Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. The Case Studies section summarizes case studies from item S11 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.
- GeoStabilization International (2018). Micropile Tieback Railroad Shoulder Repair, Class I railroad located in Illinois — drawings and construction photographs. AREMA Committee 1 filesFind source ↗
- GeoStabilization International (2018). Class I railroad Yard Culvert Wall — Micropile Cap (drawings). AREMA Committee 1 filesFind source ↗
- SHRP2 R02 / GeoTechTools (2012). Micro-piles — fact sheetFind source ↗
- U.S. Army Corps of Engineers (1994). Design of Sheet Pile Walls. EM 1110-2-2504Find source ↗Library entry
- U.S. Army Corps of Engineers (1995). Design of Coastal Revetments, Seawalls, and Bulkheads. EM 1110-2-1614Find source ↗Library entry
- Geosynthetic Research Institute (c. 2000). Geosynthetic Reinforced Segmental Retaining Walls (SRWs) (presentation; cost survey after J. Koerner et al., 1998)Find source ↗
- A Class I railroad (2020). Public Projects Manual, December 2020 (shoring requirements adjacent to track)Find source ↗
- Craig Olden, Inc. Composite Gabion Walls (product literature; scanned, text recovered by OCR)Find source ↗
- Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
- Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
- Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. Leiden: CRC Press/Balkema (Taylor & Francis). ISBN 978-1-032-10470-6. Case studies used on this page: §13.12, §13.13Find source ↗Library entry
- Cretu, O., Stewart, R. and Berends, T. (2011). Risk Management for Design and Construction. Hoboken, NJ: John Wiley & Sons. Used on this page for project-management materialFind source ↗
- Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & Sohn. Used on this page for project-management materialFind source ↗
- Goswami, I. (2015). Civil Engineering All-In-One PE Exam Guide: Breadth and Depth, 3rd ed. New York: McGraw-Hill Education. Used on this page: Section 7.1.12 (wall damage, inspection and backfill rating)Find source ↗
Photograph credits
The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.
- Photo 7.1.4-1 — Soil-nailed shoring wall of a shored MSE wall project in Colorado, under construction. (Photo courtesy of Colorado DOT.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-2 — The same shored MSE wall project, complete with facing. (Photo courtesy of Colorado DOT.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-3 — Generic cross section of an SMSE wall system, showing the shoring wall and MSE wall components. (Figure from Morrison et al., 2006.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-4 — Installation of ground anchors to stabilize the Mississippi loess, Natchez Bluff. (Photograph by Kenneth Bergeron; from Fairweather, 1997.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-5 — Typical cross section of the soil nail and MSE wall system used at US Highway 26-89. (Turner and Jensen, 2005; with permission from ASCE.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-6 — Soil nail load test. (From FHWA.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-7 — Drilling a nail hole. (From FHWA.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-8 — Grouting a nail hole. (From FHWA.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-9 — Shotcreting the face. (From FHWA.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-10 — Mechanically stabilized earth mass — principal elements. (Figure from Berg et al. (2009).) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-11 — MSE wall construction on MnDOT Crosstown Project, 2008. Photograph courtesy of Ryan Berg. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.4-12 — SeaTac Airport runway extension MSE wall. Photograph courtesy of Tony Allen. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.17-1 — SOIL SCREW® installation equipment. (From abchance.com.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.17-2 — SOIL SCREW® being installed. (From abchance.com.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.17-3 — Screw-in soil nail wall face before shotcrete. (From abchance.com.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 7.1.17-4 — Shotcrete application. (From abchance.com.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗