Construction monitoring is the geotechnical consultant's final opportunity to verify that subsurface conditions match design assumptions, that materials meet…
Authors: Daniel P. Colwell and Mario Ruel
Supplemental References

Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After UFC 4-860-01FA (2004)” draw on item S10 and are rewritten for railroad clients. Blocks marked “After Selig & Waters (1994)” summarize item S11 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S12 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.

  1. Adam, D. (2007). “Roller-integrated Continuous Compaction Control (CCC): Technical Contractual Provisions & Recommendations.” In Gomes Correia, A., Momoya, Y. and Tatsuoka, F. (eds.), Design and Construction of Pavements and Rail Tracks. Taylor & Francis/BalkemaFind source ↗
  2. SHRP2 R02 / GeoTechTools (2012). Intelligent Compaction — technology fact sheetFind source ↗
  3. Stark, T. D., Thompson, H. B., Sussmann, T. R., Bruzek, R. and Banister, R. (2021). “Long-Term Field Monitoring of Fouled Ballast.” AREMA 2021 Annual ConferenceFind source ↗
  4. Bankston, A. and Wilk, S. (TTCI) (2021). “Use of Track Based Inspection Technologies to Improve the railroad's Ballast Maintenance Planning.” AREMA 2021 Annual ConferenceFind source ↗
  5. U.S. Army Corps of Engineers (1997). Pile Driving Equipment. Engineering Instructions EI 02G001Find source ↗Library entry
  6. Swan, C. C. Field Estimates of Pile Capacities, 53:139 Foundation Engineering supplemental notes. The University of IowaFind source ↗
  7. Hannigan, P. J. et al. (2006). Design and Construction of Driven Pile Foundations. FHWA NHI-05-042 (superseded by GEC 12, FHWA-NHI-16-009 (2016))Find source ↗
  8. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
  9. Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
  10. U.S. Army Corps of Engineers, Naval Facilities Engineering Command and Air Force Civil Engineer Support Agency (2004). UFC 4-860-01FA, Railroad Design and Rehabilitation. Unified Facilities Criteria, 16 January 2004 (supersedes TI 850-02, 1 March 2000); approved for public release, distribution unlimited. Used on this page: ch. 9 (§§4, 5)Find source ↗Library entry
  11. Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 9, 11, 14 and 15Find source ↗Library entry
  12. Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. Leiden: CRC Press/Balkema (Taylor & Francis). ISBN 978-1-032-10470-6. Case studies used on this page: §3.6, §7.8Find source ↗Library entry
  13. American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCE. Used on this page for project-management materialFind source ↗
  14. Goldbloom, J. (1989). Engineering Construction Specifications: The Road to Better Quality, Lower Cost, Reduced Litigation. New York: Van Nostrand Reinhold. Used on this page for project-management materialFind source ↗Library entry
  15. Seeley, I. H. (1993). Civil Engineering Quantities, 5th ed. Basingstoke: The Macmillan Press. Used on this page for project-management materialFind source ↗
  16. Skill Right (2013). Project Management Tools and Techniques: An Introductory Course in Project Management Foundations [training slides sponsored by Texas Instruments, Inc.; minor modifications by N. Santiago, Spring 2013 version]. Used on this page for project-management materialFind source ↗
  17. Sears, S. K., Sears, G. A., Clough, R. H., Rounds, J. L., and Segner, R. O., Jr. (2015). Construction Project Management: A Practical Guide to Field Construction Management, 6th ed. Hoboken, NJ: John Wiley & Sons. Used on this page for project-management materialFind source ↗
  18. Levy, S. M. (2007). Project Management in Construction, 5th ed. New York: McGraw-Hill. Used on this page for project-management materialFind source ↗
  19. Anglin, G. (2020). Introduction to Estimating, Plan Reading and Construction Techniques. Abingdon: Routledge. Used on this page for project-management materialFind source ↗
  20. Haidar, A. D. (2016). Construction Program Management – Decision Making and Optimization Techniques. Cham, Switzerland: Springer International Publishing. Used on this page for project-management materialFind source ↗
  21. Cretu, O., Stewart, R. and Berends, T. (2011). Risk Management for Design and Construction. Hoboken, NJ: John Wiley & Sons. Used on this page for project-management materialFind source ↗
  22. Goswami, I. (2015). Civil Engineering All-In-One PE Exam Guide: Breadth and Depth, 3rd ed. New York: McGraw-Hill Education. Used on this page: Section 5.3.10 (erosion and sediment control)Find source ↗
  23. Gupta, M. (2018). “Subsidence Mapping Using InSAR.” In Singh, R. P. and Bartlett, D. (eds.) (2018). Natural Hazards: Earthquakes, Volcanoes, and Landslides. Boca Raton, FL: CRC Press, 291–304. Used on this page: Section 5.3.25Find source ↗
  24. Jaboyedoff, M., Abellán, A., Carrea, D., Derron, M.-H., Matasci, B. and Michoud, C. (2018). “Mapping and Monitoring of Landslides Using LIDAR.” In Singh, R. P. and Bartlett, D. (eds.) (2018). Natural Hazards: Earthquakes, Volcanoes, and Landslides. Boca Raton, FL: CRC Press, 397–420. Used on this page: Section 5.3.25Find source ↗
  25. Shi, B. and Kong, X. (2018). “Study on Methods for Predicting the Settlements of Soft Clay Roadbed”, 370–377; Kong, X. (2018). “Research and Application on the Prediction Method of Pearl Model of High Filling Subgrade Settlement”, 356–362; and Kong, X. (2018). “Research on the Prediction Method of Gompertz Model for High Subgrade Settlement”, 363–369. All in Frikha, W., Varaksin, S. and Viana da Fonseca, A. (eds.) (2018). Soil Testing, Soil Stability and Ground Improvement. Proceedings of the 1st GeoMEast International Congress and Exhibition, Egypt 2017. Sustainable Civil Infrastructures. Cham: Springer. Used on this page: Section 5.3.26Find source ↗
  26. Austin Powder Company (2002). The Blaster’s Guide. Cleveland, OH: Austin Powder Company. Glossary and formula sheet used (scaled distance, ground transmission constant, presplitting, cushion blasting, overbreak, airblast, flyrock). Used on this page: Section 5.3.27Find source ↗
  27. Feng, X.-T. (ed.) (2017). Rock Mechanics and Engineering, Volume 4: Excavation, Support and Monitoring. Leiden: CRC Press/Balkema. Chapters used: Simser, “Design of rockburst support systems for deep hard rock mines” (Ch. 10); Feng, Wang and Röshoff, “A 3D laser scanning technique and its application to rock mechanics” (Ch. 18); Holub, Rušajová and Holečko, “Particle velocities for rockbursts recorded at seismic stations” (Ch. 21). Used on this page: Section 5.3.27; Sections 5.3.8, 5.3.17, 5.3.21 and 5.3.25Find source ↗
  28. U.S. Office of Surface Mining Reclamation and Enforcement. 30 CFR 816.61–816.68, Use of Explosives (airblast limits 816.67(b); ground vibration limits, scaled distance and blasting-level chart 816.67(d)). Used on this page: Section 5.3.27Open source ↗
  29. Siskind, D. E., Stagg, M. S., Kopp, J. W. and Dowding, C. H. (1980). Structure Response and Damage Produced by Ground Vibration from Surface Mine Blasting. Report of Investigations RI 8507. U.S. Bureau of Mines. Used on this page: Section 5.3.27Find source ↗
  30. Dowding, C. H. (1985). Blast Vibration Monitoring and Control. Englewood Cliffs, NJ: Prentice-Hall. Used on this page: Section 5.3.27Find source ↗

Photograph credits

The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.

  1. Photo 5.3.2-1 — Caterpillar CS563 smooth drum vibratory roller with CMV and MDP measurement technologies. Courtesy of David White and Pavana Vennapusa, Iowa State University. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  2. Photo 5.3.2-2 — Case SV212 smooth drum roller equipped with roller-integrated ks measurement technology (Ammann on-board display). Courtesy of David White and Pavana Vennapusa, Iowa State University. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  3. Photo 5.3.2-3 — Bomag smooth drum roller equipped with roller-integrated E VIB measurement technology. Courtesy of David White and Pavana Vennapusa, Iowa State University. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  4. Photo 5.3.2-4 — Sakai SV510D-III smooth drum roller equipped with CCV measurement technology. Courtesy of David White and Pavana Vennapusa, Iowa State University. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  5. Photo 5.3.2-5 — Volvo SD116DX smooth drum roller equipped with CMV measurement technology. Courtesy of David White and Pavana Vennapusa, Iowa State University. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  6. Photo 5.3.2-6 — Example of a smooth drum traditional compaction roller. Courtesy of David White. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  7. Photo 5.3.2-7 — Example of a pad foot traditional compaction roller. Courtesy of David White. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
← Previous · 5.0 Testing Chapter 5.2 — Laboratory Testing Program
Next · 5.0 Testing → Chapter 5.4 — Geo-Environmental Testing on Railroad Corridors