GHRM › Standards Register

Standards Register

Every standard and agency manual cited in GHRM, with its current edition, its status and a link to the issuing organization’s page. Checked 27 November 2026.

How the chapters were updated: a citation that gave an edition year now shows the current edition. If the citation also points to a table or page (for example “D698-12e2 T3, p.10”), the cited edition is kept, because the page numbers belong to that edition; hovering over the link shows the current edition. Withdrawn and superseded documents are marked in the text where they are cited. Standards pages on astm.org always open the active edition, so the links stay current when ASTM revises a standard.

ASTM, active

DesignationCurrent edition (official page)StatusCited in
C29ASTM C29/C29M-23Active2.4
C39ASTM C39/C39M-26Active3.8
C88ASTM C88/C88M-24Active2.4 · 5.2
C117ASTM C117-23Active2.4 · 5.2
C127ASTM C127-25Active2.4 · 5.2
C142ASTM C142/C142M-17(2023)Active2.4 · 5.2
C150ASTM C150/C150M-24Active7.2 · 7.3
C535ASTM C535-16(2024)Active2.4 · 5.2
C618ASTM C618-26Active7.2
C805ASTM C805/C805M-25Active5.1
C977ASTM C977-18(2024)Active7.2 · 7.3
D559ASTM D559/D559M-15(2023)e1Active2.5
D698ASTM D698-12(2021)Active2.1 · 2.5 · 2.6 · 2.7 · 3.8 · 5.2 · 5.3 · 6.2 · 7.2 · 7.3
D854ASTM D854-23Active2.3 · 2.5 · 2.9 · 5.2 · 6.2 · 7.2 · Appendix D · Appendix F
D1140ASTM D1140-25Active2.3 · 5.2 · 6.5
D1143ASTM D1143/D1143M-26Active3.8 · 5.3 · 6.1 · 7.2
D1196ASTM D1196/D1196M-24Active5.1 · 7.3
D1556ASTM D1556/D1556M-24Active2.1 · 5.1 · 5.3
D1557ASTM D1557-12(2021)Active2.1 · 2.5 · 3.8 · 5.2 · 5.3 · 7.1 · 7.2 · 7.3 · 8.4 · Appendices
D1586ASTM D1586/D1586M-18e1Active2.1 · 2.9 · 3.9 · 4.1 · 5.1 · 5.3 · 6.1 · 6.5 · 8.4 · Appendices · Appendix D · Appendix F
D1883ASTM D1883-21Active2.4 · 2.5 · 3.9 · 5.2 · 7.3
D1997ASTM D1997-25Active2.7
D2166ASTM D2166/D2166M-24Active2.1 · 3.8 · 5.2 · 7.2 · Appendix D
D2216ASTM D2216-19Active2.1 · 2.3 · 2.4 · 2.5 · 5.2 · 5.3 · 6.3 · 7.2 · 7.3 · Appendix D · Appendix F
D2419ASTM D2419-22Active5.2
D2434ASTM D2434-22Active2.9 · 5.2 · Appendix F
D2435ASTM D2435/D2435M-25Active2.1 · 2.5 · 2.6 · 2.7 · 2.9 · 3.8 · 5.2 · 6.2 · 7.1 · 7.2 · Appendix D · Appendix F
D2487ASTM D2487-17(2025)Active2.1 · 2.3 · 2.5 · 2.6 · 2.7 · 2.8 · 3.2 · 3.8 · 8.4 · Appendices · Appendix D
D2488ASTM D2488-17e1Active2.1 · 2.3 · 2.5 · 2.6 · 3.9 · 8.4 · Appendices · Appendix D
D2573ASTM D2573/D2573M-18Active2.1 · 2.6 · 5.1 · Appendix D
D2850ASTM D2850-25Active2.4 · 5.1 · 5.2 · 6.1 · 6.5 · 7.2 · Appendix D · Appendix F
D2974ASTM D2974-25Active2.1 · 2.7 · Appendix D
D3080ASTM D3080/D3080M-23Active2.1 · 3.8 · 5.2 · Appendix D
D3385ASTM D3385-18Active5.1
D3966ASTM D3966/D3966M-22Active3.8
D4050ASTM D4050-20Active5.1
D4221ASTM D4221-25Active2.5
D4318ASTM D4318-17e1Active2.1 · 2.3 · 2.5 · 2.6 · 5.1 · 5.2 · 6.2 · 7.3 · Appendix D
D4327ASTM D4327-17(2025)Active2.1 · 2.5 · 2.6 · 7.2 · 7.3
D4427ASTM D4427-23Active2.7
D4428ASTM D4428/D4428M-25Active5.1 · Appendix F
D4546ASTM D4546-21Active2.1 · 2.3 · 2.5 · 2.6 · 2.10 · 6.2
D4630ASTM D4630-19Active5.1
D4647ASTM D4647/D4647M-13(2020)Active2.5
D4694ASTM D4694-09(2025)Active2.4
D4718ASTM D4718/D4718M-15(2023)Active5.3
D4719ASTM D4719-20Active5.1 · 6.2 · 7.2 · Appendix F
D4767ASTM D4767-11(2020)Active2.1 · 2.6 · 3.8 · 5.2 · 6.1 · 6.3 · 7.1 · 7.2 · Appendix D · Appendix F
D4791ASTM D4791-19(2023)Active2.4 · 5.2
D4829ASTM D4829-21Active2.1 · 2.5 · 2.6 · 2.7 · 5.2
D4943ASTM D4943-25Active2.3 · 5.2
D4945ASTM D4945-17Active5.3 · 6.1
D5084ASTM D5084-24Active2.9 · 3.8 · 5.2 · Appendix F
D5092ASTM D5092/D5092M-16(2024)Active2.9 · 5.1 · 6.3 · Appendix F
D5101ASTM D5101-23Active2.5
D5321ASTM D5321/D5321M-26Active6.1 · 7.1 · Appendix F
D5434ASTM D5434-25Active4.1
D5753ASTM D5753-18Active5.1
D5777ASTM D5777-18Active2.4 · 5.1 · Appendix F
D5778ASTM D5778-20Active2.1 · 5.1 · 6.5 · Appendix D
D5878ASTM D5878-19Active2.8
D6032ASTM D6032/D6032M-17Active2.3 · 2.8 · 3.9 · 4.1 · Appendices
D6230ASTM D6230-21e1Active2.2
D6276ASTM D6276-19Active2.5 · 7.2
D6429ASTM D6429-23Active2.1
D6430ASTM D6430-18Active5.1
D6431ASTM D6431-25Active5.1
D6432ASTM D6432-19Active2.1 · 2.4 · 5.1 · Appendix F
D6467ASTM D6467-21e1Active2.6 · 6.3 · Appendix D
D6572ASTM D6572-21Active2.5 · 2.6
D6637ASTM D6637/D6637M-15(2023)Active7.2 · 7.3
D6817ASTM D6817/D6817M-17(2025)Active6.2
D6820ASTM D6820-20Active; the 02(2007) edition was withdrawn in 20165.2
D6913ASTM D6913/D6913M-17(2025)Active2.1 · 2.3 · 2.8 · 3.8 · 5.2 · 6.5 · Appendix D
D6938ASTM D6938-23Active2.1 · 5.1 · 5.2 · 5.3 · 6.2 · 7.3 · 8.4 · Appendix F
D6951ASTM D6951/D6951M-18(2023)Active5.1 · 5.2 · 7.3 · Appendix D
D7012ASTM D7012-23Active2.1 · 2.3 · 2.8 · 4.1 · 5.2
D7263ASTM D7263-21Active2.9 · 5.1 · 5.2 · 5.3 · 6.1 · 6.2 · 6.3 · 7.1 · 7.3 · Appendix D · Appendix F
D7400ASTM D7400/D7400M-19Active5.1
D7608ASTM D7608-18e1Active2.6
D7928ASTM D7928-21e1Active2.3 · 5.2 · 6.5 · 7.3 · Appendix D
D8169ASTM D8169/D8169M-18Active5.3
E4ASTM E4-24Active5.2
E1527ASTM E1527-21Active5.4
E1903ASTM E1903-19Active5.4
E2583ASTM E2583-07(2025)Active5.1 · Appendix F
G51ASTM G51-23Active2.1 · 5.2
G57ASTM G57-20Active5.1

ASTM, withdrawn

These standards are still cited because the method is described in GHRM, but ASTM no longer maintains them. Confirm with the owner railroad or the project specification which procedure to follow.

DesignationCurrent edition (official page)StatusCited in
D422ASTM D422-63(2007)e2Withdrawn 2016; use D6913/D6913M (sieve) and D7928 (hydrometer)5.2
D1241ASTM D1241-15Withdrawn 2024; no ASTM replacement; use the agency base/subbase specification2.4
D1587ASTM D1587/D1587M-15Withdrawn 2024; no ASTM replacement named2.1 · 4.1 · 5.2 · Appendices
D1633ASTM D1633-17Withdrawn 2026; no ASTM replacement named2.5 · 7.2 · 7.3
D2113ASTM D2113-14Withdrawn 2023; no ASTM replacement named4.1
D4044ASTM D4044/D4044M-15Withdrawn 2024; no ASTM replacement named2.9 · 5.1 · 5.2 · 6.3 · 7.2 · Appendix F
D4429ASTM D4429-09aWithdrawn 2018; no ASTM replacement named7.3
D4633ASTM D4633-16Withdrawn 2025; no ASTM replacement named3.9 · 4.1 · 5.1 · 5.3 · 6.1 · 6.5 · 8.4 · Appendices · Appendix D · Appendix F
D4644ASTM D4644-16Withdrawn 2025; no ASTM replacement named2.8 · 2.13 · 5.2
D4971ASTM D4971-16Withdrawn 2025; no ASTM replacement named5.1
D5333ASTM D5333-03Withdrawn 2012; collapse is now measured with D4546-212.10
D5731ASTM D5731-16Withdrawn 2025; no ASTM replacement named2.8 · 5.1 · 5.2
D5873ASTM D5873-14Withdrawn 2023; no ASTM replacement named5.1
D6635ASTM D6635-15Withdrawn 2024; no ASTM replacement named5.1

AASHTO

AASHTO sells its test methods and specifications as one annual book. The 46th edition (2026) is current. AASHTO has no free page for each standard, so these link to the book.

DesignationCurrent edition (official page)StatusCited in
AASHTO M 145AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-462.3 · 2.5 · 7.3
AASHTO M 147AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-467.3
AASHTO M 195AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-466.2
AASHTO M 288AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-467.2 · 7.3
AASHTO M 320AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-467.3
AASHTO T 222AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-467.3
AASHTO T 288AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-462.1 · 5.2
AASHTO T 290AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-462.13
AASHTO T 307AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-462.5 · 3.9 · 5.2 · 7.3 · Appendices · Appendix D
AASHTO T 89AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-462.3
AASHTO T 99AASHTO Materials Standards, HM-46 (2026)Check the edition year in HM-462.4 · 2.5 · 2.6 · 2.7 · 5.3 · 7.2 · 7.3

U.S. Army Corps of Engineers engineer manuals

DesignationCurrent edition (official page)StatusCited in
EM 1110-1-1802Geophysical Exploration for Engineering and Environmental Investigations31 Aug 1995 (current on USACE site)5.1
EM 1110-1-1804Geotechnical Investigations1 Jan 2001 (current on USACE site)2.3 · 2.9 · 3.3 · 3.9 · 4.1 · 5.1 · 6.1 · 6.2 · 6.3 · 6.5 · 7.1 · 7.2 · 7.3 · 8.4
EM 1110-1-1904Settlement Analysis30 Sep 1990 (current on USACE site)2.5 · 2.6 · 2.7 · 5.1 · 5.2 · 6.1 · 6.2 · 6.5 · Appendix D · Appendix F
EM 1110-1-1905Bearing Capacity of Soils30 Oct 1992 (current on USACE site)6.1
EM 1110-1-2908Rock Foundations30 Nov 1994 (current on USACE site)2.8 · 6.1 · Appendix F
EM 1110-2-1406Runoff from Snowmelt31 Mar 1998 (supersedes the 1960 edition); edition cited3.5
EM 1110-2-1417Flood-Runoff Analysis31 Aug 1994; edition cited3.5
EM 1110-2-1614Design of Coastal Revetments, Seawalls, and Bulkheads30 Jun 1995 (current on USACE site)7.1
EM 1110-2-1810Coastal Geology31 Jan 1995 (current on USACE site)1.1
EM 1110-2-1901Seepage Analysis and Control for Dams30 Sep 1986, Change 1 30 Apr 1993 (current on USACE site)2.5 · 2.9 · 5.3 · 6.4 · 7.1 · Appendix D · Appendix F
EM 1110-2-1902Slope Stability31 Oct 2003 (current on USACE site)3.9 · 5.2 · 5.3 · 6.3
EM 1110-2-1906Laboratory Soils Testing30 Nov 1970, Change 2 20 Aug 1986 (current on USACE site)5.2
EM 1110-2-1909Calibration of Laboratory Soils Testing Equipment1 Dec 1970, Change 1 10 Mar 1986 (current on USACE site)5.2
EM 1110-2-2502Retaining and Flood Walls29 Sep 1989 (current on USACE site)2.4
EM 1110-2-2504Design of Sheet Pile Walls31 Mar 1994 (current on USACE site)5.2 · 7.1
EM 1110-3-138Pavement Criteria for Seasonal Frost Conditions9 Apr 1984 (current on USACE site)2.5 · 2.6 · Appendix D

FHWA manuals and circulars

DesignationCurrent edition (official page)StatusCited in
FHWA-IF-02-034GEC 5, Evaluation of Soil and Rock Properties (2002)Superseded by GEC 5, Geotechnical Site Characterization, FHWA-NHI-16-072 (2017)2.3 · 2.5 · 2.6 · 2.7 · 2.8 · 2.9 · 4.1 · 5.1 · 6.1 · 6.2 · 6.5 · Appendix D · Appendix F
FHWA-NHI-01-002HEC-20, Stream Stability at Highway Structures, 3rd ed. (2001)Superseded by HEC-20 4th ed., FHWA-HIF-12-004 (2012)1.1 · 2.4 · 2.9 · 6.4 · Appendix F
FHWA-NHI-02-001HDS-2, Highway Hydrology, 2nd ed. (2002)Superseded by HDS-2 Highway Hydrology 3rd ed., FHWA-HIF-24-007 (2024)1.1 · 2.4 · 2.9 · 3.2 · 6.4 · Appendix F
FHWA-NHI-05-039Micropile Design and Construction (2005)Current6.1
FHWA-NHI-05-042Design and Construction of Driven Pile Foundations (2006)Superseded by GEC 12, FHWA-NHI-16-009 (2016)5.3 · 6.1
FHWA-NHI-06-019Ground Improvement Methods, Vol. I (2006)Superseded by GEC 13 Ground Modification Methods, FHWA-NHI-16-027 (2017)7.2
FHWA-NHI-07-092Geosynthetic Design and Construction Guidelines (2008)Current2.4 · 2.5 · 7.3
FHWA-NHI-14-007GEC 7, Soil Nail Walls (2015)Current7.1
FHWA-NHI-16-009GEC 12, Driven Pile Foundations (2016)CurrentAppendix F
FHWA-NHI-16-027GEC 13, Ground Modification Methods Vol. I (2017)Current2.7 · 7.2
FHWA-HI-92-001Rock Blasting and Overbreak Control (1991)Current FHWA/NHI course manual; no later edition6.3 · 8.4
FHWA-HIF-15-005Tunnel Operations, Maintenance, Inspection, and Evaluation (TOMIE) Manual (2015)Current; incorporated by reference in 23 CFR 650 Subpart E6.6
FHWA-HIF-15-006Specifications for the National Tunnel Inventory (2015)Current; companion to the TOMIE Manual6.6
FHWA-IF-05-002Highway and Rail Transit Tunnel Inspection Manual (2005)Superseded by the TOMIE Manual, FHWA-HIF-15-005 (2015)6.6
FHWA-IF-05-017Highway and Rail Transit Tunnel Maintenance and Rehabilitation Manual (2005)No later edition; listed in the TOMIE Manual as an owner resource6.6

AREMA, ACI and federal regulations

DesignationCurrent edition (official page)StatusCited in
AREMA MREManual for Railway Engineering, 2026Annual; tables cited as AREMA (2019) or AREMA19 were taken from the 2019 edition2.1 · 2.3 · 2.4 · 2.5 · 2.6 · 2.7 · 2.9 · 3.3 · 3.5 · 3.7 · 3.9 · 4.1 · 5.1 · 5.2 · 5.3 · 6.1 · 6.2 · 6.3 · 6.5 · 7.1 · 7.2 · 7.3 · 8.1 · 8.4 · Appendices · Appendix F · 6.6
ACI 318ACI CODE-318-25Current (2025)2.13 · 5.3 · Appendix F
ACI 211.1ACI PRC-211.1-22Supersedes ACI 211.1-91(09)5.3
49 CFReCFR, Title 49eCFR is updated dailyParts 213 and 237 are linked in the chapters
30 CFR 816eCFR, Title 30 Part 816 (816.61–816.68, use of explosives)eCFR is updated daily5.3 · 7.2 · 8.4
USBM RI 8507Structure Response and Damage Produced by Ground Vibration from Surface Mine Blasting (1980)Basis of the 30 CFR 816.67 blasting-level chart; not revised5.3
23 CFR 650 Subpart ENational Tunnel Inspection Standards (eCFR)Final rule July 2015, effective August 13, 2015; eCFR is updated daily. Applies to highway tunnels on public roads, not to freight railroad tunnels6.6
Bulletin 17CGuidelines for Determining Flood Flow Frequency, USGS Techniques and Methods 4-B5Published March 2018; current version 1.1 (May 2019); successor to Bulletin 17B3.5 · 3.8