5.1.2 Cone Penetration Test (CPT and CPTu)

In situ testing provides continuous or near-continuous soil and rock characterization without the inherent sample disturbance associated with laboratory testing.
Authors: Daniel P. Colwell and Mario Ruel
5.1.2 Cone Penetration Test (CPT and CPTu)
At a glance. Provides: Continuous qt, fs and u2 profile; soil behavior type; su, OCR, φ′, modulus and k by correlation. Used for: Stratigraphy between borings, embankment stability, settlement, pile capacity and liquefaction. Catalogue entry
5.1.2.1 Test Procedure and Equipment

The CPT advances a 1.41-in.-diameter cone at a rate of 0.8 in./sec per ASTM D5778. The standard cone has a projected tip area of 1.55 in² and a friction sleeve area of 23.25 in². The piezocone (CPTu) adds a porous filter element — typically at the u₂ position (shoulder behind tip) — to measure pore water pressure during advancement.

CPT Interpretation
CPT Interpretation

Measurements recorded per ASTM D5778:

  • q_c — measured tip resistance (tsf or psi)
  • f_s — sleeve friction (psi or ksf)
  • u₂ — pore water pressure at shoulder (psi) [CPTu only]
5.1.2.2 Corrected Tip Resistance

For CPTu, the measured tip resistance is corrected for unequal area effects:

Equation 5.1-1 — Corrected Total Tip Resistance:

q_t = q_c + u₂ × (1 − a)

Where:

  • q_t = corrected total tip resistance (tsf)
  • q_c = measured tip resistance (tsf)
  • u₂ = measured pore water pressure at shoulder (tsf); [Note: 1 psi = 0.072 tsf; 1 tsf = 13.89 psi]
  • a = net area ratio of cone (dimensionless); typically 0.75–0.85; confirm from manufacturer certificate
Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
qtCPT tip resistance = q_c + u₂ × (1 − a)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
qcmeasured tip resistance (tsf)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
u₂measured pore water pressure at shoulder (tsf)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
anet area ratio of cone (dimensionless)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.typically 0.75–0.85
Cone Penetration Test
Cone Penetration Test
5.1.2.3 Friction Ratio and Soil Behavior Type

The friction ratio is used for soil behavior type (SBT) classification:

Equation 5.1-2 — Friction Ratio:

R_f (%) = (f_s / q_c) × 100

Robertson (1990) SBT zones are used to classify soil type without physical samples. A simplified guide:

SBT ZoneR_f (%)q_c (tsf)Typical Soil
1>4<5Sensitive fine-grained
2>35–25Organic / peat
32–45–50Clay — low to medium OCR
41–210–100Silt mixture
50.5–1.550–200Sand mixture
6<0.5>100Clean sand
7<0.5>300Dense sand / gravel
9>2>100Very stiff fine-grained
Figure 5.1-13. Borehole log used to build the peat cross-section.
Figure 5.1-13. Borehole log used to build the peat cross-section.
Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
qtCPT tip resistanceField testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
5.1.2.4 Undrained Shear Strength from CPTu (N_kt Method)

No additional content.

Equation 5.1-3 — Undrained Shear Strength:

s_u = (q_t − σ_v) / N_kt

Where:

  • s_u = undrained shear strength (tsf)
  • q_t = corrected tip resistance (tsf)
  • σ_v = total vertical stress at depth of interest (tsf) = γ × z / 2,000 [γ in pcf, z in ft, result in tsf]
  • N_kt = cone factor (dimensionless); typically 10–18; use 14 for normally consolidated clays unless site-calibrated
Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
suundrained shear strength = (q_t − σ_v) / N_ktLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
qtcorrected tip resistance (tsf)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
σvtotal vertical stress at depth of interest (tsf) = γ × z / 2,000 [γ in pcf, z in ft, result in tsf]Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Nktcone factor (dimensionless)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.typically 10–18
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
Equation 5.1-4 — Pore Pressure Ratio:

B_q = (u₂ − u₀) / (q_t − σ_v)

Where u₀ = hydrostatic pore pressure (tsf) = γ_w × h_w / 2,000; γ_w = 62.4 pcf, h_w = depth below water table (ft). B_q > 0.4 typically indicates soft, normally consolidated or sensitive clay — a critical flag on high-speed passenger corridor and Class I railroad alignments located in the Great Lakes region.

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
BqCPT tip resistance = (u₂ − u₀) / (q_t − σ_v)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
u₀hydrostatic pore pressure (tsf) = γ_w × h_w / 2,000Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
γw62.4 pcf, h_w = depth below water table (ft)ConstantPhysical constant or standard value.typically indicates soft, normally consolidated or sensitive clay — a critical flag on Amt
5.1.2.5 Normalized CPT Parameters for Liquefaction Screening

Chapter 6.5 presents the full liquefaction procedure; the key normalized parameter needed from CPT is:

Equation 5.1-5 — Normalized Tip Resistance:

q_c1N = (q_c / P_a) × (P_a / σ'_v)^0.5

Where:

  • q_c = measured tip resistance (tsf); P_a = 2,117 psf = 1.058 tsf
  • σ'_v = vertical effective stress (tsf)
  • q_c1N = dimensionless; used directly in CRR correlation (Youd et al. 2001)

Confirm with the owner railroad whether CPT-based screening is accepted for the project.

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
qc1NCPT tip resistance = (q_c / P_a) × (P_a / σ'_v)^0.5Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
qcmeasured tip resistance (tsf)Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
Pa2,117 psf = 1.058 tsfConstantPhysical constant or standard value.project-specific
σ'vvertical effective stress (tsf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Supplemental reference

Normalized soil behavior type and the index Ic

The non-normalized zones in Section 5.1.2.3 drift with depth because qc rises with overburden. Robertson’s normalized chart (Figure 7-S1) removes that effect and collapses the zone boundaries into one number:

Normalized CPT soil behavior type (SBT<sub>N</sub>) chart, Q<sub>t</sub>&ndash;F<sub>r</sub>, with I<sub>c</sub> boundaries and trends for OCR, density and sensitivity (Robertson, 1990; updated 2010).
Supplemental Figure 7-S1. Normalized CPT soil behavior type (SBTN) chart, Qt–Fr, with Ic boundaries and trends for OCR, density and sensitivity (Robertson, 1990; updated 2010). Source: Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc., p. 27.

Ic = [ (3.47 − log Qt)2 + (log Fr + 1.22)2 ]0.5, with Qt = (qt − σvo)/σ′vo and Fr = fs/(qt − σvo) × 100%.

ZoneSoil behavior typeIc(qc/pa)/N60
1Sensitive, fine grainedN/A2.0
2Organic soils – clay> 3.61.0
3Clays – silty clay to clay2.95–3.61.5
4Silt mixtures – clayey silt to silty clay2.60–2.952.0
5Sand mixtures – silty sand to sandy silt2.05–2.603.0
6Sands – clean sand to silty sand1.31–2.055.0
7Gravelly sand to dense sand< 1.316.0
8Very stiff sand to clayey sand*N/A5.0
9Very stiff fine-grained*N/A1.0
CPT for Cohesive Soils
CPT for Cohesive Soils

* Heavily overconsolidated or cemented. Normalized SBT has better than 80% agreement with samples in independent studies (Robertson & Cabal, 2010). Apply the q/N ratios to qt in soft fine-grained soils.

Dissipation tests and ch

Stopping the push and recording pore-pressure decay gives t50, the time to 50% dissipation, which yields the horizontal coefficient of consolidation (Robertson and Cabal report accuracy of about ± half an order of magnitude but excellent repeatability within a profile). Convert to vertical with cv = ch(kv/kh). Watch for dilative silts where u2 rises before it falls — run the test to true equilibrium, or measure t50 from the peak. In plastic clays dissipation can take many hours, so budget rig time accordingly on track-window-limited projects.

CPT calibration checks

Robertson and Cabal recommend recording zero-load readings at the start and end of every sounding and checking wear, O-ring seals, push rods and the pore-pressure filter at the start and end of each test, with load-cell calibration at least every three months (or before and after major projects).

Source: Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.

Case: CPT with boreholes at a peat settlement site on a Canadian main line

About 400 ft of track on a Class I railroad line located in northern Alberta was settling differentially into deep peat. Boreholes (including DH-1 and DH-3) built the stratigraphic section, and a track-mounted CPT rig filled in between them to define the depth and extent of the organic layer. The resulting design used 68 piles of 18-in. diameter, installed in two flights at 10° from vertical, to carry track load through the peat (see Chapter 6.1). Simple hand checks also help: at another site in the Rocky Mountain trench, clay that a thumb could penetrate an inch or more ruled out heavy equipment and rain-day work.

Figure 5.1-12. Track-mounted CPT rig at the peat site.
Figure 5.1-12. Track-mounted CPT rig at the peat site.
Figure 5.1-14. Field consistency check by boot and thumb.
Figure 5.1-14. Field consistency check by boot and thumb.

After Geotechnology for Railroaders Program, Module 6.2, Module 6.1; Module 6.2 §05; Module 6.1 §03. Full reference under Supplemental References.

5.1.2.6 Piezocone (CPTu) Interpretation for Track Subgrade

The cone penetration test gives a continuous profile in minutes, which suits a long corridor where thin soft layers and lenses matter more than a few samples. Look's Handbook of Geotechnical Investigation and Design Tables and the FHWA's Evaluation of Soil and Rock Properties (GEC 5) give the standard interpretation. The tip resistance is corrected for pore pressure acting behind the cone. Soil type is judged from the friction ratio, checked against tip resistance and the pore-pressure ratio. Strength, stress history and friction angle then follow from empirical correlations. A dissipation test gives the horizontal coefficient of consolidation, the property that controls the wick drain design in Chapter 7.2. Simons, Menzies and Matthews' Short Course in Geotechnical Site Investigation and the Corps of Engineers' EM 1110-1-1804 place the CPT within an investigation and recommend calibrating it against borings and laboratory tests.

5.1.2.6.1 Interpretation

Table 5.1-4. CPTu relationships used
QuantityRelationshipSource
Corrected tip resistanceqt = qc + (1 − a)u2Look
Friction ratio; pore pressure ratioFR = fs/qt; Bq = (u2 − u0)/(qt − σvo)Look
Soil type from FR< 1% coarse to medium sand; 1–2% fine or silty sand; 2–5% clays; > 5% peatLook, Table 5.13
Undrained strengthsu = (qt − σvo)/Nkt, Nkt about 10 to 20 (15 typical)GEC 5, Table 33
Preconsolidation stressσ′p = 0.33(qt − σvo)GEC 5, Eq. 41
Friction angle, clean sandφ′ = 17.6° + 11.0 log[(qc/pa)/(σ′vo/pa)0.5]GEC 5
Horizontal consolidationch = T*a²√Ir/t50, T* = 0.245 (u2)GEC 5 (Teh and Houlsby)

5.1.2.6.2 Worked example

The example sounding passes through 6 ft of dense sand fill, about 12 ft of soft clay, and dense sand below. The clay readings give su as low as 479 psf with Nkt = 15. A dissipation test at a 6.9-minute t50 (the same reading and rigidity index as GEC 5's worked example, which gives 29 × 10−3 cm²/s) gives ch = 2.64 ft²/day. That value goes straight into the wick drain calculator. The sands give φ′ of about 41° to 42°. Near the surface the correlation tends to run high because the overburden stress is small.

Push CPTs off the track where possible, at the toe or on the shoulder, and pair at least one with a sampled boring in each soft deposit to calibrate Nkt. Record the cone's net area ratio and u2; without them qt cannot be corrected, and the correction matters most in soft clay where qc is small and u2 is large.

Open the CPTu interpretation calculator →
Corrected tip resistance, friction ratio, Bq, soil type, undrained strength, OCR and friction angle for each reading, plus ch from a dissipation test, with a depth profile.

5.1.2.6.3 Reference values

Table 5.1-5. Modified time factors T* for dissipation tests (Teh and Houlsby, in GEC 5 Table 27)
U (%)1 − UT*, filter at mid-face (u1)T*, filter behind the tip (u2)
200.80.0140.038
300.70.0320.078
400.60.0630.142
500.50.1180.245
600.40.2260.439
700.30.4630.804
800.21.041.60

U is measured from the initial excess pore pressure, not the peak reading, where the two differ.

Table 5.1-6. First-order preconsolidation stress from in situ tests, intact clays (GEC 5, Equations 41 to 46)
TestRelationship
Cone (CPT)σ′p = 0.33(qT − σvo)
Piezocone, face elementσ′p = 0.47(u1 − u0)
Piezocone, shoulder elementσ′p = 0.54(u2 − u0)
Flat dilatometerσ′p = 0.51(p0 − u0)
Self-boring pressuremeterσ′p = 0.45pL
Field vaneσ′p = 3.54su,VST

Fissured clays fall outside these trends; benchmark against oedometer tests.

Table 5.1-7. Cone factor NkT and the reference strength it reproduces (GEC 5, Table 33)
NkTMatches undrained strength from
10Triaxial compression
15Direct simple shear (common default)
20Triaxial extension

GEC 5 notes that 15 is a commonly used value, but the right factor depends on the deposit; calibrate it against laboratory or vane strengths.

Table 5.1-8. Pore pressure ratio and soil type (after Look, Table 5.12)
BqNon-cohesiveCohesive
0.0 to 0.2Dense sand (qT > 52 tsf, 5 MPa)Hard or stiff overconsolidated soil (qT > 104 tsf, 10 MPa)
0.0 to 0.4Medium or loose sand (21 to 52 tsf, 2 to 5 MPa)Stiff clay or silt (10 to 21 tsf, 1 to 2 MPa)
0.2 to 0.8Firm clay or fine silt (qT < 10 tsf, 1 MPa)
0.8 to 1.0Soft clay (qT < 5 tsf, 0.5 MPa)
> 0.8Very soft clay (qT < 2 tsf, 0.2 MPa)

1 MPa is about 10.4 tsf.

5.1.2.6.4 Checks on the worked example

The dissipation method was checked against GEC 5's worked example (a u2 cone, radius 0.70 in. (1.78 cm), Ir = 230). The table repeats the calculation at every stage of dissipation. The computed ch rises as dissipation proceeds, so state which stage was used; the calculator uses the 50% value. The profile below is the worked example sounding, with qt and the undrained strength interpreted in the clay.

Table 5.1-9. ch at each stage of dissipation, GEC 5 Table A-6 and the calculator's equation
Normalized excess pore pressureT* (u2)Time (min)ch, GEC 5 (10−3 cm²/s)ch, recomputed
0.80.0381.91616
0.70.0783.12020
0.60.1424.62525
0.50.2456.92928
0.40.43910.43434
0.30.80415.94140
0.21.600264949
05010015005101520qt (tsf); su (psf / 100)Depth (ft)qt (tsf)su in clay (psf / 100)
Figure 5.1-15. Worked example sounding: corrected tip resistance, and undrained strength in the clay (Nkt = 15).

5.1.2.6.5 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • B.G. Look, Handbook of Geotechnical Investigation and Design Tables (2007): CPT parameters, soil classification from cone resistance, friction ratio and BqFind source ↗
  • P.J. Sabatini and others, Evaluation of Soil and Rock Properties, FHWA Geotechnical Engineering Circular No. 5: CPT correlations for su, σ′p and φ′, and dissipation analysisFind source ↗Library entry
  • N. Simons, B. Menzies and M. Matthews, A Short Course in Geotechnical Site Investigation: planning and quality of site investigationsFind source ↗
  • U.S. Army Corps of Engineers, Geotechnical Investigations, EM 1110-1-1804 (2001): investigation methods and in situ testingOfficial page ↗