Geotechnical engineering library
Contact
Home
GHRM
LEVI
↑ Parent Menu
⌂ Main Menu
← Chapter 7.1 Retaining Structures
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it
7.1.11 Reference Photographs
Retaining structures are among the most consequential geotechnical elements in railroad capital programs.
Authors:
Daniel P. Colwell
and
Mario Ruel
7.1.0 Executive Summary
Empirical Equations — Use and Limitations
7.1.1 Background and Railroad Context
7.1.2 Lateral Earth Pressure Theory
7.1.3 Surcharge Loading — Cooper E-80 Train Load
7.1.4 Wall Types and Selection
7.1.5 Global Stability of Retaining Structures
7.1.6 Drainage Behind Retaining Walls
7.1.7 Seismic Earth Pressure — Mononobe-Okabe Method
7.1.8 Client-Specific Requirements Summary
7.1.9 Worked Calculation Examples
7.1.10 Representative Data Table
7.1.11 Reference Photographs
7.1.12 Practical Recommendations
7.1.13 Design Checklist
7.1.14 Cross-Reference Table
7.1.15 Practice Questions
7.1.16 Case Studies
7.1.17 Temporary Shoring Next to an Operating Track
7.1.18 Cantilever Sheet Pile Walls by the Blum Method
7.1.19 Compaction-Induced and Wetting-Induced Pressure on Walls
7.1.22 Cantilever Soldier Pile and Lagging Walls
7.1.23 Braced Excavations and Strut Loads
Author and Sources
Supplemental References
← 7.1.10 Representative Data Table
Chapter 7.1 landing page
Full chapter
7.1.12 Practical Recommendations →
7.1.11 Reference Photographs
Passive Earth Pressure
Cantilever Retaining Wall
Completed shored MSE wall with facing, Colorado
Pile Foundation Execution Inspection
photo soil nailed shoring wall under construction colorado
← 7.1.10 Representative Data Table
Chapter 7.1 landing page
Full chapter
7.1.12 Practical Recommendations →
← Previous · 6.0 Analysis
Chapter 6.6 — Tunnels and Portals
Next · 7.0 Design →
Chapter 7.2 — Ground Improvement Methods
×
Click image to zoom · Esc to close
Image could not be loaded.
‹
−
100%
+
Fit
1:1
›
×
Scroll or pinch to zoom · drag to pan · double-click to zoom in/out · arrow keys pan when zoomed