Many railroad borings are drilled by rotary or wash methods with samples only at intervals, and rock is often cored only where it matters most. Borehole geophysical logs are run in the open or cased hole after drilling and fill the gaps between samples. They give a continuous record, by depth, of properties that relate to clay content, density, water content, fracturing and seismic velocity. They also give a consistent way of correlating layers from boring to boring. Logging costs little per foot compared with continuous coring, but the hole can usually be logged only once before it is grouted or caves, so the logs must be planned before drilling starts (ASTM D5753).
| Log | Measures | Hole conditions | Geotechnical use |
|---|---|---|---|
| Natural gamma (total or spectral) | Natural radioactivity (potassium, uranium, thorium), mostly from clay minerals | Open or cased (PVC or steel), wet or dry | Clay content; sand-clay boundaries; correlating till and shale marker beds between borings |
| Electromagnetic induction (conductivity) | Electrical conductivity of the ground around the hole | Open or PVC-cased; not in steel | Clay layers; saline or contaminated groundwater; pyritic or graphitic zones |
| Resistivity and spontaneous potential (SP) | Resistivity of the formation; natural voltages | Open, fluid-filled | Lithology; permeable beds; water quality |
| Neutron | Hydrogen content, which is water content below the water table and in clay | Open or cased; licensed radioactive source | Porosity and water content; with density, clay identification |
| Gamma-gamma (density) | Bulk density from back-scattered gamma rays | Open or cased; licensed source; needs a caliper correction | In-place density of soil and rock; loose or disturbed zones; voids |
| Caliper | Hole diameter | Open hole | Washouts, caving, cavities and soft zones; corrects the nuclear logs. In air-filled holes, gamma-gamma back-scatter can serve as a caliper (Mathew and Anderson) |
| Temperature, differential temperature, fluid conductivity, flowmeter | Fluid temperature, salinity and vertical flow in the hole | Open, fluid-filled | Water-bearing fractures and solution zones; which zones carry the flow (Howard) |
| Full-waveform sonic, P-S suspension | P- and S-wave velocity of the wall | Open, fluid-filled | Small-strain modulus; rock quality; seismic site class |
| Optical and acoustic televiewer | Image of the borehole wall | Open; clear fluid for optical | Fracture orientation, aperture and spacing for kinematic analysis (Section 5.1.0) |
| Borehole radar (single-hole or crosshole) | Radar reflections and transmission | Open or PVC; resistive rock | Fracture zones and voids up to tens of feet from the hole, with orientation |
| Crosshole seismic and tomography | P- and S-wave travel times between holes | Two or more holes, cased and grouted (ASTM D4428) | Velocity profile; velocity map between holes; fractured or weak zones |
| Borehole gravity | Gravity, giving bulk density over a large volume | Large-diameter hole | Average density away from the disturbed wall; rarely used in shallow work |
Greenhouse and Pehme logged rotary holes through thick glacial deposits in southern Ontario to establish the stratigraphy and properties without coring every hole. The approach transfers well to railroad corridors:
Sources fired in one hole and receivers in another give travel times along many crossing ray paths. These can be inverted for a map of P-wave velocity between the holes. Ivansson showed that the simple straight-ray solution has artifacts from travel-time errors and from bending of rays around slow zones. Check the map against synthetic travel times from a trial model before interpreting it. New used a “representative velocity” grid with points about 3 ft apart in granite and found that velocity reductions matched the observed fracturing. Velocity can be related to rock quality through the velocity index:
Eq. 5.1-24: VI = (VF / VL)2, where VF = field P-wave velocity of the rock mass and VL = P-wave velocity of intact core. VI is roughly equal to RQD/100 (Deere et al. 1967; RK-13), because open joints slow the wave in the field but are absent from the intact core.
Correct each travel time for the trigger and instrument delay, and use the true distance between source and receiver from deviation surveys of both holes. A 1-ft error in a 40-ft spacing changes the velocity by 2.5% and the velocity index by about 5%.
Single-hole radar with the transmitter and receiver about 40 ft apart showed fracture zones that cross the hole as attenuation and delay of the direct wave. Fractures and voids away from the hole showed as reflections, and their angle gave the orientation of the zone (Olsson and Nilsson). Reflections came from up to about 145 ft away, and an air-filled drift was detected about 100 ft from the hole. Wright, Watts and Bramsoe detected an anomalous zone extending more than 65 ft from the hole in granite. Radar needs resistive ground: it works in fresh crystalline rock, limestone and dry sand, and fails in clay, shale and saline water.
A log is only as good as its calibration (Hill). Calibration follows three steps: recorder, system, then tool. Ask the logging contractor for signed and dated calibration records, a field calibration check before and after logging, and a repeat run over a short section to show that the logs repeat. Depth control matters: tie the depth reference to the ground surface or top of casing and check it against a known feature such as the casing shoe. Have the engineer or a trained representative at the hole, because problems found at the office cannot be fixed once the hole is grouted.
For railroad work: Natural gamma and EM conductivity logs run in PVC-cased holes are cheap ways to trace soft clay layers between borings along an embankment or under a bridge approach. Caliper, density and televiewer logs locate voids, solution openings and mine workings at bridge piers and culverts (Chapter 2.11, Soluble Ground and Karst; Chapter 3.10, Mining and Man-Made Hazards). Crosshole seismic or radar between borings at a pier can show whether a weak zone seen in one core continues between the holes. Nuclear logging tools carry licensed radioactive sources, so they need a qualified logging contractor and the source handling rules on the right-of-way. Grout every hole after logging, as the railroad requires, so it does not become a path for water under the track.
A new bridge pier for a Class I railroad located in Kentucky will bear on limestone. Core from boring B-2 shows a broken zone near 30 ft, but B-1, 40 ft away, shows sound rock at that depth. A crosshole P-wave survey was run between the two borings to see whether the weak zone extends across the pier footprint. The engineer must convert the travel times to velocities, estimate rock quality, and decide where to put an added core boring.
| Variable | Value | Description |
|---|---|---|
| L | 40.0 ft | Source to receiver distance at each depth, from deviation surveys of both holes |
| tm | 2.70, 3.90, 2.45 ms | Measured first-arrival times at 20, 30 and 40 ft |
| td | 0.10 ms | Trigger and instrument delay, from a zero-offset test |
| VL | 18,000 ft/s | P-wave velocity of intact core (laboratory pulse velocity) |
(a) 15,400, 10,500 and 17,000 ft/s. (b) VI = 0.73, 0.34 and 0.89. (c) Estimated RQD about 73%, 34% and 89%; the weak zone near 30 ft continues across the footprint.
A single straight path gives the average along the path, not the location of the weak rock along it. Shoot the 25- to 35-ft interval at 1- to 2-ft depth steps, with source and receiver offset in depth to get crossing rays, and make a tomogram if the budget allows. Core a third boring near the middle of the footprint and check the core RQD against the velocity index before using the correlation for design. In limestone, a slow zone may be an open or clay-filled solution feature rather than fractured rock. If so, the pier needs the karst treatment of Chapter 2.11 rather than only a lower bearing value.
Source: Killeen (ed.) (1986), GSC Paper 85-27: Greenhouse and Pehme; Ivansson; New; Black; Olsson and Nilsson; Wright, Watts and Bramsoe; Mathew and Anderson; Howard; Hill. ASTM D5753; velocity index after Deere et al. (1967). Summarized and paraphrased; units converted. Full references under S9, S10, S11.