5.1.13 Field Operations Checklist — In Situ Testing

In situ testing provides continuous or near-continuous soil and rock characterization without the inherent sample disturbance associated with laboratory testing.
Authors: Daniel P. Colwell and Mario Ruel
5.1.13 Field Operations Checklist — In Situ Testing

Checklist · Part V · Subsurface Exploration

Field Operations Checklist — In Situ Testing

Pre-Mobilization0 of 7
During Testing0 of 7
Post-Testing0 of 5
Ticks are saved in this browser.
Plain text version

Pre-Mobilization

  • [ ] Railroad flagging / RWP certification confirmed for the owner railroads, or applicable short-line subsidiary
  • [ ] CPTu cone calibration certificate on file (cone tip area, sleeve area, net area ratio a, piezocone saturation method)
  • [ ] DMT membrane calibration (ΔA, ΔB values) recorded and logged
  • [ ] VST vane dimensions measured and recorded; blade condition inspected
  • [ ] MASW geophone spacing and array length laid out per project plan
  • [ ] Seismic refraction geophone array and shot locations staked; shot holes pre-drilled if needed
  • [ ] GPS receiver verified for State Plane coordinate capture matching client requirements (the owner railroad's coordinate system)

During Testing

  • [ ] CPTu: verify push rate 0.8 in./s ± 25% (20 ± 5 mm/s); log zero readings before each push; record u₂ during hold periods
  • [ ] CPTu: flush and resaturate piezocone filter if u₂ readings become erratic
  • [ ] VST: confirm push depth before rotation; record peak torque to nearest 0.1 lb·ft; rotate 10 full turns for remolded; record time to remolding
  • [ ] PMT: log borehole diameter at test depth; confirm membrane inflation rate and hold time per ASTM D4719
  • [ ] DMT: record A and B readings at each 8-in. depth increment; note any membrane replacement
  • [ ] MASW: record field dispersion curve in real time; flag reversal zones for re-processing
  • [ ] Seismic refraction: record all first arrivals on paper and digital; verify forward and reverse shoots for layer dip assessment

Post-Testing

  • [ ] CPTu data downloaded in raw format and backed up; verify no dropped readings
  • [ ] gINT data entry complete with test type, date, operator, cone serial number, calibration reference
  • [ ] QA review of travel-time plots (refraction), dispersion curves (MASW), and CPTu profiles before demobilization
  • [ ] Coordinate data submitted to project GIS in the format the client requires
  • [ ] Site restoration completed per railroad RWP close-out procedures
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-23 Flat dilatometer (DMT) intermediate parameters I_D, K_D, E_DUse: All soils penetrable by the blade; ID < 0.6 clay, 0.6–1.8 silt, >1.8 sand. Limits: ED is not a design modulus; convert with MDMT = RM · ED (Marchetti 1980).