↑ Parent Menu⌂ Main Menu
← Chapter 5.1 In Situ Testing
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

Cross-References

In situ testing provides continuous or near-continuous soil and rock characterization without the inherent sample disturbance associated with laboratory testing.
Authors: Daniel P. Colwell and Mario Ruel
Cross-References
  • Chapter 4.1 — SPT corrections: SPT vs. CPT comparison; energy efficiency basis; SPT-CPT conversion (Robertson & Campanella)
  • Chapter 2.2 — Soil classification: SBT chart zone assignments; USCS correlation from CPT I_D
  • Chapter 6.1 — Bearing capacity: s_u from VST/CPTu used in undrained bearing capacity of spread footings and pile tip resistance
  • Chapter 6.2 — Settlement analysis: M_DMT as M_v substitute; OCR from K_D for preconsolidation stress estimation
  • Chapter 6.3 — Slope stability: Bjerrum-corrected s_u as undrained strength input for embankment stability
  • Chapter 6.5 — Seismic/liquefaction: q_c1N from CPTu for CRR; B_q for pore pressure generation assessment; G_max from MASW for site response
← Previous · 4.0 Subsurface Exploration Chapter 4.1 — Borings and Sampling
Next · 5.0 Testing → Chapter 5.2 — Laboratory Testing Program