↑ Parent Menu⌂ Main Menu
← Chapter 7.1 Retaining Structures
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

7.1.0 Executive Summary

Retaining structures are among the most consequential geotechnical elements in railroad capital programs.
Authors: Daniel P. Colwell and Mario Ruel
7.1.0 Executive Summary

Retaining structures are among the most consequential geotechnical elements in railroad capital programs. They support embankments, protect cut slopes, carry track surcharge loads, and define the geometric boundary of right-of-way through urban corridors, bridge approaches, and intermodal facilities. Failures are costly, disruptive, and — given the dynamic loading environment of heavy-haul freight — potentially catastrophic.

This chapter presents the geotechnical design framework for retaining structures in railroad service, organized around the requirements common to owner railroads and grounded in AREMA Manual for Railway Engineering (MRE) Chapter 8 retaining structure provisions and USACE EM 1110-1-1804. We address lateral earth pressure theory (Rankine, Coulomb, at-rest), surcharge loading from Cooper E-80 trains, wall type selection, global stability, drainage, seismic earth pressure by the Mononobe-Okabe method, and client-specific deliverable requirements. All equations are expressed in English units.

Rankine's Lateral Earth Pressure
Rankine's Lateral Earth Pressure
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IX-09 At-rest earth pressure coefficient K₀Use: Uncemented soils on primary unloading. Limits: Not valid on reloading or for compacted fills, where K0 is governed by compaction stresses. Cap at passive limit.
← Previous · 6.0 Analysis Chapter 6.6 — Tunnels and Portals
Next · 7.0 Design → Chapter 7.2 — Ground Improvement Methods