↑ Parent Menu⌂ Main Menu
← Chapter 6.3 Slope Stability Analysis
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

Author and Sources

Slope stability governs the design of railroad embankments, cut slopes, and side-hill fills across railroad networks.
Authors: Daniel P. Colwell and Mario Ruel
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

Supplemental references

  • U.S. Army Corps of Engineers (2003). Slope Stability. EM 1110-2-1902Official page ↗
  • Stark, T. D. et al. (2016). Development and Use of Fully Softened Shear Strength in Slope Stability Analyses, Third Draft. USACE / ASCE FSS SubcommitteeFind source ↗
  • Mott MacDonald (2011). The Effects of Railway Traffic on Embankment Stability. RSSB Research Project 1386 (Revised), Rail Safety and Standards BoardFind source ↗
  • Wyllie, D. C. and Mah, C. W. (2004). Rock Slope Engineering: Civil and Mining, 4th ed. Spon PressFind source ↗
  • Amend, F. Slope Stabilization with High Tensile Wire Mesh. Geohazards in Transportation in the Appalachian Region Conference, Geobrugg North AmericaFind source ↗
  • Wang, S., Hagan, P. C. and Cao, C. (2016). Advances in Rock-Support and Geotechnical Engineering. Butterworth-HeinemannFind source ↗Library entry
  • Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §9.7Find source ↗Library entry

File locations for these documents are listed under Supplemental References.

Project management sources

  • Swearingen, J. (n.d.). The Basics of Project Management Techniques [lecture slides PMT-1 to PMT-40; author from document properties]Find source ↗
  • Cretu, O., Stewart, R. and Berends, T. (2011). Risk Management for Design and Construction. Hoboken, NJ: John Wiley & SonsFind source ↗
  • Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & SohnFind source ↗
  • Pratt, D. J. (2011). Fundamentals of Construction Estimating, 3rd ed. Clifton Park, NY: Delmar Cengage LearningFind source ↗
← Previous · 6.0 Analysis Chapter 6.2 — Settlement Analysis
Next · 6.0 Analysis → Chapter 6.4 — Infiltration and Seepage