7.1.10 Representative Data Table

Retaining structures are among the most consequential geotechnical elements in railroad capital programs.
Authors: Daniel P. Colwell and Mario Ruel
7.1.10 Representative Data Table
Table 7.1-3. Summary of Retaining Wall Parameters — Illustrative Railroad Wall Cases
ProjectClientWall TypeH (ft)Backfill φ' (°)K_AP_A (lb/ft)q_surcharge (psf)FS_slideFS_OTSeismic
Shenandoah Ext.Class ICantilever RC20340.2546,0965201.582.12*No
KC IntermodalClass IMSE Geogrid30360.26014,6255201.822.45No
Cascades Ext.Class IGravity Conc.15320.3074,1515201.521.18 seismicYes
Passenger corridor ViaductPassengerSoldier Pile25300.33312,500520N/AN/AYes
Prairie YardClass IMSE Geogrid18350.2715,2704001.922.60No
Gulf Coast Ext.Short lineCantilever RC12280.3613,1144001.652.10No
Western Div.Class IGravity Conc.10300.3332,0004001.802.50No

*After widening the base to 14 ft. The first three rows come from Examples 16-1 to 16-3; the other rows are illustrative, not project records. P_A uses γ = 120 pcf (125 pcf for the KC row).