and Processed Materials (Balkema): trackbed layer design and processed materials.Find source ↗
← Previous · 1.0 Introduction Chapter 1.1 — Introduction to Railway Ground Hazard Risk Management
Next · 2.0 The Underworld → Chapter 2.2 — Soil and Rock Classification