| Depth (ft) | q_c (tsf) | f_s (psi) | u₂ (psi) | R_f (%) | SBT Zone | s_u (psf) | B_q |
|---|---|---|---|---|---|---|---|
| 5 | 3.1 | 0.30 | 8.2 | 1.04 | 4 — Silt mix | 382 | 0.28 |
| 10 | 2.4 | 0.48 | 11.6 | 2.31 | 3 — Clay | 298 | 0.42 |
| 15 | 1.8 | 0.54 | 14.3 | 3.46 | 3 — Clay | 224 | 0.59 |
| 20 | 1.6 | 0.61 | 16.1 | 4.17 | 1 — Sensitive clay | 199 | 0.72 |
| 25 | 2.1 | 0.44 | 13.8 | 2.41 | 3 — Clay | 262 | 0.48 |
| 30 | 8.7 | 0.32 | 9.4 | 0.42 | 6 — Clean sand | — | 0.04 |
| 35 | 22.4 | 0.18 | 7.6 | 0.09 | 8 — Dense sand | — | 0.01 |
B_q > 0.5 at 15–20 ft depth indicates soft, sensitive clay layer — triggers VST verification for soft-ground embankment design.