↑ Parent Menu⌂ Main Menu
← Chapter 5.1 In Situ Testing
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

Empirical Equations — Use and Limitations

In situ testing provides continuous or near-continuous soil and rock characterization without the inherent sample disturbance associated with laboratory testing.
Authors: Daniel P. Colwell and Mario Ruel
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
IS-12Corrected cone resistanceqₜ
IS-14Undrained shear strength from CPTSᵤ
IS-18Shear-wave velocity from CPTVₛ
IS-23Flat dilatometer (DMT) intermediate parametersI_D, K_D, E_D
IS-24OCR, K₀ and Sᵤ of clay from DMTOCR, K₀, Sᵤ
IS-25Field vane strength correctionSᵤ (field)
IX-09At-rest earth pressure coefficientK₀
IX-13Small-strain shear modulus (Hardin)G_max
IS-13Soil behaviour type index (normalized)I꜀ / Qₜₙ / Fᵣ
IS-15Friction angle of sand from CPTφ'
IS-16Relative density of sand from CPTDᵣ
IS-17Preconsolidation stress / OCR from CPTσ'ₚ, OCR
IS-19Constrained modulus from CPTM
IS-20Hydraulic conductivity from CPTk
IS-21Soil unit weight from CPTγ
← Previous · 4.0 Subsurface Exploration Chapter 4.1 — Borings and Sampling
Next · 5.0 Testing → Chapter 5.2 — Laboratory Testing Program