AREMA MRE Chapter 8 allows train live load to be represented as an equivalent uniform surcharge on top of the retained fill for wall design:
q_LL = Cooper E-80 wheel load equivalent uniform pressure (psf)
For a rough first check of walls well away from the track, some designers use a uniform surcharge such as:
q_LL = 400 psf (simplified value; not an AREMA value)
Near the track this badly understates the load. AREMA represents the E-80 axle as a strip of about 1,882 psf (80 kips over 5 ft × 8.5 ft) and computes lateral pressure with the strip-load formula (see the box below and Section 7.1.3.1).
This is multiplied by an assumed DLF = 1.3 for dynamic effects, giving a design surcharge:
q_design = DLF × q_LL = 1.3 × 400 = 520 psf
The additional horizontal pressure from this surcharge using Rankine:
Δσ_A(surcharge) = K_A × q_design (psf, uniform with depth)
The resultant surcharge force per foot of wall:
ΔP_surcharge = K_A × q_design × H (lb/ft)
Acting at H/2 above the base (uniform pressure diagram).
For walls within 15 ft of the track centerline (measured horizontally), owner railroads may require a more detailed Boussinesq-based pressure distribution using the actual axle loads rather than the simplified equivalent surcharge.
For excavation support next to active track, a Class I railroad (Public Projects Manual, 2020) requires shoring to be designed for active earth pressure plus a live-load surcharge of 1,882 psf on a continuous strip 8.5 ft wide, with lateral pressure computed by the strip-load formula in AREMA MRE Chapter 8, Part 20. (1,882 psf equals an 80-kip E-80 axle spread over 5 ft of track length and 8.5 ft of width.) This is more than three times the 400-psf uniform value in Section 7.1.3 and, as a strip load, it concentrates pressure in the upper part of the wall. Use the owner’s criterion wherever it applies, and treat the 400-psf equivalent as a preliminary-sizing number only.

Other Class I railroad shoring rules: shoring may be omitted only if the excavation stays outside a 1H:1V line from the bottom corner of the tie and the track is on level ground or in a cut on stable soil. Excavating the toe of an embankment carrying track is not allowed without shoring. Full cofferdams (steel sheeting, or soldier piles and lagging, with wales and struts) are preferred; partial cofferdams open on the side away from the track are allowed where conditions dictate.
Source: A Class I railroad (2020). Public Projects Manual, December 2020 (shoring requirements adjacent to track)
The library's notes on lateral earth pressure give the Rankine and Coulomb coefficients; the railroad problem adds a large, concentrated surcharge from the track. A wall retaining track within a few feet of the tie ends carries more load from the train than from the soil itself, and the load peaks a few feet below the top of the wall, not at the base. The manual's practice for walls retaining track is soldier piles with lagging rather than MSE walls (Chapter 7.1 and the project preferences), and the same pressure diagram is used to size the piles and lagging.
Equation 7.1-1. Coulomb active coefficient (vertical wall back)
with δ = 0 and β = 0 this reduces to the Rankine value tan²(45° − φ/2).
Equation 7.1-2. Lateral pressure from a strip surcharge (Boussinesq)
where βs is the angle subtended by the strip at the point and α the angle to the strip centerline.
| Item | Default | Basis |
|---|---|---|
| Axle load | 80 kips | Cooper E80 design axle |
| Distribution along track | 5 ft | Axle spacing of the E80 driver group |
| Distribution across track | 8.5 ft | Tie length |
| Strip pressure qs | about 1,880 psf | 80,000 lb / (5 ft × 8.5 ft); add impact as the governing standard requires |
| Offset | Entered | Wall face to near end of ties |
| Load component | Thrust | Notes |
|---|---|---|
| Soil, Coulomb Ka = 0.275 | 3.02 kips/ft | φ' = 32°, δ = 21°, γ = 120 pcf |
| Railroad strip surcharge | 7.55 kips/ft | 1,880 psf over 8.5 ft, unyielding-wall solution |
| Total | 10.57 kips/ft | acting 6.79 ft above the base |
Without the train the same wall carries only 3.02 kips/ft, acting at H/3. The surcharge raises the resultant and more than triples the thrust, so the moment in the piles is governed by the railroad load. For a flexible soldier pile wall some designers use the half-space solution (half the surcharge pressure); the calculator offers both so the choice is explicit.
Open the earth pressure calculator →
Rankine or Coulomb coefficients, water, uniform surcharge and an E80-type strip surcharge; pressure diagram, thrust, resultant height and overturning moment.
These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.