For railroad slopes in seismically active regions (the western United States, the Cascades and Rockies, and the Northeast passenger corridor), a pseudo-static horizontal force is applied to the failure mass to represent earthquake loading.
Feq = kh · W
Where:
The pseudo-static force F_eq is added to the driving moments/forces in the Bishop or Janbu equations. With k_h = 0.5 a_max/g, Hynes-Griffin and Franklin (1984) accept FS ≥ 1.0. EM 1110-2-1902 refers earthquake analysis to ER 1110-2-1806. Assume the owner railroad requires FS ≥ 1.1 pseudo-static.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| kh | horizontal seismic coefficient = a_max / g × 0.5 (USACE EM 1110-2-1902 recommendation | Field or lab test | Field: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. | clean sand 1–100, clay < 0.001 ft/day · by USCS group |
| amax | peak ground acceleration (g) from USGS hazard map at the site | Published hazard / climate data | USGS seismic design data / ASCE 7 hazard tool for the site location and site class (from Vs30 or SPT). | project-specific |
| W | total weight of failure mass (lb/ft) | Another equation | Area of the slice, wedge or wall section from the cross-section geometry × unit weight γ (from lab tests). | project-specific |
FS = Σ [1/mα,i · (c'i·bi + (Wi − ui·bi)·tan φ'i)]
/ Σ (Wi·sin αi + kh·Wi·yi/R)
Where R = failure circle radius (ft) and y_i = vertical distance from the circle center down to the centroid of slice i (ft), the moment arm of the horizontal force k_h·W_i.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| R | failure circle radius (ft) and R_m = moment arm for the pseudo-static force (approximately equal to the height of the centroid of the failur | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |