↑ Parent Menu⌂ Main Menu
← Chapter 6.3 Slope Stability Analysis
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.3.14 Practice Questions and Full Answers

Slope stability governs the design of railroad embankments, cut slopes, and side-hill fills across railroad networks.
Authors: Daniel P. Colwell and Mario Ruel
6.3.14 Practice Questions and Full Answers
Each question is worked in the same five parts as the examples. Questions 6.3-1 and 6.3-3 are reasoning questions.
Question 6.3-1: Failure Modes and Analysis Methods

Problem Statement

A railroad has four slope problems on one subdivision: a rotational slump in an embankment, a translational slide of weathered soil on a rock cut, a compound slide along a weak layer, and a slow progressive failure in clay shale. The engineer must choose an appropriate analysis method for each failure mode and justify the choice.

Rotational slumpMethod?TranslationalMethod?CompoundMethod?Progressive (clay shale)Method?Given: four slope failures on one subdivision; justify the method from the expected surface geometry (EM 1110-2-1902)Black = given; red = required
Given and required for Question 6.3-1.

Given

VariableValueDescription
ModesRotational, translational, compound, progressive
RuleUSACE EM 1110-2-1902: justify the method from the expected surface geometry

Required

  • The analysis method suited to each mode

Equations

No equation is needed; the answer follows from the criteria listed under Given.

Steps

Step 1 · Rotational
Circular surface in fairly uniform cohesive soil: Bishop simplified or Spencer, with a circle search.
↓
Step 2 · Translational
Slip on a weak plane parallel to the slope: infinite slope, or Janbu with a specified planar surface.
↓
Step 3 · Compound
Surface partly along a weak layer: Janbu generalized, Spencer or Morgenstern-Price with non-circular surfaces.
↓
Step 4 · Progressive
Strain-softening clay or clay shale: any limit-equilibrium method with fully softened or residual strength.
↓
Solution
Match the method to the surface shape and the strength to the strain.

Solution

Rotational: Bishop or Spencer. Translational: infinite slope or a planar Janbu surface. Compound: Janbu generalized, Spencer or Morgenstern-Price. Progressive: any of these with fully softened or residual strength.

The choice of strength matters as much as the choice of method: a rigorous method with peak strength in a clay shale is less safe than a simple one with residual strength.

Question 6.3-2: Undrained Stability of a Fill With Taylor’s Chart

Problem Statement

A Class I railroad wants to build a 10-ft fill for a new siding over a clay foundation with the undrained strength shown, and the owner requires a factor of safety of at least 1.4. Using Taylor’s stability number, the engineer must check the fill and find the minimum undrained strength the foundation must have.

The method of Example 6.3-2.

H = 10 ftFill γ = 118 pcfSoft clay: su = 500 psfFS = ?GivenH = 10 ft; γfill = 118 pcfsu = 500 psfNs = 5.52 (Taylor)Target FS ≥ 1.4RequiredFS of the fillMinimum su for FS = 1.4Black = given; red = required
Given and required for Question 6.3-2.

Given

VariableValueDescription
su500 psf
γfill118 pcf
H10 ft
Ns5.52
TargetFS ≥ 1.4

Required

  • FS, and the minimum su for FS = 1.4

Equations

  1. Eq. 6.3-14: FS = Ns su / (γ H) — Taylor stability number, φ = 0

Steps

Step 1 · FS
5.52 × 500 / 1,180
2.34 ≥ 1.4
↓
Step 2 · Minimum su
1.4 × 1,180 / 5.52
299 psf
↓
Solution
FS = 2.34; su must exceed about 300 psf.

Solution

FS = 2.34, comfortably above 1.4. The slope would reach 1.4 at su ≈ 300 psf.

Confirm with CPTu soundings that su exceeds 300 psf throughout the foundation, and check the base bearing capacity as in Example 6.3-2, which may govern.

Question 6.3-3: Peak Versus Residual Strength in Clay Shale

Problem Statement

A cut through clay shale on a Class I railroad has failed twice since it was widened, each time along the same surface. The repair design is being prepared from laboratory strength tests that report both peak and residual angles. The engineer must explain the difference between the two and why the residual strength governs the repair.

Shear displacementShear stressPeak: φ′ = 20–28°Residual: φ′r = 6–14°Why the drop?Which governs the repair?GivenClay shale cut, failed twiceon the same surfacePeak φ′ 20°–28°Residual φ′r 6°–14°RequiredDifference between peak and residual strengthWhy residual governsBlack = given; red = required
Given and required for Question 6.3-3.

Given

VariableValueDescription
Peak φ′20° to 28°Clay shale
Residual φ′r6° to 14°After large displacement

Required

  • The difference between peak and residual strength
  • Why residual is used for clay shale cuts

Equations

No equation is needed; the answer follows from the criteria listed under Given.

Steps

Step 1 · Peak
The maximum strength of the intact fabric, before significant displacement.
↓
Step 2 · Residual
After large displacement the clay plates align along the slip plane; the strength falls to its minimum.
↓
Step 3 · Why it matters in clay shale
Swelling and progressive strain bring the mobilized strength down toward residual over months to years.
↓
Solution
Cuts that pass at peak can fail at residual.

Solution

Peak strength belongs to the intact fabric; residual strength is what remains after the plates have aligned along a slip surface. Clay shale cuts are designed for residual where a shear surface exists, because they fail progressively as the strength falls.

A cut that shows FS = 1.8 at peak, as in Example 6.3-3, can fall below 1.0 at residual. Railroad cuts through prairie clay shale have a long record of exactly this delayed failure.

Question 6.3-4: Tension Crack Depth and Water Force

Problem Statement

Open tension cracks have appeared along the crest of a 30-ft clay cut above a Class I railroad main line, and heavy rain is forecast. The engineer must estimate how deep the cracks can extend and the horizontal water force they would add to the slide mass if they fill with water.

Main lineH = 30 ftzc = ?Pw = ?c′ = 150 psf, φ′ = 18°γ = 122 pcfGivenH = 30 ft clay cutc′ = 150 psf; φ′ = 18°γ = 122 pcfCrack filled with waterRequiredTension crack depth zc Water force Pw per footBlack = given; red = required
Given and required for Question 6.3-4.

Given

VariableValueDescription
H30 ftCut height
c′, φ′150 psf; 18°
γ122 pcf

Required

  • Tension crack depth
  • Water force per foot if the crack is full

Equations

  1. Eq. 6.3-8: zc = (2c′/γ) tan(45° + φ′/2) — tension crack depth
  2. Eq. 6.3-9: Pw = ½ γw zc² — horizontal water force

Steps

Step 1 · zc (Eq. 6.3-8)
(2 × 150 / 122) × tan 54° = 2.459 × 1.376
zc = 3.4 ft
↓
Step 2 · Pw (Eq. 6.3-9)
0.5 × 62.4 × 3.38²
Pw ≈ 357 lb/ft
↓
Solution
zc ≈ 3.4 ft; Pw ≈ 357 lb/ft.

Solution

The crack extends about 3.4 ft; full of water it pushes on the sliding mass with about 357 lb per foot of slope.

The force is added to the driving side of the analysis and the crack depth is excluded from the resisting slip length. USACE EM 1110-2-1902 requires both for cohesive cut slopes; the water-filled case after a storm is often the critical one.

Question 6.3-5: Pseudo-Static Seismic Coefficient

Problem Statement

A railroad embankment slope in a seismic area is being checked for the design earthquake. The failure mass weighs 45,000 lb per foot of track, the peak ground acceleration is 0.25g, and the pseudo-static analysis gave the factor of safety shown against an owner target (assumed) of 1.1. The engineer must find the seismic coefficient and force and say whether the slope is acceptable.

W = 45,000 lb/ftkh = ? khW = ?amax = 0.25gGivenamax = 0.25gW = 45,000 lb/ftPseudo-static FS = 1.05Target FS = 1.1 (assumed)RequiredSeismic coefficient kh Horizontal force khWIs FS = 1.05 acceptable?Black = given; red = required
Given and required for Question 6.3-5.

Given

VariableValueDescription
amax0.25g
W45,000 lb/ftFailure mass
FS1.05Computed pseudo-static FS
Target1.1 (assumed owner requirement)

Required

  • kh and the horizontal force
  • Whether FS = 1.05 is acceptable

Equations

  1. Eq. 6.3-10: kh = 0.5 amax/g; Fh = kh W — Hynes-Griffin and Franklin (1984)

Steps

Step 1 · kh
0.5 × 0.25
0.125
↓
Step 2 · Fh
0.125 × 45,000
5,625 lb/ft
↓
Step 3 · Compare
1.05 < 1.1
Does not meet the target
↓
Solution
kh = 0.125; Fh = 5,625 lb/ft; FS = 1.05 fails.

Solution

kh = 0.125 and the seismic force is 5,625 lb/ft. FS = 1.05 is below the 1.1 target.

The half-PGA coefficient assumes up to about 1 m (3 ft) of displacement is acceptable, which it is not under track. Either improve the slope (flatter, buttressed or drained) or estimate the permanent displacement with a Newmark analysis (Chapter 6.5) and compare it with what the track can tolerate.

← Previous · 6.0 Analysis Chapter 6.2 — Settlement Analysis
Next · 6.0 Analysis → Chapter 6.4 — Infiltration and Seepage