The field vane shear test (ASTM D2573) measures peak and remolded undrained shear strength of soft to firm cohesive soils. A four-bladed vane with H/D = 2 is pushed to the test depth and rotated at about 6°/minute. ASTM D2573 lists the standard vane sizes; the examples in this chapter use a 2.24-in. diameter × 4.49-in. vane, so check the actual vane size before using the equations below. The test is suited to soft clays with s_u < 1.0 tsf. It is inappropriate in sands, gravels, or stiff clays.
Specific applications by railroad client:
No additional content.
For H/D = 2 (standard vane):
s_u (peak) = T_peak / [π × D³ × (H/(2D) + 1/6)]
Where:
Substituting H/D = 2:
s_u (peak) = T_peak / [π × D³ × (1 + 1/6)]
= T_peak / [π × D³ × 7/6]
= 6 × T_peak / (7 × π × D³)
Converting result from lb/ft² to tsf: divide by 2,000.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| su (peak) | undrained shear strength = T_peak / [π × D³ × (H/(2D) + 1/6)] | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
| Tpeak | peak torque (lb·ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| D | vane diameter (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| H | vane height (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
Field vane s_u overestimates design undrained strength in plastic clays because the test is faster than field loading rates and the failure plane is not optimally oriented. The Bjerrum (1972) correction factor μ is applied:
s_u (design) = μ × s_u (field vane)
Where μ is a function of plasticity index (PI):
| PI (%) | μ (Bjerrum 1972) |
|---|---|
| 10 | 1.00 |
| 20 | 1.00 |
| 40 | 0.85 |
| 60 | 0.75 |
| 80 | 0.65 |
| 100+ | 0.60 |
For Class I railroad embankment stability analyses on Atlantic Coastal Plain soft clays (typical PI = 40–65%), μ = 0.75–0.85 is standard practice.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| su (design) | undrained shear strength = μ × s_u (field vane) | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
| PI | plasticity index | Lab test | PI = LL − PL from Atterberg limits (ASTM D4318). | CL 7–30, CH 25–80 · by USCS group |
No additional content.
S_t = s_u (peak) / s_u (remolded)
Clays with S_t > 8 are extra-sensitive (S_t > 16 is quick) and call for a project-level risk assessment and a slope stability analysis under seismic loading (Chapters 6.3 and 6.5).
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| su | undrained shear strength | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |