| Topic | Chapter |
|---|
| Shear strength parameters (c', φ', su) from lab testing | Chapter 5.2 |
| VST and CPTu undrained strength for soft foundation clay | Chapter 5.1 |
| Soil classification for strength assignment | Chapter 2.2 |
| Groundwater and pore pressure data for slope analysis | Chapter 2.8 |
| Settlement of consolidating embankment during staged construction | Chapter 6.2 |
| Seismic hazard, amax, and site amplification factors | Chapter 6.5 |
| Ground improvement for embankment stability (PVDs, DSM, stone columns) | Chapter 7.2 |
| Retaining wall design at slope toe or crest | Chapter 7.1 |
| Slope failure at track subgrade — failure mode identification | Chapter 2.3 |
| Instrumentation: inclinometers, settlement plates, piezometers | Chapter 5.3 |
| Slope stability documentation in geotechnical reports | Chapter 8.4 |
| Ring shear, triaxial, and direct shear test interpretation | Chapter 5.2 |