The prebored pressuremeter test (ASTM D4719) is performed in a borehole by expanding a cylindrical membrane against the borehole wall and measuring volume change versus applied pressure. The self-boring pressuremeter (SBP) minimizes disturbance but is rarely warranted on standard railroad projects. The full-displacement PMT (FDPMT) is useful in soft clays and has been used on high-speed passenger corridor foundation studies.
Three pressure phases define the PMT curve:
No additional content.
E_PMT = 2(1 + ν) × V_m × ΔP/ΔV
Where:
For preliminary design, E_PMT is correlated to the elastic modulus of soil (E_s) for settlement analysis (Chapter 6.2) using E_s ≈ E_PMT / α, where Ménard's rheological factor α is about 1.0 for overconsolidated clay, 0.67 for normally consolidated clay and 0.5 for weathered or remolded clay.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| EPMT | soil elastic modulus = 2(1 + ν) × V_m × ΔP/ΔV | Field test, lab test or correlation | Pressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc. | loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group |
| ν | Poisson's ratio (0.33 for drained, 0.50 for undrained) | Assumed (published values) | Rarely measured; choose from published ranges. Use 0.5 for undrained clay. | 0.25–0.40; 0.5 undrained · by USCS group |
| Vm | mean volume of cavity during elastic phase (ft³) | Another equation | Computed: V_m = (V_0 + V_f)/2 | project-specific |
| V0 | initial borehole volume, V_f = volume at end of elastic phase | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| ΔP/ΔV | slope of pressure–volume curve in elastic phase (psf/ft³) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
No additional content.
s_u = (p_L − p_0) / N_p
Where:
The PMT is particularly useful where borings encounter interbedded rock and soft clay and CPT advancement is impractical, as in parts of the Appalachian ridges.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| su | undrained shear strength = (p_L − p_0) / N_p | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
| pL | limit pressure (ksf or psf) | Field test | Read from the in-situ test record: pressuremeter (ASTM D4719), flat dilatometer (D6635) or field vane (D2573). | project-specific |
| p0 | vertical stress / pore pressure = at-rest horizontal total stress (psf) = K₀ × σ'_v + u₀ | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
| Np | PMT bearing capacity factor | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | typically 6.2–7.5 for clays |