↑ Parent Menu⌂ Main Menu
← Chapter 5.3 Construction Monitoring and Field Testing
GHRM
Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · click a car to open it

5.3.24 Field Density by the Sand Cone Method

Construction monitoring is the geotechnical consultant's final opportunity to verify that subsurface conditions match design assumptions, that materials meet…
Authors: Daniel P. Colwell and Mario Ruel
5.3.24 Field Density by the Sand Cone Method

The sand cone test measures the in-place density of compacted fill directly: a hole is dug through a base plate, the soil removed is weighed, and the hole’s volume is found by filling it with a calibrated, free-flowing sand. It needs no radioactive source, so it is the referee test where nuclear gauge results are in dispute, and the calibration test for the gauge on each new fill material. The result feeds the compaction acceptance check (Section 5.3.2.5).

5.3.24.1 Method

Equation 5.3-7. Sand cone density

V = (Wbefore − Wafter − Wcone)/ρsand;   ρ = Wmoist/V;   ρd = ρ/(1 + w);   RC = γd/γd,max × 100

Wcone = sand to fill the cone and plate opening (calibrated); ρsand = bulk density of the sand (calibrated); 1 g/cm³ = 62.43 pcf. ASTM D1556.

5.3.24.2 Worked example

Example 5.3-7: Acceptance Test on Embankment Fill

A sand cone test was run on a lift of embankment fill for a siding on a Class I railroad located in Indiana. The masses are illustrative of a typical field test. The specification requires 95% of the standard Proctor maximum dry unit weight of 120.5 pcf at a water content within 2 points of optimum (12.4%).

hole: V = ?jar + cone + sandcompacted fillGivenSand 1.52 g/cm³; cone 1,580 gJar before 7,230 g, after 2,450 gSoil from hole 4,400 g; w = 11.6%γd,max = 120.5 pcf; 95% requiredRequiredHole volume, γ and γdRelative compaction
Sand cone: calibrated sand from the jar fills the excavated hole and the cone; the mass of sand used gives the hole volume.

Given

VariableValueDescription
ρsand1.52 g/cm³Calibrated sand
Wcone1,580 gCone and plate
Wbefore, Wafter7,230 g; 2,450 gJar + cone + sand
Wmoist4,400 gSoil from the hole
w11.6%Oven-dry
γd,max, wopt120.5 pcf; 12.4%Standard Proctor

Required

  • Hole volume, moist and dry unit weight
  • Relative compaction and acceptance

Equations

  1. Eq. 5.3-7: V = (Wbefore − Wafter − Wcone)/ρsand
  2. Eq. 5.3-7: ρ = Wmoist/V; ρd = ρ/(1 + w)
  3. Eq. 5.3-7: RC = γd/γd,max

Steps

Step 1 · Sand in hole
7,230 − 2,450 − 1,580
3,200 g
↓
Step 2 · Hole volume
3,200/1.52
V = 2,105 cm³ (0.074 ft³)
↓
Step 3 · Unit weights
4,400/2,105 = 2.090 g/cm³ = 130.5 pcf; /1.116
γd = 116.9 pcf
↓
Step 4 · Acceptance
116.9/120.5; 11.6 − 12.4
RC = 97.0%; w − wopt = −0.8
Spot check: Both criteria are met: 97.0% ≥ 95% and −0.8 is within ±2 points.
↓
Solution
RC = 97.0% at 0.8 points dry of optimum: the lift passes.

Solution

The lift is at 97% relative compaction, 0.8 points dry of optimum, and passes.

Keep trains and heavy equipment away from the test while the sand runs: vibration packs the sand, overstates the hole volume and understates the density. If a nuclear gauge is being used on the same fill, this test is its correlation point.

Open the sand cone calculator →
Hole volume from the calibrated sand, moist and dry unit weight, relative compaction and the water content check against optimum.

5.3.24.3 Sources

Procedures are summarized in original wording; equations and tabulated values are standard or published. Sample data are those printed in the cited laboratory manual unless stated otherwise.

← Previous · 5.0 Testing Chapter 5.2 — Laboratory Testing Program
Next · 5.0 Testing → Chapter 5.4 — Geo-Environmental Testing on Railroad Corridors