Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
Primary sources
Supplemental references
- Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.Find source ↗Library entry
- Jarushi, F., AlKaabim, S. and Cosentino, P. (2015). “A New Correlation between SPT and CPT for Various Soils.” Int. J. Geological and Environmental Engineering 9(2)Find source ↗
- U.S. Army Corps of Engineers (1995). Geophysical Exploration for Engineering and Environmental Investigations. EM 1110-1-1802Official page ↗Library entry
- McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of KentuckyFind source ↗Library entry
File locations for these documents are listed under Supplemental References.