↑ Parent Menu⌂ Main Menu
← Chapter 7.1 Retaining Structures
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

7.1.22 Cantilever Soldier Pile and Lagging Walls

Retaining structures are among the most consequential geotechnical elements in railroad capital programs.
Authors: Daniel P. Colwell and Mario Ruel
7.1.22 Cantilever Soldier Pile and Lagging Walls

Soldier piles with lagging are this manual’s standard wall for stabilizing a slope or shoring an excavation next to track: the piles are driven or set in drilled holes from the shoulder, the lagging goes in as the face is excavated, and nothing has to be built behind the wall under the track. A cantilever wall relies only on the embedment of the piles below the excavation, so it suits retained heights up to about 10 to 15 ft; above that, or where deflection limits are tight, tiebacks or rakers are added (Section 7.1.4.7 for anchor bond). The analysis differs from a sheet pile wall (Section 7.1.18) in two ways. Above the excavation the lagging collects earth and surcharge pressure over the full pile spacing and delivers it to each pile. Below the excavation the pile is a discrete element and mobilizes passive resistance over more than its own width.

7.1.22.1 Method

Driving load per pile per foot of depth is w = s(Kaγz + Kaq + σE80) above the excavation and b(Kaσv + Kaq + σE80) below it, where σE80 is the Cooper E80 strip pressure of Section 7.1.17 (Eq. 7.1-3). Passive resistance below the excavation follows Eq. 7.1-6 (discrete pile) or the arching factor below, divided by a factor of safety. The embedment D0 is found from moment equilibrium about the toe and increased by 20% (some guidelines 30%) for the reverse pressure near the toe, as for the sheet pile wall.

Equation 7.1-9. Passive resistance of a soldier pile by the arching factor

Pp = Kpγd × min(f·b, s) / FS;   f = 0.08φ′ ≤ 3.0

Caltrans Trenching and Shoring Manual; d = depth below the excavation; b = flange width or drilled-hole diameter; s = spacing. Railroad temporary shoring commonly applies FS = 1.5 to passive resistance.

Equation 7.1-10. Timber lagging thickness

M = p·l²/8;   t = √(6M / (12Fb))

p = design pressure behind the lagging (psf), reduced for soil arching where permitted; l = clear span between flanges (ft); M in lb-in. per ft of height; Fb = allowable bending stress of the timber (psi).

The maximum moment per pile occurs at the point of zero shear below the excavation; the required section modulus is M/fb. Deflection, not strength, usually governs next to track: the railroad shoring guidelines limit horizontal movement within the track influence zone, so check deflection with a beam-on-spring or p-y model, and add anchors where the cantilever is too flexible.

7.1.22.2 Worked example

Example 7.1-8: Cantilever Soldier Pile Wall Beside Track

A 10-ft cut for a drainage structure on a Class I railroad located in Georgia is shored with a cantilever soldier pile wall whose face is 16 ft from the nearest track centerline. Piles are set in 24-in. drilled holes at 8-ft centers, with timber lagging.

trackS = 16 ftH = 10 ftD = ?γ 120, φ′ 32°dense sandγ 125, φ′ 34°q = 250 psfGivenH = 10 ft; piles 24 in. at s = 8 ftφ′ = 32° above, 34° belowq = 250 psf; E80 at S = 16 ftFS passive 1.5; fb 33 ksiRequiredEmbedment D, pile lengthMmax and section modulusLagging thickness
Cantilever soldier pile wall shoring a 10-ft cut 16 ft from track centerline.

Given

VariableValueDescription
H10 ftRetained height
s, b8 ft; 24 in. = 2.0 ftSpacing; hole diameter
Retained soilγ = 120 pcf, φ′ = 32°Above the excavation
Embedment soilγ = 125 pcf, φ′ = 34°Dense sand below
q250 psfConstruction and spoil surcharge
E8080,000/(5 × 9) = 1,778 psf strip, 9 ft wideTrack centerline 16 ft from the wall
FSp1.5On passive resistance
fb, Fb33 ksi; 1,000 psiPile; timber lagging

Required

  • Embedment and pile length
  • Maximum moment and required section modulus per pile
  • Lagging thickness

Equations

  1. Rankine: Ka = tan²(45° − φ′/2); Kp = tan²(45° + φ′/2)
  2. Eq. 7.1-3: σE80 = (2q/π)(β − sinβ cos2α); R = 2qHβ/π — train surcharge
  3. Eq. 7.1-9: Pp = Kpγd × f·b/FS — passive per pile
  4. ΣMtoe = 0 → D0; D = 1.2D0 — embedment
  5. Eq. 7.1-10: t = √(6M/(12Fb)) — lagging

Steps

Step 1 · Coefficients
Ka = tan²29°; Kp = tan²62°; f = 0.08 × 34 = 2.72
Ka = 0.307; Kp = 3.54; f·b = 5.44 ft
↓
Step 2 · Load above the excavation
Earth and surcharge: 8 × (0.5 × 0.307 × 120 × 10² + 0.307 × 250 × 10) = 20.9 kips; E80: x1 = 11.5, x2 = 20.5 ft, β = 0.262 rad, R = 2 × 1,778 × 10 × 0.262/π = 2.97 kips/ft × 8 ft = 23.7 kips
44.6 kips per pile
Spot check: The calculator’s integrated shear at the excavation, 44.55 kips, matches the hand sum. The train adds more load than the soil.
↓
Step 3 · Pressure at the excavation level
0.307 × 120 × 10 + 0.307 × 250 + σE80(10 ft) = 368 + 77 + 411
856 psf; 6.85 kips/ft on the pile
↓
Step 4 · Embedment (moment about the toe)
Solve ∫(w − Pp)(H + D0 − z)dz = 0
D0 = 16.3 ft; D = 1.2 × 16.3 = 19.6 ft; pile 29.6 ft
Spot check: At 5 ft below the excavation the factored passive resistance is 3.54 × 125 × 5 × 5.44/1.5 = 8.0 kips/ft against 1.9 kips/ft of driving load; resistance builds with depth as the plot in the calculator shows.
↓
Step 5 · Moment and section
Zero shear 8.7 ft below the excavation; S = 452.6 × 12 / 33
Mmax = 452.6 kip-ft; S = 164.6 in.³
↓
Step 6 · Lagging (Eq. 7.1-10)
p = 855 psf (no arching reduction in the track zone); l = 8 − 2 = 6 ft; M = 855 × 6²/8 × 12 = 46,170 lb-in.; t = √(6 × 46,170/(12 × 1,000))
t = 4.8 in.
↓
Solution
Embed the piles 19.6 ft (about 30-ft piles); section modulus at least 165 in.³ per pile; 5-in. (nominal 6-in.) lagging, or less if arching is accepted.

Solution

A cantilever wall works in strength with 30-ft piles, a section of at least 165 in.³ (for example a W21×83 at 171 in.³ set in the drilled hole) and 5-in. lagging.

The train surcharge more than doubles the load on the wall, and the cantilever will be flexible: at 10 ft retained and 16 ft from track, expect deflection near the railroad’s limit. Run a deflection check before submitting; if it fails, a single row of tiebacks at about 3 ft below the top cuts both moment and deflection sharply. Where the railroad accepts a 0.6 arching factor on lagging pressure, the computed lagging falls to about 3.7 in., and 4-in. rough-cut boards would do.

Open the soldier pile wall calculator →
Active pressure over the spacing and the pile width, uniform and E80 strip surcharges, passive resistance by the arching factor or Eq. 7.1-6 (with softened clay), embedment by moment equilibrium, maximum moment, section modulus and lagging thickness.

7.1.22.3 Sources

The summaries above are paraphrased in original wording; equations and tabulated values are standard or published. Individual railroads, clients, companies and projects are not named.

  • Caltrans, Trenching and Shoring Manual (2011): soldier pile walls, arching capability factor, lagging design.Find source ↗
  • CIRIA C580 and Pickles (2012), as summarized in Section 7.1.4.7: discrete-pile passive resistance and softening.Find source ↗
  • Joint Class I railroad guidelines for temporary shoring: E80 Boussinesq strip method, clearance, deflection and embedment requirements (Section 7.1.17).Find source ↗
  • FHWA-RD-75-128, Lateral Support Systems and Underpinning: lagging pressure and soil arching.Find source ↗
← Previous · 6.0 Analysis Chapter 6.6 — Tunnels and Portals
Next · 7.0 Design → Chapter 7.2 — Ground Improvement Methods