Contents
- Unit weight, water content and index properties (natural, in-place): Total (moist) unit weight γ, Dry unit weight γd, Natural water content w, Specific gravity Gs, Void ratio e (porosity n = e/(1+e)), Liquid limit LL / plasticity index PI
- Drained strength: Peak effective friction angle φ', Effective cohesion c', Residual friction angle φ'r, Compacted (Standard Proctor) φ' / saturated c'
- Permeability and consolidation: Hydraulic conductivity k, Coefficient of consolidation cv, Compression index Cc, Recompression index Cr (Cs), Secondary compression Cα (as Cα/Cc)
- Stiffness and wave velocity: Drained Young's modulus Es, Poisson's ratio ν, Shear-wave velocity Vs
- Compaction, subgrade support and frost: Max. dry unit weight / optimum water content, California Bearing Ratio CBR, Resilient modulus Mr, Modulus of subgrade reaction k, Frost susceptibility group (USACE), Thermal conductivity, frozen kf
- Density of coarse-grained soil (SPT, CPT, Dr)
- Consistency of fine-grained soil (su, SPT, CPT)
- How each property is obtained
Unit weight, water content and index properties (natural, in-place)
In-place values for natural deposits. Fill depends on compaction; see the compaction table.
| USCS group | Total (moist) unit weight γ (pcf) |
Dry unit weight γd (pcf) |
Natural water content w (%) |
Specific gravity Gs (—) |
Void ratio e (porosity n = e/(1+e)) (—) |
Liquid limit LL / plasticity index PI (%) |
|---|---|---|---|---|---|---|
| GW Well-graded gravel | 125–145 | 115–135 | 3–15 | 2.64–2.68 | 0.25–0.45 | NP |
| GP Poorly graded gravel | 120–140 | 105–130 | 3–15 | 2.64–2.68 | 0.30–0.60 | NP |
| GM Silty gravel | 120–140 | 110–130 | 5–20 | 2.65–2.70 | 0.30–0.60 | fines: PI < 4 or below A-line |
| GC Clayey gravel | 120–140 | 105–125 | 8–20 | 2.66–2.72 | 0.35–0.65 | fines: PI > 7, above A-line |
| SW Well-graded sand | 115–135 | 100–125 | 5–20 | 2.64–2.68 | 0.35–0.70 | NP |
| SP Poorly graded sand | 105–130 | 90–115 | 5–25 | 2.64–2.68 | 0.45–0.85 | NP |
| SM Silty sand | 110–130 | 95–120 | 8–25 | 2.65–2.70 | 0.40–0.80 | fines: PI < 4 or below A-line |
| SC Clayey sand | 110–130 | 95–120 | 10–25 | 2.66–2.72 | 0.40–0.80 | fines: PI > 7, above A-line |
| ML Silt (low plasticity) | 100–125 | 80–110 | 15–40 | 2.65–2.72 | 0.50–1.10 | LL 20–50; PI NP–10 (below A-line) |
| CL Lean clay | 105–130 | 80–115 | 15–40 | 2.68–2.75 | 0.50–1.20 | LL 20–50; PI 7–30 (above A-line) |
| OL Organic silt/clay (low LL) | 85–110 | 50–85 | 35–100 | 2.40–2.65 | 1.0–3.0 | LL 30–50; LLoven/LL < 0.75 |
| MH Elastic silt | 90–115 | 55–90 | 30–80 | 2.70–2.80 | 0.9–2.0 | LL 50–90; PI 10–40 (below A-line) |
| CH Fat clay | 95–125 | 60–100 | 25–70 | 2.70–2.80 | 0.7–2.0 | LL 50–110; PI 25–80 (above A-line) |
| OH Organic clay (high LL) | 80–105 | 40–80 | 50–200 | 2.20–2.60 | 1.5–4.0 | LL 50–100; LLoven/LL < 0.75 |
| PT Peat | 60–80 | 5–20 | 200–1,500 | 1.4–2.0 | 5–15 | — |
Sources. Holtz, Kovacs & Sheahan (2011), An Introduction to Geotechnical Engineering, 2nd ed.; Das & Sobhan (2018), Principles of Geotechnical Engineering, 9th ed.; Terzaghi, Peck & Mesri (1996), Soil Mechanics in Engineering Practice, 3rd ed. · ASTM D2487, Standard Practice for Classification of Soils for Engineering Purposes (USCS); A-line PI = 0.73(LL − 20).
Drained strength
Peak effective-stress parameters for normally consolidated or compacted soil. Undrained strength su of fine-grained soil depends on consistency and stress history, not on group: see the consistency table.
| USCS group | Peak effective friction angle φ' (degrees) |
Effective cohesion c' (psf) |
Residual friction angle φ'r (degrees) |
Compacted (Standard Proctor) φ' / saturated c' (degrees / psf) |
|---|---|---|---|---|
| GW Well-graded gravel | 35–45 | 0 | ≈ φ'cv 32–36 | >38 / 0 |
| GP Poorly graded gravel | 33–42 | 0 | ≈ φ'cv 32–36 | >37 / 0 |
| GM Silty gravel | 32–40 | 0–100 | 28–34 | >34 / — |
| GC Clayey gravel | 28–36 | 0–200 | 22–30 | >31 / — |
| SW Well-graded sand | 33–42 | 0 | ≈ φ'cv 30–34 | 38 / 0 |
| SP Poorly graded sand | 30–38 | 0 | ≈ φ'cv 30–34 | 37 / 0 |
| SM Silty sand | 28–36 | 0–100 | 26–32 | 34 / 420 |
| SC Clayey sand | 26–33 | 0–200 | 20–28 | 31 / 230 |
| ML Silt (low plasticity) | 27–34 | 0–100 | 24–32 | 32 / 190 |
| CL Lean clay | 24–32 | 0–250 | 12–25 | 28 / 270 |
| OL Organic silt/clay (low LL) | 20–28 | 0–100 | 15–25 | — / — |
| MH Elastic silt | 22–30 | 0–200 | 10–22 | 25 / 420 |
| CH Fat clay | 17–26 | 0–300 | 6–15 | 19 / 230 |
| OH Organic clay (high LL) | 15–25 | 0–100 | 8–18 | — / — |
| PT Peat | 25–40* | 0–200* | — | not used as fill |
Sources. Holtz, Kovacs & Sheahan (2011), An Introduction to Geotechnical Engineering, 2nd ed.; Das & Sobhan (2018), Principles of Geotechnical Engineering, 9th ed.; Terzaghi, Peck & Mesri (1996), Soil Mechanics in Engineering Practice, 3rd ed. · Stark & Eid (1994) and Stark & Hussain (2013), drained residual strength correlations with LL and clay fraction. · NAVFAC DM-7.02 (1986) / UFC 3-220-01N, Table 8-1.4 “Typical Properties of Compacted Soils” (Standard Proctor density; CBR and k at CE-55 density).
* Peat (PT): effective-stress parameters are uncertain and fiber-dependent; design with undrained strength from field vane or CPT and a settlement-based approach.
Permeability and consolidation
Hydraulic conductivity in ft/day (1 cm/s ≈ 2,835 ft/day). Consolidation parameters for normally consolidated fine-grained soil; coarse-grained soils drain during loading and are analyzed with elastic or empirical settlement methods.
| USCS group | Hydraulic conductivity k (ft/day) |
Coefficient of consolidation cv (ft²/day) |
Compression index Cc (—) |
Recompression index Cr (Cs) (—) |
Secondary compression Cα (as Cα/Cc) (—) |
|---|---|---|---|---|---|
| GW Well-graded gravel | 10–1,000 | free-draining | — | — | — |
| GP Poorly graded gravel | 100–10,000 | free-draining | — | — | — |
| GM Silty gravel | 0.001–10 | free-draining | < 0.05 | — | — |
| GC Clayey gravel | 10−5–0.01 | 0.5–10 | 0.02–0.10 | 0.005–0.02 | — |
| SW Well-graded sand | 1–100 | free-draining | — | — | — |
| SP Poorly graded sand | 0.1–100 | free-draining | — | — | — |
| SM Silty sand | 0.001–1 | 1–50 | 0.02–0.10 | 0.005–0.02 | — |
| SC Clayey sand | 10−5–0.01 | 0.5–10 | 0.05–0.15 | 0.01–0.03 | 0.03±0.01 |
| ML Silt (low plasticity) | 10−4–0.1 | 0.5–5 | 0.10–0.35 | 0.01–0.05 | 0.04±0.01 |
| CL Lean clay | 10−6–10−3 | 0.05–1 | 0.10–0.40 | 0.01–0.08 | 0.04±0.01 |
| OL Organic silt/clay (low LL) | 10−5–0.01 | 0.02–0.3 | 0.40–1.0 | 0.05–0.2 | 0.05±0.01 |
| MH Elastic silt | 10−5–0.01 | 0.02–0.5 | 0.35–0.75 | 0.04–0.15 | 0.04±0.01 |
| CH Fat clay | 10−7–10−4 | 0.005–0.2 | 0.35–0.90 | 0.04–0.18 | 0.04±0.01 |
| OH Organic clay (high LL) | 10−6–10−3 | 0.005–0.1 | 0.60–2.5 | 0.1–0.5 | 0.05±0.01 |
| PT Peat | 0.001–10 | 0.05–5 | 2–10 | 0.2–1.5 | 0.075±0.01 |
Sources. Holtz, Kovacs & Sheahan (2011), An Introduction to Geotechnical Engineering, 2nd ed.; Das & Sobhan (2018), Principles of Geotechnical Engineering, 9th ed.; Terzaghi, Peck & Mesri (1996), Soil Mechanics in Engineering Practice, 3rd ed. · Terzaghi & Peck (1967): Cc ≈ 0.009(LL − 10) for normally consolidated clays, applied to typical LL ranges; organic and peat values from Mesri & Ajlouni (2007). · Mesri & Godlewski (1977); Mesri & Castro (1987): Cα/Cc = 0.04 ± 0.01 inorganic clays and silts, 0.05 ± 0.01 organic, 0.075 ± 0.01 peat.
Stiffness and wave velocity
Ranges span loose to dense (coarse) and soft to hard (fine). Use the density/consistency table to narrow them.
| USCS group | Drained Young's modulus Es (ksf) |
Poisson's ratio ν (—) |
Shear-wave velocity Vs (ft/s) |
|---|---|---|---|
| GW Well-graded gravel | 1,000–4,000 | 0.25–0.40 | 800–2,500 |
| GP Poorly graded gravel | 1,000–4,000 | 0.25–0.40 | 800–2,500 |
| GM Silty gravel | 600–2,500 | 0.25–0.40 | 700–2,000 |
| GC Clayey gravel | 600–2,000 | 0.25–0.40 | 700–2,000 |
| SW Well-graded sand | 200–1,700 | 0.25–0.40 | 500–1,500 |
| SP Poorly graded sand | 200–1,700 | 0.25–0.40 | 400–1,400 |
| SM Silty sand | 100–1,000 | 0.25–0.40 | 400–1,300 |
| SC Clayey sand | 100–1,000 | 0.25–0.40 | 400–1,300 |
| ML Silt (low plasticity) | 40–400 | 0.30–0.35 | 350–1,000 |
| CL Lean clay | 40–2,000 | 0.20–0.40 drained; 0.50 undrained | 250–1,500 |
| OL Organic silt/clay (low LL) | 10–200 | 0.30–0.40 | 150–500 |
| MH Elastic silt | 40–600 | 0.20–0.40 drained; 0.50 undrained | 250–1,000 |
| CH Fat clay | 40–1,500 | 0.20–0.40 drained; 0.50 undrained | 250–1,500 |
| OH Organic clay (high LL) | 10–200 | 0.30–0.40 | 150–500 |
| PT Peat | 2–60 | 0.10–0.30 | 100–300 |
Sources. Bowles (1996), Foundation Analysis and Design, 5th ed., Tables 2-7 (Es) and 2-8 (ν), converted to ksf. · ASCE 7-22 Ch. 20 site-class velocity bands; Kramer (1996), Geotechnical Earthquake Engineering.
Compaction, subgrade support and frost
Compaction values are Standard Proctor (ASTM D698). CBR and modulus of subgrade reaction are for compacted soil. Mr is from Mr = 2,555·CBR0.64 applied to the CBR range.
| USCS group | Max. dry unit weight / optimum water content (pcf / %) |
California Bearing Ratio CBR (%) |
Resilient modulus Mr (psi) |
Modulus of subgrade reaction k (pci) |
Frost susceptibility group (USACE) (—) |
Thermal conductivity, frozen kf (BTU/hr·ft·°F) |
|---|---|---|---|---|---|---|
| GW Well-graded gravel | 125–135 / 8–11 | 40–80 | 27,000–42,000 | 300–500 | NFS–F1 | 1.4–2.4 |
| GP Poorly graded gravel | 115–125 / 11–14 | 30–60 | 22,000–35,000 | 250–400 | NFS–F1 | 1.4–2.4 |
| GM Silty gravel | 120–135 / 8–12 | 20–60 | 17,000–35,000 | 100–400 | F1–F3 | 1.2–2.0 |
| GC Clayey gravel | 115–130 / 9–14 | 20–40 | 17,000–27,000 | 100–300 | F1–F3 | 1.2–2.0 |
| SW Well-graded sand | 110–130 / 9–16 | 20–40 | 17,000–27,000 | 200–300 | NFS–F2 | 1.4–2.4 |
| SP Poorly graded sand | 100–120 / 12–21 | 10–40 | 11,000–27,000 | 200–300 | NFS–F2 | 1.4–2.4 |
| SM Silty sand | 110–125 / 11–16 | 10–40 | 11,000–27,000 | 100–300 | F2–F4 | 1.2–2.0 |
| SC Clayey sand | 105–125 / 11–19 | 5–20 | 7,000–17,000 | 100–300 | F2–F3 | 1.2–2.0 |
| ML Silt (low plasticity) | 95–120 / 12–24 | ≤ 15 | ≤ 14,000 | 100–200 | F4 | 0.8–1.4 |
| CL Lean clay | 95–120 / 12–24 | ≤ 15 | ≤ 14,000 | 50–200 | F3 (PI > 12) / F4 (PI < 12) | 0.8–1.4 |
| OL Organic silt/clay (low LL) | 80–100 / 21–33 | ≤ 5 | ≤ 7,000 | 50–100 | F4 | 0.5–1.0 |
| MH Elastic silt | 75–95 / 24–40 | ≤ 10 | ≤ 11,000 | 50–100 | F4 | 0.8–1.4 |
| CH Fat clay | 80–105 / 19–36 | ≤ 15 | ≤ 14,000 | 50–150 | F3 | 0.8–1.4 |
| OH Organic clay (high LL) | 75–100 / 21–45 | ≤ 5 | ≤ 7,000 | 25–100 | F3 | 0.5–1.0 |
| PT Peat | not suitable | — | — | — | — | 0.2–0.8 |
Sources. NAVFAC DM-7.02 (1986) / UFC 3-220-01N, Table 8-1.4 “Typical Properties of Compacted Soils” (Standard Proctor density; CBR and k at CE-55 density). · AASHTO (2008) MEPDG Manual of Practice: Mr (psi) = 2,555·CBR0.64. · UFC 3-130-01 / TM 5-822-5 frost-susceptibility groups F1–F4 (based on % finer than 0.02 mm and PI). · Kersten (1949) thermal properties of soils, as used in UFC 3-130-06 (TM 5-852-6); depends on γd and w.
Density of coarse-grained soil (GW, GP, GM, GC, SW, SP, SM, SC)
Density state, not group, sets these values. Use (N1)60 and qc1N for depth-normalized comparisons.
| Density | Dr (%) | N60 (blows/ft) | qc (tsf) | φ' (degrees) |
|---|---|---|---|---|
| Very loose | 0–15 | 0–4 | < 20 | 28–30 |
| Loose | 15–35 | 4–10 | 20–40 | 30–32 |
| Medium dense | 35–65 | 10–30 | 40–120 | 32–36 |
| Dense | 65–85 | 30–50 | 120–200 | 36–40 |
| Very dense | 85–100 | > 50 | > 200 | 40–45 |
Sources. Terzaghi & Peck (1967); Meyerhof (1956); Kulhawy & Mayne (1990), Manual on Estimating Soil Properties for Foundation Design, EPRI EL-6800. φ' ranges are for clean sand; add 2–5° for well-graded gravelly soil.
Consistency of fine-grained soil (ML, CL, OL, MH, CH, OH)
Undrained strength follows consistency and stress history. Normally consolidated clays typically have su/σ'v ≈ 0.20–0.25 (Mesri 1975; Ladd 1991). CPT: su ≈ (qt − σv)/Nkt, Nkt ≈ 10–18.
| Consistency | su (psf) | N60 (blows/ft) | qt − σv (tsf, Nkt ≈ 14) |
|---|---|---|---|
| Very soft | < 250 | < 2 | < 5 |
| Soft | 250–500 | 2–4 | 5–8 |
| Medium stiff | 500–1,000 | 4–8 | 8–15 |
| Stiff | 1,000–2,000 | 8–15 | 15–30 |
| Very stiff | 2,000–4,000 | 15–30 | 30–60 |
| Hard | > 4,000 | > 30 | > 60 |
Sources. Terzaghi & Peck (1967) consistency classes; ASTM D2488; FHWA GEC-5 (2017), Geotechnical Site Characterization. N60 correlations in clay are approximate; prefer vane, CPT or lab tests.
How each property is obtained
The same text appears in each equation's Inputs table.
| Property | Comes from | How to get it |
|---|---|---|
| Total unit weight γ | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). |
| Dry unit weight γd | Lab or field test | Lab: ASTM D7263 on tube samples. Field: nuclear gauge (ASTM D6938), sand cone (D1556) or drive cylinder (D2937). Or γd = γ/(1 + w). |
| Buoyant unit weight γ' | Another equation | γ' = γsat − γw (γw = 62.4 pcf). Use below the water table. |
| Max. dry unit weight γd,max | Lab test | Proctor compaction test: Standard (ASTM D698) or Modified (ASTM D1557), as the spec requires. |
| Water content w | Lab test | Oven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938). |
| Specific gravity Gs | Lab test | Specific gravity of solids (ASTM D854). 2.65–2.70 is usually adequate for mineral soils when untested. |
| Void ratio e | Another equation | e = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435). |
| Liquid limit LL | Lab test | Atterberg limits (ASTM D4318) on the minus No. 40 fraction. |
| Plasticity index PI | Lab test | PI = LL − PL from Atterberg limits (ASTM D4318). |
| Fines content | Lab test | Percent passing No. 200 sieve: washed sieve analysis (ASTM D1140 / D6913). |
| Grain size D10–D85 | Lab test | Grain-size curve: sieve (ASTM D6913) plus hydrometer for fines (ASTM D7928). Read D10, D30, D50, D60, D85 from the curve. |
| Friction angle φ' | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). |
| Residual friction angle φ'r | Lab test (or correlation) | Ring shear (ASTM D6467) or reversal direct shear (D3080); or Stark correlations with LL and clay fraction. |
| Cohesion c' | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. |
| Undrained strength su | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. |
| Hydraulic conductivity k | Field or lab test | Field: pumping test, slug test (ASTM D4044) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. |
| Coefficient of consolidation cv, ch | Lab test (or field) | Consolidation test (ASTM D2435 or D4186), log-time or root-time fit at the design stress range. ch from CPTu dissipation tests. |
| Compression index Cc | Lab test | Slope of the virgin e–log σ' curve from a consolidation test (ASTM D2435). Screening: Cc ≈ 0.009(LL − 10). |
| Recompression index Cr | Lab test | Unload–reload slope of the e–log σ' curve (ASTM D2435). Screening: Cr ≈ Cc/5 to Cc/10. |
| Secondary compression Cα | Lab test | Slope of e vs log time after primary consolidation in the consolidation test (ASTM D2435). |
| Preconsolidation stress σ'p / OCR | Lab test (or correlation) | Preconsolidation stress from the consolidation curve (Casagrande or work method, ASTM D2435). CPT screening: σ'p ≈ 0.33(qt − σv). OCR = σ'p/σ'v0. |
| Elastic modulus Es | Field test, lab test or correlation | Pressuremeter (ASTM D4719), DMT (D6635), plate load (D1196), triaxial secant modulus, or correlation with N60 or qc. |
| Poisson's ratio ν | Assumed (published values) | Rarely measured; choose from published ranges. Use 0.5 for undrained clay. |
| Shear-wave velocity Vs | Field test | Seismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves. |
| SPT N60 | Field test | Standard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633) to correct to N60. |
| CPT qc, qt, fs, u2 | Field test | Cone penetration test with pore pressure (CPTu, ASTM D5778). |
| Relative density Dr | Another equation (or correlation) | From emax/emin tests (ASTM D4253/D4254) and in-place e, or from SPT/CPT correlations. |
| CBR | Lab or field test | Lab CBR (ASTM D1883, soaked) on compacted samples; field CBR (D4429); or from DCP (ASTM D6951) correlation. |
| Resilient modulus Mr | Lab test (or correlation) | Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG). |
| Subgrade modulus k | Field test (or correlation) | Plate load test (ASTM D1196 / AASHTO T 222), or correlation with CBR or Mr. |
| Thermal conductivity kf | Published data | Kersten charts in UFC 3-130-06 (TM 5-852-6) for the measured γd and w. |
| At-rest coefficient K0 | Another equation | K0 = 1 − sin φ' (NC), × OCRsin φ' for OC soil (Jaky; Mayne & Kulhawy). Field: DMT or self-boring pressuremeter. |
| Interface friction δ | Lab test (or fraction of φ') | Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic). |
| Rock UCS | Lab test | Uniaxial compression of rock core (ASTM D7012); point load index (D5731) for screening. |
Compiled by D. P. Colwell for the GHRM manual, November 2026. Ranges transcribed or derived from the cited references; verify against the originals before design use.