Authors: Daniel P. Colwell and Mario Ruel. This part was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
References
- AREMA, Manual for Railway Engineering, current edition — Chapter 1, Roadway and Ballast; Chapter 8, Concrete Structures and Foundations.Find source ↗
- Federal Railroad Administration, Track Safety Standards, 49 CFR Part 213 (incl. §213.33 Drainage; §213.63 Track surface).eCFR Part 213 ↗
- Federal Railroad Administration, Bridge Safety Standards, 49 CFR Part 237.eCFR Part 237 ↗
- Two Class I railroads, Guidelines for Temporary Shoring (current edition as issued by the railroads).Find source ↗
- FHWA, HEC-18, Evaluating Scour at Bridges, current edition.Find source ↗
- Selig, E.T. and Waters, J.M. (1994). Track Geotechnology and Substructure Management. Thomas Telford.Find source ↗
- Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press.Find source ↗
- ASTM D698, D1557, D1556, D1586, D1587 (withdrawn 2024), D2166, D2216, D2435, D2487, D2488, D2573, D2974, D3080, D4318, D4327, D4546, D4648, D4767, D4829, D5778, D6429, D6432, D6913, D6938, D7012, G51, G187 — current editions.Official page ↗Library entry
Case studies
- Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §3.7, §8.9, §10.15, §14.14Find source ↗Library entry
Project management sources
- Kelly, J., Male, S. and Graham, D. (2004). Value Management of Construction Projects. Oxford: Blackwell ScienceFind source ↗