Retaining structures are among the most consequential geotechnical elements in railroad capital programs.
Authors: Daniel P. Colwell and Mario Ruel
7.1.13 Design Checklist

Checklist · Part VII · Stabilization Methods

Design Checklist

Pre-Design Phase0 of 7
Analysis Phase0 of 10
Deliverable Phase0 of 7
Ticks are saved in this browser.
Plain text version

Pre-Design Phase

  • [ ] Confirm retained height, train clearance envelope, and ROW constraints with railroad project engineer
  • [ ] Obtain geotechnical investigation data: borings, SPT, lab classification, shear strength for all zones
  • [ ] Confirm design train loading: Cooper E-80 + DLF per client table
  • [ ] Determine seismic zone (ASCE 7-22 SDC) from USGS NSHM
  • [ ] Review client-specific engineering standards for wall design requirements
  • [ ] Confirm frost depth for embedment design
  • [ ] Identify drainage outlet constraints (outfall location, stormwater permits)

Analysis Phase

  • [ ] Calculate K_A (Rankine or Coulomb as appropriate for geometry)
  • [ ] Calculate K₀ if wall is rigid/non-deflecting
  • [ ] Apply Cooper E-80 surcharge per Section 7.1.3
  • [ ] Check FS_sliding ≥ 1.5 (with and without shear key)
  • [ ] Check FS_OT ≥ 2.0 (moment about toe)
  • [ ] Check middle-third rule (e ≤ B/6)
  • [ ] Check bearing pressure vs. q_allow or q_ult/FS
  • [ ] Perform global stability analysis (Bishop Simplified, FS ≥ 1.5)
  • [ ] Perform seismic check if SDC ≥ B (M-O method; verify seismic FS ≥ 1.1)
  • [ ] Check MSE internal stability (tensile overstress and pullout at all reinforcement levels)

Deliverable Phase

  • [ ] Produce wall section drawing with all dimensions, loading, and resultant locations
  • [ ] Tabulate all FS values in calculation summary table
  • [ ] Specify backfill material: AASHTO No. 57 or equivalent (confirm with the owner railroad's standard)
  • [ ] Include GSP language for wall construction, backfill compaction, and drainage installation
  • [ ] PE seal calculations as required by client
  • [ ] Submit to railroad project engineer for review per client submittal protocol
  • [ ] Resolve all review comments in writing before construction
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IX-09 At-rest earth pressure coefficient K₀Use: Uncemented soils on primary unloading. Limits: Not valid on reloading or for compacted fills, where K0 is governed by compaction stresses. Cap at passive limit.