5.1.1 Background and Role of In Situ Testing in Railroad Investigations

In situ testing provides continuous or near-continuous soil and rock characterization without the inherent sample disturbance associated with laboratory testing.
Authors: Daniel P. Colwell and Mario Ruel
5.1.1 Background and Role of In Situ Testing in Railroad Investigations

Railroad embankments, bridges, culverts, and intermodal facilities impose repetitive dynamic loads that sensitize soft or marginally competent soils in ways that static design loads alone do not capture. The Cooper E-80 live load equivalent used by Class I railroads combined with dynamic load factors (DLF) of 1.2 to 1.5 (see Introduction, Table 1.0-3) means that subgrade characterization must resolve not only static strength and stiffness but also cyclic response. In situ testing is indispensable for this because:

Geotechnical Investigation Beyond SPT
Geotechnical Investigation Beyond SPT
  1. Soft clays and organic soils — common in Class I railroad corridor located in the Atlantic Coastal Plain, high-speed passenger corridor estuarine deposits, Class I railroad shoreline alignments located in the Great Lakes region, and Class I railroad subsidiaries located in the Gulf Coast — cannot be sampled and tested without significant disturbance unless a fixed-piston sampler is used. The VST and CPTu provide undisturbed strength measurements directly in the ground.
  2. Liquefaction screening (Chapter 6.5) requires normalized CPT tip resistance (q_c1N) that cannot be obtained from SPT alone.
  3. Stiffness profiling for dynamic track modulus — increasingly requested by many owner railroads for mainline heavy-haul corridors — requires small-strain shear modulus (G_max) from MASW or seismic CPT.
  4. Rippability assessment for rock cuts on Class I railroad routes located in Appalachia and Class I railroad Shield crossings located in Canada is efficiently accomplished by seismic refraction before committing to diamond core drilling programs.
  5. Short-line subsidiaries operating short-line or regional networks often lack the budget for extensive drilling but can receive substantial value from MASW profiling combined with selective SPT borings.
Supplemental reference

In-situ tests adapted for the trackbed

Access under traffic limits most in-situ tests to the shoulder or a track window. McHenry and Rose (2012) summarize the tools that can be run from the track or crib: the dynamic cone penetrometer and the instrumented French PANDA (records blow energy and penetration to give dynamic cone resistance qd), the light weight deflectometer, the German DyStaFiT dynamic plate test, and rail-bound stiffness vehicles (Track Loading Vehicle, Portancemètre). They also note that seismic CPT is attractive for railroads because a small-strain modulus better reflects the small cyclic strains under train loads than a resilient modulus does.

Source: McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of Kentucky

In situ test methods and their applicability

Profillidis reproduces a matrix of in situ test methods (from Carter and Bentley, Correlations of Soil Properties) rating each method’s applicability to soil identification, profiling and engineering parameters across soil types. He notes that before 1960 the list would have held only the standard penetration test, the mechanical cone, the vane shear test and the plate load test. Today several methods can usually supply any given parameter, so the choice can be driven by soil type, depth and cost.

Figure 5.1-11. In situ soil test methods and their applicability (A = high, B = moderate, C = low, – = none). Profillidis Table 9.1, after Carter and Bentley (1991).
Figure 5.1-11. In situ soil test methods and their applicability (A = high, B = moderate, C = low, – = none). Profillidis Table 9.1, after Carter and Bentley (1991).

After Profillidis (2014), §9.2.3, Table 9.1; after Carter, M. and Bentley, S. (1991), Correlations of Soil Properties, Pentech Press. Full reference under Supplemental References.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-18 Shear-wave velocity from CPT VₛUse: Young, uncemented Holocene–Pleistocene soils. Limits: Underpredicts Vs in aged or cemented soils. Measure Vs directly for seismic site class.
  • IX-13 Small-strain shear modulus (Hardin) G_maxUse: Uncemented clays and sands; lab resonant-column basis. Limits: Underestimates aged/cemented soils; field Vs (Gmax = ρVs2) is preferred.