Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S7 for railroad clients; tables are condensed from the book and its figures are not reproduced.
- Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.Find source ↗Library entry
- Jarushi, F., AlKaabim, S. and Cosentino, P. (2015). “A New Correlation between SPT and CPT for Various Soils.” Int. J. Geological and Environmental Engineering 9(2)Find source ↗
- U.S. Army Corps of Engineers (1995). Geophysical Exploration for Engineering and Environmental Investigations. EM 1110-1-1802Find source ↗Library entry
- McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of KentuckyFind source ↗Library entry
- Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
- Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
- Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 4 and 10Find source ↗Library entry
- Bostanudin, N. J. F. (2013). Computational Methods for Processing Ground Penetrating Radar Data. PhD thesis, School of Engineering, University of Portsmouth, UK. Used on this page: Section 5.1.15 (GPR data processing)Find source ↗Library entry
- Killeen, P. G. (ed.) (1986). Borehole Geophysics for Mining and Geotechnical Applications. Geological Survey of Canada Paper 85-27. Ottawa: Supply and Services Canada. Papers used: Greenhouse and Pehme; Ivansson; New; Black; Olsson and Nilsson; Wright, Watts and Bramsoe; Mathew and Anderson; Howard; Hill. Used on this page: Section 5.1.16Find source ↗
- ASTM D5753, Standard Guide for Planning and Conducting Geotechnical Borehole Geophysical Logging. West Conshohocken, PA: ASTM International. Used on this page: Section 5.1.16Open source ↗
- Deere, D. U., Hendron, A. J., Patton, F. D. and Cording, E. J. (1967). “Design of surface and near-surface construction in rock.” Failure and Breakage of Rock, Proc. 8th U.S. Symposium on Rock Mechanics, C. Fairhurst (ed.). New York: AIME, 237–302. Used on this page: Section 5.1.16Find source ↗
- Jol, H. M. (ed.) (2009). Ground Penetrating Radar: Theory and Applications. Amsterdam: Elsevier. Chapters used: Annan (Ch. 1), Cassidy (Chs. 2 and 5), Doolittle and Butnor (Ch. 6), Saarenketo (Ch. 13). Used on this page: Section 5.1.15 (signal loss, resolution, Question 5.1-7)Find source ↗
- Everett, M. E. (2013). Near-Surface Applied Geophysics. Cambridge: Cambridge University Press. Chapters used: 1 (workflow and uncertainty), 3 (magnetics), 4 (electrical resistivity), 5 (induced polarization and self-potential), 8 (electromagnetic induction), 10 (time-lapse microgravity), 11–12 (inversion). Used on this page: Section 5.1.17Find source ↗
- McNeill, J. D. (1980). Electromagnetic Terrain Conductivity Measurement at Low Induction Numbers. Technical Note TN-6. Mississauga, ON: Geonics Limited. Used on this page: Section 5.1.17Find source ↗
- ASTM D6429, Standard Guide for Selecting Surface Geophysical Methods. West Conshohocken, PA: ASTM International. Used on this page: Section 5.1.17Open source ↗