↑ Parent Menu⌂ Main Menu
← Chapter 7.1 Retaining Structures
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

7.1.7 Seismic Earth Pressure — Mononobe-Okabe Method

Retaining structures are among the most consequential geotechnical elements in railroad capital programs.
Authors: Daniel P. Colwell and Mario Ruel
7.1.7 Seismic Earth Pressure — Mononobe-Okabe Method

For walls in seismically active zones where the owner railroad or the governing code requires a seismic check (commonly SDC C and D), add the seismic earth pressure increment to the static active pressure. Passenger railroads commonly require seismic design for mainline walls.

The Mononobe-Okabe (M-O) total active force:

P_AE = ½ × γ × H² × (1 − k_v) × K_AE (lb/ft)

where:

K_AE = cos²(φ' − θ − α) / { cosθ × cos²α × cos(δ + α + θ) × [1 + √(sin(φ' + δ) × sin(φ' − θ − β) / (cos(α + θ + δ) × cos(α − β)))]² }

and:

θ = arctan(k_h / (1 − k_v))

  • k_h = horizontal seismic coefficient (commonly 0.5 × A_s for walls free to move 1–2 in., where A_s = F_PGA × PGA; AASHTO LRFD, or per site-specific analysis)
  • k_v = vertical seismic coefficient (typically 0 to ½ k_h)
  • S_DS = design spectral acceleration at short periods (ASCE 7-22, g)
  • α = inclination of the wall back from vertical (0 for a vertical wall; note this differs from the Coulomb α in Section 7.1.2.3); other variables as defined there

The seismic earth pressure increment:

ΔP_AE = P_AE − P_A (lb/ft)

Per Seed and Whitman (1970), this increment is assumed to act at 0.6H above the base:

M_AE = ΔP_AE × 0.6H + P_A × H/3 (ft·lb/ft)

← Previous · 6.0 Analysis Chapter 6.6 — Tunnels and Portals
Next · 7.0 Design → Chapter 7.2 — Ground Improvement Methods