↑ Parent Menu⌂ Main Menu
← Chapter 6.3 Slope Stability Analysis
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.3.6 Residual Strength and Progressive Failure

Slope stability governs the design of railroad embankments, cut slopes, and side-hill fills across railroad networks.
Authors: Daniel P. Colwell and Mario Ruel
6.3.6 Residual Strength and Progressive Failure

In overconsolidated clays and clay shales, the post-failure (residual) strength is significantly lower than peak strength. The residual friction angle φ'_r is measured by ring shear test (ASTM D6467) or repeated direct shear at large displacement.

Landslides After Rain
Landslides After Rain
Equation 6.3-12 — Residual Strength Envelope:

τ_r = c'_r + σ'_n · tan φ'_r

For Cretaceous clay shales (the northern plains and prairies; Appalachia): c'_r ≈ 0 psf; φ'_r = 8°–14° (Skempton 1985; ring shear data). This is dramatically lower than peak φ' = 24°–30°, meaning a slope designed at FS = 1.5 using peak strength may fail over decades at FS < 1.0 using residual strength as progressive straining reduces the mobilized angle along the surface.

Analyze cut slopes in clay shale with residual strength parameters; FS ≥ 1.2 is a common minimum. The same applies in Appalachian shale territory. The consultant must confirm whether the soil has experienced previous shearing (by identifying pre-existing slickensides in core samples or split spoon) — if slickensides are present, residual strength governs.

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
φ'r8°–14° (Skempton 1985Lab test (or correlation)Ring shear (ASTM D6467) or reversal direct shear (D3080); or Stark correlations with LL and clay fraction.CH 6–15°, CL 12–25° · by USCS group
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
Supplemental reference

Fully softened strength — the step between peak and residual

Section 6.3.6 moves directly from peak to residual strength. The intermediate fully softened strength (FSS) — close to the peak strength of the soil in a normally consolidated state — is the one that governs first-time slides in two situations common on railroads: (1) cuts in overconsolidated, fissured clays and clay shales, and (2) compacted clay embankments exposed to wet–dry cycles. The USACE/ASCE white paper notes that 3H:1V–4H:1V slopes 15–25 ft high routinely compute FS > 1.5 (often > 2) with peak strengths, yet many have failed, implying FS ≈ 1. One case describes a compacted fill slope that failed after about six years on a shallow surface, with back-analysis matching the FSS.

  • Softening process: stress relief opens joints and fissures, water infiltrates, the clay swells and weathers, and repeated cycles bring it toward a normally consolidated state. Softening develops faster and deeper in sloping ground than in level ground, and faster in uncovered slopes.
  • Depth: first-time slip surfaces in heavily overconsolidated clay ranged from 4 to about 65 ft deep (Skempton, 1977), with most case histories at 20–25 ft. Apply FSS to at least that depth in such clays. Most clay embankment failures are shallow (< 10 ft).
  • FSS vs. residual: the gap between φ′FSS and φ′r reaches about 16° for LL of 80–140% and is smaller (< 8° at 1,000 psf and < 6° at 8,300 psf) for LL < 50% (Figure 13-S3). It is larger at low normal stress, i.e., for shallow surfaces. Where the gap is large, check two cases: FS > 1.5 with FSS, and FS > 1.0 with residual strength on any pre-existing or slickensided surface.
  • Nonlinear envelope: the FSS envelope is curved, so a linear c′–φ′ fit over-predicts strength at the low normal stresses of shallow slides. The paper recommends a power function τ = a(σ′)b, with average b ≈ 0.96 for clay-size fraction CF ≤ 20%, 0.905 for 20–45%, and 0.852 for CF ≥ 50%. Do not add an apparent cohesion from a linear fit.
  • Temporary cuts may use a strength above FSS because there is not enough time to soften fully.
Difference between secant fully softened and residual friction angles as a function of liquid limit at effective normal stresses of 1,040 and 8,350 psf (Stark et al., 2015).
Supplemental Figure 13-S3. Difference between secant fully softened and residual friction angles as a function of liquid limit at effective normal stresses of 1,040 and 8,350 psf (Stark et al., 2015). Source: Stark, T. D. et al. (2016). Development and Use of Fully Softened Shear Strength in Slope Stability Analyses, Third Draft. USACE / ASCE FSS Subcommittee, p. 20.

Source: Stark, T. D. et al. (2016). Development and Use of Fully Softened Shear Strength in Slope Stability Analyses, Third Draft. USACE / ASCE FSS Subcommittee

(a) Deep slide in shale bedrock in an area of no known prior landsliding; (b) slickensided shale along the failure surface &mdash; the condition that calls for residual rather than fully softened strength.
Supplemental Figure 13-S2. (a) Deep slide in shale bedrock in an area of no known prior landsliding; (b) slickensided shale along the failure surface — the condition that calls for residual rather than fully softened strength. Source: Stark, T. D. et al. (2016). Development and Use of Fully Softened Shear Strength in Slope Stability Analyses, Third Draft. USACE / ASCE FSS Subcommittee, p. 19.
Supplemental reference · Feng (ed.) (2017)

Progressive Failure in Brittle Rock Slopes: What to Monitor

Large failures in fractured crystalline rock develop over long periods. Preparatory factors slowly weaken the rock mass by breaking intact rock bridges between joints, until a trigger such as heavy rain, snowmelt or an earthquake, or sometimes no identifiable trigger at all, completes the failure. Examples are deep weathering, pore-pressure cycling and daily and seasonal temperature cycles (Loew et al., in Feng 2017). The Randa slope in the Swiss Alps collapsed in 1991 with no trigger identified, and its remaining unstable part has been monitored since. The monitoring lessons are:

  • Robotic total stations reading many reflectors are the backbone of surface monitoring. Correct for air temperature and pressure, set the instrument on a stable, thermally protected pillar, and check it against fixed control points.
  • Borehole fiber-optic strain sensors locate the active fractures at depth and measure their opening directly.
  • Piezometers must be set at several depths in each borehole. These slopes often have strong vertical gradients in hydraulic head, so one reading per hole can be misleading.
  • Surface temperature and microseismic monitoring show the preparatory processes. Movement that tracks temperature cycles is not necessarily a sign of failure, but a steady trend underneath the cycles is.

For railroad work: Mountain lines run beneath high rock slopes that weaken slowly in this way. Rockfall history and slow crack opening are the warning signs. Where a large block or slope above the track shows measurable movement, separate the seasonal (thermal and groundwater) component from the trend before setting alarm levels, or the alarms will trip every spring and fall. Use the trend in velocity and acceleration, not a single displacement value, to judge whether failure is approaching (Section 5.3.21 for trigger-action plans).

Source: Loew, Gischig, Glueer, Seifert and Moore, “Multidisciplinary monitoring of progressive failure processes in brittle rock slopes,” in Feng (ed.) (2017), Ch. 20. Summarized and paraphrased. Full reference under S17.

← Previous · 6.0 Analysis Chapter 6.2 — Settlement Analysis
Next · 6.0 Analysis → Chapter 6.4 — Infiltration and Seepage