↑ Parent Menu⌂ Main Menu
← Chapter 7.1 Retaining Structures
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

Author and Sources

Retaining structures are among the most consequential geotechnical elements in railroad capital programs.
Authors: Daniel P. Colwell and Mario Ruel
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

Supplemental references

  • GeoStabilization International (2018). Micropile Tieback Railroad Shoulder Repair, Class I railroad located in Illinois — drawings and construction photographs. AREMA Committee 1 filesFind source ↗
  • GeoStabilization International (2018). Class I railroad Yard Culvert Wall — Micropile Cap (drawings). AREMA Committee 1 filesFind source ↗
  • SHRP2 R02 / GeoTechTools (2012). Micro-piles — fact sheetFind source ↗
  • U.S. Army Corps of Engineers (1994). Design of Sheet Pile Walls. EM 1110-2-2504Official page ↗Library entry
  • U.S. Army Corps of Engineers (1995). Design of Coastal Revetments, Seawalls, and Bulkheads. EM 1110-2-1614Official page ↗Library entry
  • Geosynthetic Research Institute (c. 2000). Geosynthetic Reinforced Segmental Retaining Walls (SRWs) (presentation; cost survey after J. Koerner et al., 1998)Find source ↗
  • A Class I railroad (2020). Public Projects Manual, December 2020 (shoring requirements adjacent to track)Find source ↗
  • Craig Olden, Inc. Composite Gabion Walls (product literature; scanned, text recovered by OCR)Find source ↗
  • Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §13.12, §13.13Find source ↗Library entry

File locations for these documents are listed under Supplemental References.

Project management sources

  • Cretu, O., Stewart, R. and Berends, T. (2011). Risk Management for Design and Construction. Hoboken, NJ: John Wiley & SonsFind source ↗
  • Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & SohnFind source ↗
← Previous · 6.0 Analysis Chapter 6.6 — Tunnels and Portals
Next · 7.0 Design → Chapter 7.2 — Ground Improvement Methods