For walls that cannot deflect (rigid basement walls, integral abutments, braced excavations), the at-rest coefficient is used:
K₀ = 1 − sin φ' (normally consolidated soils) [Jaky, 1944]
For overconsolidated soils:
K₀(OC) = K₀(NC) × OCR^(sin φ')
The at-rest horizontal earth pressure at depth z is:
σ_h0 = K₀ × γ × z (psf)
where:
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| K₀ | 1 − sin φ' (normally consolidated soils) [Jaky, 1944] | Another equation | K0 = 1 − sin φ' (NC), × OCRsin φ' for OC soil (Jaky; Mayne & Kulhawy). Field: DMT or self-boring pressuremeter. | 0.35–0.65 NC · by USCS group |
| K₀(OC) | K₀(NC) × OCR^(sin φ') | Another equation | K0 = 1 − sin φ' (NC), × OCRsin φ' for OC soil (Jaky; Mayne & Kulhawy). Field: DMT or self-boring pressuremeter. | 0.35–0.65 NC · by USCS group |
| γ | moist unit weight of retained soil (pcf) | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
| z | depth below top of retained earth (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| OCR | preconsolidation stress / OCR | Lab test (or correlation) | Preconsolidation stress from the consolidation curve (Casagrande or work method, ASTM D2435). CPT screening: σ'p ≈ 0.33(qt − σv). OCR = σ'p/σ'v0. | OCR 1 (NC) to > 4 (heavily OC) · by USCS group |
Rankine theory assumes a smooth, vertical wall with a horizontal backfill surface. It is the most commonly applied method for preliminary design and is the usual starting point for walls with a vertical back and level backfill.
K_A = tan²(45° − φ'/2)
K_P = tan²(45° + φ'/2)
Active pressure at depth z:
σ_A = K_A × γ × z − 2c' × √K_A (psf)
Passive pressure at depth z:
σ_P = K_P × γ × z + 2c' × √K_P (psf)
For purely cohesionless backfill (c' = 0, the standard AREMA design assumption):
σ_A = K_A × γ × z
σ_P = K_P × γ × z
Total active force per linear foot of wall (triangular distribution):
P_A = ½ × K_A × γ × H² (lb/ft)
Acting at H/3 above the base for triangular pressure distribution.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| KA | intermediate value computed on this page | Another equation | Computed: K_A = tan²(45° − φ'/2) | project-specific |
| KP | intermediate value computed on this page | Another equation | Computed: K_P = tan²(45° + φ'/2) | project-specific |
| σA | intermediate value computed on this page | Another equation | Computed: σ_A = K_A × γ × z − 2c' × √K_A (psf) | project-specific |
| σP | intermediate value computed on this page | Another equation | Computed: σ_P = K_P × γ × z + 2c' × √K_P (psf) | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
Coulomb theory accounts for wall friction (δ) and backfill slope angle (β). Use it for sloped backfills and battered walls:
K_A(Coulomb) = sin²(α + φ') / { sin²α × sin(α − δ) × [1 + √( sin(φ' + δ) × sin(φ' − β) / (sin(α − δ) × sin(α + β)) )]² }
where:
For the common case of a vertical wall (α = 90°) retaining horizontal fill (β = 0°):
K_A(Coulomb) = cos²φ' / { cos δ × [1 + √(sin(φ' + δ) × sin φ' / cos δ)]² }
Note: Coulomb passive pressure is non-conservative for walls with significant wall friction; use Rankine passive or log-spiral methods for passive resistance calculations.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| KA(Coulomb) | intermediate value computed on this page | Another equation | Computed: K_A(Coulomb) = sin²(α + φ') / { sin²α × sin(α − δ) × [1 + √( sin(φ' + δ) × sin(φ' − β) / (sin(α − δ) × sin(α + β)) )]² } | project-specific |
| α | angle of back face of wall with horizontal (= 90° for vertical wall) (degrees) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| φ' | effective friction angle of retained soil (degrees) | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| δ | wall friction angle (degrees) | Lab test (or fraction of φ') | Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic). | 0.6–1.0 φ' · by USCS group |
| β | slope angle of retained fill surface (degrees) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
In cohesive soils, tension cracking reduces the effective retained height. The tension crack depth is:
z_c = 2c' / (γ × √K_A) (ft)
For design, assume the tension crack is filled with water (worst case). The net active pressure diagram excludes the tension zone, and an additional hydrostatic pressure acts over depth z_c.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |