The Marchetti flat dilatometer (ASTM D6635, withdrawn 2024) is a blade with a flexible 2.36-in. diameter steel membrane pushed into the ground. Two pressure readings are taken at each depth: the "A" pressure (membrane lift-off) and the "B" pressure (membrane expansion to 0.043 in.). A third reading "C" (deflation) is optional but recommended in soft clays for pore pressure estimation.
The DMT provides three intermediate parameters:
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
I_D = (p_1 − p_0) / (p_0 − u₀)
K_D = (p_0 − u₀) / σ'_v
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| σ'v | vertical stress / pore pressure | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
E_D = 34.7 × (p_1 − p_0)
Where p_0 and p_1 are corrected contact and expansion pressures (psf); correction equations (ASTM D6635, withdrawn 2024 Annex A1) account for membrane stiffness gauge factors ΔA and ΔB.
Soil classification by I_D:
| I_D | Soil Type |
|---|---|
| < 0.6 | Clay |
| 0.6 – 1.8 | Silt |
| > 1.8 | Sand |
K_D interpretation: K_D ≈ 2 in normally consolidated clay; higher values indicate overconsolidation. OCR ≈ (0.5 K_D)^1.56 for clays with I_D < 1.2 (Marchetti 1980).
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| ED | soil elastic modulus = 34.7 × (p_1 − p_0) | Field test, lab test or correlation | Pressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc. | loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group |
No additional content.
M_DMT = R_M × E_D
Where R_M is a correction factor (dimensionless):
M_DMT is analogous to 1/m_v used in Terzaghi consolidation theory and can substitute for oedometer data in settlement calculations (Chapter 6.2) when tube sampling is impractical.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| MDMT | soil elastic modulus = R_M × E_D | Field test, lab test or correlation | Pressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc. | loose sand 200–500, dense sand 1,000–1,700 ksf · by USCS group |
| RM | 0.14 + 2.36 log(K_D) for I_D < 0.6 (clay) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |