The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.
| ID | Correlation | Gives |
|---|---|---|
| IS-25 | Field vane strength correction | Sᵤ (field) |
| IX-06 | Normalized undrained strength from plasticity | Sᵤ/σ' |
| IX-07 | SHANSEP undrained strength ratio | Sᵤ |
| IX-08 | Friction angle of NC clay from plasticity | φ' |
| IS-07 | Undrained shear strength of clay from SPT | Sᵤ |
| IS-14 | Undrained shear strength from CPT | Sᵤ |
| RK-06 | Slope Mass Rating | SMR |
| RK-07 | Generalized Hoek–Brown criterion | m_b, s, a |
| RK-09 | Joint shear strength (Barton–Bandis) | τ |