7.1.19 Compaction-Induced and Wetting-Induced Pressure on Walls
Compacting backfill behind a rigid wall locks in horizontal stress that can exceed the at-rest value near the top of the wall. Wetting a compacted clay backfill that cannot expand sideways raises it further. Both matter for abutments, culvert headwalls and walls that do not yield enough to reach the active state.
Pickles (2012), Eqs. 64.1–64.3 and Fig. 64.6, p. 985. P = effective line load per unit length of the roller (lb/ft); γ = unit weight of the fill. The envelope rises along σh = σv/K0 to σ′h,m at zcr, stays at σ′h,m to hc, then follows K0σv.
Take P from the roller manufacturer's data (static weight plus dynamic force, per unit width of drum). Light plant near the wall keeps P, and so the locked-in pressure, small.
Wetting of compacted clay backfill
In laterally restrained tests on compacted kaolin, wetting raised the lateral stress and so the K0 value; the rise depended on the initial density and compaction water content. K0 on normally consolidated loading was not affected by suction and matched K0 = 1 − sinφ′ (Boyd and Sivakumar, 2011, pp. 87, 101, 103).
The higher the compaction stress, the more a compacted clay swells on wetting (Taibi et al., 2011, p. 52).
A clay backfill compacted dry and dense behind an unyielding wall is therefore the worst case: high locked-in compaction pressure followed by swelling pressure when it gets wet. Use free-draining granular backfill behind rigid walls and drain it (Section 7.1.6), and compact the zone next to the wall with light plant.
Example 7.1-6: Compaction pressure behind a 14-ft rigid wall
A cast-in-place culvert headwall 14 ft high is backfilled with granular fill compacted by a roller whose effective line load is 2,000 lb/ft. Find the compaction pressure envelope and compare the resultant with the at-rest and active thrusts.
Given and required for Example 7.1-6.
Given
Variable
Value
Description
H
14 ft
Wall height
P
2,000 lb/ft
Effective roller line load
γ
120 pcf
Backfill unit weight
φ′
32°
Backfill friction angle
Required
zcr, hc and σ′h,m
Resultant thrust of the compaction envelope against K0 and Ka
σ′h,m = 391 psf from 1.5 to 6.9 ft; resultant about 6.6 kips/ft, 19% above at-rest and 82% above active.
Solution
The compaction envelope controls the upper half of the wall, where the at-rest pressure would be only 86 to 390 psf. For a rigid headwall that is the pressure to design the stem for.
Using lighter compaction plant within a few feet of the wall reduces P and the envelope with it. Add the railroad surcharge (Section 7.1.3.1) and water pressure separately; the earth-pressure calculator now plots this envelope.
Paraphrased from the published sources below; values are converted to English units. Individual railroads, clients and projects are not named.
Pickles, A. (2012). Geotechnical design of retaining walls. Chapter 64 in Burland, J., Chapman, T., Skinner, H. and Brown, M. (eds) (2012). ICE Manual of Geotechnical Engineering, Volume II: Geotechnical Design, Construction and Verification. ICE Publishing, London, pp. 981–1000Find source ↗Library entry
Boyd, J. L. and Sivakumar, V. (2011). Experimental observations of the stress regime in unsaturated compacted clay when laterally confined. Géotechnique 61(4); reprinted in Partial Saturation in Compacted Soils, pp. 87–108Find source ↗
Taibi, S., Fleureau, J. M. et al. (2011). Some aspects of the behaviour of compacted soils along wetting paths. Géotechnique 61(5), 431–437; reprinted in Partial Saturation in Compacted Soils, pp. 45–53Find source ↗