| Method | Primary Output | Best Suited Soils | Railroad Application |
|---|---|---|---|
| CPT / CPTu | q_c, f_s, u₂ | Sands to soft clays | Liquefaction screening; settlement (high-speed passenger corridor, a Class I railroad) |
| VST | s_u, S_t | Soft to medium clays | Embankment stability; quick clay |
| PMT | E_PMT, p_L | All soils; rock (SBP) | Foundation modulus; stiff interbedded soils |
| DMT | I_D, K_D, M_DMT | Soft clays to dense sands | OCR, settlement input; subgrade assessment |
| MASW | V_s profile, G_max | All soils / rock | Site class, G_max; muskeg thickness |
| Seismic Refraction | V_P, layer depths | Rock / stiff soils | Depth to rock, rippability |
Selection hierarchy:
Converting between N and qc is routine when a corridor has old SPT borings and new CPT soundings. A Florida DOT data set (six sites, safety-hammer SPT, electric CPT) shows the limits:
| Soil (USCS) | Linear fit (qc in MPa) | R2 |
|---|---|---|
| Fine sand (SP) | qc = 0.291N + 2.43 | 0.60 |
| Silty fine sand (SM) | qc = 0.12N + 5.0 | 0.35 |
| Silty clayey fine sand (SM/SC) | qc = 0.22N + 2.6 | 0.37 |
| Fine sand with silt (SP-SM) | qc = 0.15N + 7.2 | 0.11 |
| Clayey fine sand (SC) | qc = 0.06N + 5.7 | 0.09 |
Only clean sand gave a usable correlation, and its qc/N ratio matched the published values; sands with more than about 10% fines scattered badly and had higher qc/N than the literature. Treat a converted N or qc as a screening value. For design, calibrate with side-by-side SPT and CPT at a few stations in each geologic unit, and prefer the Robertson soil-behavior-type ratios (above) over a single constant.
Source: Jarushi, F., AlKaabim, S. and Cosentino, P. (2015). “A New Correlation between SPT and CPT for Various Soils.” Int. J. Geological and Environmental Engineering 9(2) · Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing, Inc.
Only two things need answering. For track subgrade, in situ testing has to establish strength (bearing) and stiffness (deformation), plus where the layering changes. Tests support design in one of two ways:
| Test | Very soft clay | Soft clay | Medium clay | Stiff clay | Silty clay | Silt |
|---|---|---|---|---|---|---|
| Field vane | A | A | B | C | C | D |
| CPT | A | A | A | B | B | C |
| CPTu | A | A | A | B | B | C |
| DMT | A | A | A | A | A | B |
| PMT | B | B | A | A | B | C |
| SPT | D | C | B | A | A | A |
A = high suitability; B = moderate; C = limited; D = not applicable.
Strengths and limitations.
Choosing the test. CPT, vane and DMT depend least on the operator. Where stratigraphy is complex or variable, use more of a cheaper test. Where it is simple, fewer, more expensive tests are acceptable.
After Selig & Waters (1994), chs. 4 and 10. Full reference under Supplemental References.
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.