↑ Parent Menu⌂ Main Menu
← Chapter 6.3 Slope Stability Analysis
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.3.3 Limit Equilibrium Methods

Slope stability governs the design of railroad embankments, cut slopes, and side-hill fills across railroad networks.
Authors: Daniel P. Colwell and Mario Ruel
6.3.3 Limit Equilibrium Methods
6.3.3.1 General Limit Equilibrium Framework

All limit equilibrium methods divide the failure mass into vertical slices and apply static equilibrium to the slice forces. They differ in which inter-slice forces they include and which equilibrium equations they satisfy:

MethodSatisfies Moment Eq.Satisfies Force Eq.Inter-Slice ForcesBest Use
Ordinary (Fellenius)Yes (moment)NoNeglectedQuick check only; underestimates FS
Bishop SimplifiedYesVertical onlyHorizontal onlyCircular surfaces, most railroad practice
Janbu SimplifiedNoYesHorizontal onlyNon-circular; requires correction factor
Janbu GeneralizedYesYesFull (specified)Non-circular, compound
SpencerYesYesConstant inclinationRigorous; all surface types
Morgenstern-PriceYesYesVariable (f(x))Most rigorous; complex cases
6.3.3.2 Bishop Simplified Method

The Bishop Simplified method (1955) satisfies overall moment equilibrium and vertical force equilibrium for each slice. It is the standard method for circular failure analysis in railroad embankment design.

For a failure mass divided into n vertical slices, each of width b and height h at its center:

Equation 6.3-1 — Bishop Simplified Factor of Safety:

FS = Σ [1/mα,i · (c'i·bi + (Wi − ui·bi) tan φ'i)] / Σ Wi·sin αi

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
c'effective cohesionLab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
Equation 6.3-2 — m_α Factor:

mα,i = cos αi · [1 + (tan αi · tan φ'i) / FS]

Where:

  • c' = effective cohesion at slice base (psf)
  • φ' = effective friction angle at slice base (°)
  • W_i = total weight of slice i (lb/ft of embankment width)
  • u_i = pore water pressure at slice base (psf); u = γ_w × h_w where h_w = piezometric head above slice base
  • b_i = slice width (ft)
  • α_i = inclination of slice base from horizontal (°; positive = dip in direction of sliding)

Because FS appears on both sides of Equation 6.3-1, the solution is iterative: assume FS, compute m_α, compute new FS, repeat until convergence (typically 3–5 iterations).

Inputs: where each value comes from (7)
SymbolWhat it isComes fromHow to get itTypical range
c'effective cohesion at slice base (psf)Lab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
φ'effective friction angle at slice base (°)Lab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
Witotal weight of slice i (lb/ft of embankment width)Another equationArea of the slice, wedge or wall section from the cross-section geometry × unit weight γ (from lab tests).project-specific
uipore water pressure at slice base (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
uvertical stress / pore pressure = γ_w × h_w where h_w = piezometric head above slice baseAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
bislice width (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
αiinclination of slice base from horizontal (°Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Equation 6.3-3 — Slice Weight:

Wi = γavg,i · hi · bi · 1 ft (per unit width, kips/ft or lb/ft)

Where γ_avg,i = weighted average unit weight of materials in slice i (pcf); h_i = average slice height (ft).

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
hiaverage slice height (ft).Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
6.3.3.3 Pore Pressure Ratio (r_u)

For preliminary and parametric analysis, pore pressure is expressed as a fraction of total overburden:

Equation 6.3-4 — Pore Pressure Ratio:

ru = u / (γ · h) = pore pressure / total vertical stress

Typical r_u values: 0 for fully drained slope; 0.25–0.35 for partially drained embankment fill; 0.50 for steady-state seepage with phreatic surface at the slope surface (worst case). USACE EM 1110-2-1902 specifies that steady-state seepage with drawdown must be analyzed separately from the static long-term case.

Slope
Slope
Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
6.3.3.4 Janbu Simplified (Non-Circular Surfaces)

For a planar or compound failure surface, Janbu Simplified satisfies horizontal force equilibrium:

Equation 6.3-5 — Janbu Simplified FS:

FS = f₀ · Σ [1/nα,i · (c'i·bi + (Wi − ui·bi)·tan φ'i)] / Σ Wi·tan αi

Where bi = horizontal width of slice i. With nα written as cos²α (Eq. 6.3-6), the cohesion term uses the slice width bi, not the base length li (li = bi sec αi).

Source: Janbu, N. (1973), "Slope stability computations," Embankment-Dam Engineering, Wiley, 47–86; Duncan, J.M., Wright, S.G. and Brandon, T.L. (2014), Soil Strength and Slope Stability, 2nd ed., Wiley.

Stability of a Slope
Stability of a Slope
Groundwater Monitoring for Slope Stability
Groundwater Monitoring for Slope Stability
Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
bihorizontal width of slice i. With n_α written as cos²α (Eq. 6.3-6), the cohesion term uses the slice width b_i, not the base length l_i (l_iAnother equationComputed: b_i = b_i sec α_i).project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
c'effective cohesionLab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
Equation 6.3-6 — n_α Factor:

nα,i = cos²αi · [1 + (tan αi · tan φ'i)/FS]

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
Equation 6.3-7 — Janbu Correction Factor f₀:

f₀ = 1 + b1 · [d/L − 1.4(d/L)²]

Where d = maximum depth of failure surface below a chord connecting the crest and toe (ft); L = horizontal distance of the failure surface (ft); b1 = 0.69 for cohesion-only soils (φ = 0, undrained clay); 0.31 for friction-only soils (c' = 0); 0.50 for soils with both c' and φ' (also used when the surface crosses more than one soil type). f₀ corrects for inter-slice shear forces neglected in the simplified formulation.

Source: Janbu (1973); Abramson, L.W., Lee, T.S., Sharma, S. and Boyce, G.M. (2002), Slope Stability and Stabilization Methods, 2nd ed., Wiley, f₀ chart after Janbu.

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
dmaximum depth of failure surface below a chord connecting the crest and toe (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Lhorizontal distance of the failure surface (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
b10.69 for cohesion-only soils (φ = 0, undrained clay)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
6.3.3.5 Tension Crack

In cohesive soils, a tension crack develops at the crest of the failure mass to a theoretical depth:

Equation 6.3-8 — Tension Crack Depth:

zc = 2c' / (γ · √Ka) = 2su / γ (for φ' = 0, undrained)

Where K_a = tan²(45 − φ'/2). For φ' = 0: z_c = 2s_u / γ. The tension crack reduces the effective length of the failure arc and, when water-filled, adds a destabilizing hydrostatic pressure. EM 1110-2-1902 discusses how to include tension cracks; for embankments and cuts in cohesive soil, check the case with the crack full of water.

Water pressure in tension crack:

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
c'effective cohesionLab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
Equation 6.3-9 — Tension Crack Water Force:

Pw = 0.5 · γw · zc² (lb/ft, acts horizontally into failure mass)

Inputs: where each value comes from (1)
SymbolWhat it isComes fromHow to get itTypical range
wwater contentLab testOven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938).gravels/sands 3–25%, clays 15–70% · by USCS group
Supplemental reference

Shallow sloughing: the infinite slope check

EM 1110-2-1902 recommends the infinite slope method for slopes of cohesionless material, where the critical surface lies parallel to and just below the face. With c′ = 0, slope angle β and ru = u/γz:

F = (cos2β − ru) tan φ′ / (cos β sin β)

A circular search in the same material converges on a very shallow, large-radius circle with the same FS. USACE cautions that the lowest FS is often such a shallow surface, while deeper surfaces carry the real consequence. For a granular embankment over soft clay, report the deeper surfaces that could take out the track even when a skin slide has a lower FS. In the other direction, shallow fully-softened slides in clay fills (above) are exactly the ones that undercut ballast shoulders.

Source: U.S. Army Corps of Engineers (2003). Slope Stability. EM 1110-2-1902

6.3.3.6 Infinite Slope and Planar Rock Slide Checks

Two hand methods cover a large share of railroad slope problems and give a quick check on computer results. The infinite slope applies where the slip surface is shallow and parallel to the face: colluvium or residual soil over rock, weathered surfaces of fill slopes, and the surficial slides that close ditches after heavy rain. The planar slide applies to rock cuts where a joint or bedding plane dips out of the face more gently than the face itself. The handbook chapter on slopes in the library notes that the ordinary method of slices was itself developed by Fellenius to analyze failures along Swedish railways in the 1920s; the rock method follows Hoek and Bray and Wyllie and Mah's Rock Slope Engineering.

6.3.3.6.1 Method

Equation 6.3-16. Infinite slope with seepage parallel to the slope

FS = [c' + (γ z cos²β − γw m z cos²β) tanφ'] / (γ z sinβ cosβ)

where z is the vertical depth to the slip plane, β the slope angle, and m the height of the water table above the slip plane as a fraction of z.

Equation 6.3-17. Planar rock slide with a water-filled tension crack

FS = [c A + (W cosψp − U − V sinψp) tanφ] / (W sinψp + V cosψp)

A = (H − z)/sinψp; W = ½γH²[(1 − (z/H)²) cotψp − cotψf]; U = ½γwzwA; V = ½γwzw²

Both equations show the same lesson: water, not geometry, is usually what changes between a stable slope and a failure. In the infinite slope, raising m from 0 to 1 roughly halves the frictional resistance of a cohesionless slope. In the rock slide, water in the tension crack both pushes the block (V) and lifts it (U). The calculator plots the factor of safety against water level for this reason, and adds a pseudo-static seismic coefficient and a bolt force for the rock case.

6.3.3.6.2 Worked examples

Table 6.3-7. Fill slope and rock cut examples (calculator output)
CaseInputsResult
2H:1V fill slope, shallow slidez = 5 ft, γ = 120 pcf, c' = 50 psf, φ' = 30°, water at 0.6 zFS = 1.00; dry FS = 1.36; FS = 1.0 when m = 0.60
35-ft rock cut, face 70°, joint 30°γ = 160 pcf, c = 0, φ = 33°, 10-ft tension crackFS = 1.12 dry, 1.02 with the crack half full, 0.90 full; bolt force for FS 1.5 with the crack half full 19.00 kips/ft

The joint dips 3° less than its friction angle, so the cut stands dry with little margin; half a crack of water takes it to about 1.0 and a full crack to failure. Drainage holes behind the crest and a clean crest ditch are often worth more than bolting in such a cut. Where bolting is needed, the calculator reports the force per foot of slope for a factor of safety of 1.5.

Open the slope stability calculator →
Infinite slope with seepage and planar rock slide with tension crack, water, seismic coefficient and bolt force; FS plotted against water level.

6.3.3.6.3 Sources in the library

These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.

  • Stability of Slopes (R. E. Hunt, handbook chapter) and Stability of Slopes Part 2, 09 Slopes / Slope Stability folder: analytical approaches, infinite slope, planar and circular surfaces.Find source ↗
  • Rock Slope Engineering (Wyllie and Mah, 4th and 5th editions), 09 Slopes folder: plane failure with tension crack and water.Find source ↗
  • Use of Fully Softened Shear Strength in Slope Stability Analyses (2016 draft), Slope Stability folder: strength selection for clay slopes.Find source ↗
  • Slope Stability and Stabilization Methods (book) and Landslide Remediation Using Unconventional Methods.Find source ↗
6.3.3.7 Circular Slip Analysis of Embankments by the Simplified Bishop Method

An infinite-slope or planar check (Section 6.3.3.6) is enough for shallow sloughs and for rock sliding on a single plane. A track embankment on soft ground, however, usually fails on a deep curved surface that cuts through the fill and into the foundation, and the train load on the crest is part of what drives it. Duncan, Wright and Brandon's Soil Strength and Slope Stability treats the Simplified Bishop method as the standard procedure for circles. It satisfies moment equilibrium and vertical force equilibrium for each slice, and for circular surfaces its results are close to those of Spencer's fully rigorous method. The book also gives eight verification problems with published answers, and the calculator here was checked against two of them.

6.3.3.7.1 Method

Equation 6.3-18. Simplified Bishop factor of safety

F = Σ [c′b + (W + Q − ub) tanφ′] / mα  ÷  Σ [(W + Q) sinα + khW(yc − yg)/R]

mα = cosα + sinα tanφ′/F  (solved by iteration)

W is the slice weight summed through the layers, Q the train load carried by the slice, u the pore pressure at the base from the piezometric line, and kh an optional pseudo-static coefficient. Undrained (φ = 0) layers carry c = su. The calculator searches a grid of 17 × 17 centers with 31 radii each, from shallow circles in the fill to circles tangent to the base of the deepest layer, and then refines around the five lowest centers. It discards circles where mα drops below 0.2, because the Simplified Bishop result is unreliable there. Two strength issues from the library apply to railroad fills. First, compacted high-plasticity clay fills lose strength toward the fully softened value over years of wetting and drying; the ASCE fully softened strength white paper recommends that value for long-term analysis of cut and compacted clay slopes. Second, shallow failures in partly saturated fill depend on suction that rain removes, as Lu and Likos describe, so the dry-weather strength is not the design strength.

Table 6.3-8. Verification against published problems (Duncan, Wright and Brandon, Section 7.7)
ProblemPublished F (Simplified Bishop)Calculator
Example 1: 31.5 ft vertical cut in clay, su = 1,050 psf, γ = 120 pcf1.06 (programs and Taylor chart)1.07 (grid search)
Example 4: 100 ft sand fill (φ = 40°) on 50 ft of clay (su = 2,500 psf), published critical circle1.22 to 1.231.23 (same circle)

6.3.3.7.2 Worked example

A 15 ft embankment with 2H:1V side slopes and the track centerline 10 ft from the crest edge rests on 25 ft of soft clay (su = 600 psf) over stiff clay. Groundwater is 2 ft below original ground. The fill has c′ = 100 psf and φ′ = 28°. With the E80 strip load (1,882 psf over the 8.5 ft tie length), the critical circle passes through the soft clay and the minimum factor of safety is 1.19 (center at x, y = −20.6, 19.1 ft; radius 31.4 ft). Without the train the same section gives 1.80, and with kh = 0.1 under the train it falls to 0.99. For soft-ground embankments the governing condition is usually the loaded track, short term, on undrained foundation strength.

Always plot the critical circle and check that the grid minimum is not on the edge of the grid. Run the long-term case separately with drained, fully softened fill strengths and the wet-season piezometric line; the case with the lowest factor of safety governs.

Open the Bishop circular slip calculator →
Layered Simplified Bishop analysis with a piezometric line, an E80 strip load on the track, an optional seismic coefficient and a grid search for the critical circle, plotted on the section.

6.3.3.7.3 How the method compares, and what factor of safety to require

Duncan, Wright and Brandon's verification problems show how much the choice of method matters. Where φ = 0 and the surface is circular, every method that satisfies moment equilibrium gives the same answer. With frictional soils, the Ordinary Method of Slices runs about 10% low because it underestimates the normal stress on the slice bases. The Simplified Janbu method, used without its correction factor, also runs low. Spencer's method and the Simplified Bishop method agree closely.

Table 6.3-9. Factors of safety by method for two published problems (Duncan, Wright and Brandon, Tables 7.4 and 7.5)
ProcedureExample 3: Bradwell excavated slope (φ = 0)Example 4: sand fill on clay
Spencer1.761.19 to 1.20
Simplified Bishop1.761.22 to 1.23
Simplified Janbu, no correction1.631.07 to 1.08
Simplified Janbu, corrected1.761.16 to 1.17
Ordinary Method of Slices (spreadsheet, critical circle)1.761.08
Corps of Engineers' Modified Swedish1.80–
Finite element strength reduction1.791.19

The Bradwell slope failed about five days after excavation despite F = 1.76. Skempton and LaRochelle traced the failure to fissures and to strength measured on small samples. A correct method cannot make up for the wrong strength.

Table 6.3-10. Minimum factors of safety
BasisConditionRequired F
Duncan, Wright and Brandon, Table 13.1Repair cost comparable to the extra cost of a more conservative slope; small uncertainty / large uncertainty1.25 / 1.5
Repair cost much greater than the extra cost of a more conservative slope; small uncertainty / large uncertainty1.5 / 2.0 or more
Corps of Engineers (embankment and excavation slopes)End of construction1.3
Long-term steady seepage1.5
Rapid drawdown1.0 to 1.2

A slide that takes out main track usually costs far more to repair, and to recover traffic, than building the slope more conservatively, so the 1.5 to 2.0 row is the one that normally applies.

6.3.3.7.4 Sensitivity of the worked example

The worked example was rerun with the soft clay's undrained strength varied from 400 to 1,000 psf, with and without the E80 strip load. As the clay strength rises, the critical circle moves up out of the clay into the fill. From there on the factor of safety stops rising: about 1.43 under the train and 1.84 without it, set by the fill itself. With the train, F reaches 1.3 only at an undrained strength of about 650 psf, and never reaches 1.5 because the fill governs. Testing the clay more thoroughly cannot raise the result above the fill's limit; flattening the slope or strengthening the fill can.

4005006007008009001,00011.52Undrained strength of soft clay (psf)Minimum factor of safetyWith E80 strip loadNo train load
Figure 6.3-32. Minimum Simplified Bishop factor of safety for the worked example against the soft clay's undrained strength, from the calculator. Dashed lines mark 1.3 and 1.5.
Table 6.3-11. Sensitivity results
su (psf)F with E80F without train
4000.811.22
5001.001.52
6001.191.80
7001.371.84
8001.431.84
9001.431.84
10001.431.84

6.3.3.7.5 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • J.M. Duncan, S.G. Wright and T.L. Brandon, Soil Strength and Slope Stability, 2nd edition: the Simplified Bishop procedure, verification problems, and the reliability method used in Section 3.10Find source ↗
  • ASCE Geo-Institute EDS Committee (T.D. Stark, chair), Development and Use of Fully Softened Shear Strength in Slope Stability Analyses, white paper, third draft (2016): long-term strength of compacted and cut slopes in clayFind source ↗
  • N. Lu and W.J. Likos, Unsaturated Soil Mechanics: suction and shallow rainfall-induced slope failuresFind source ↗
  • R.F. Craig, Craig's Soil Mechanics, 7th edition and B.M. Das, Principles of Geotechnical Engineering, 7th edition: the method of slicesFind source ↗Library entry
  • I. Whyte, Geotechnical Design – Slopes (ICE): slope design practiceFind source ↗
← Previous · 6.0 Analysis Chapter 6.2 — Settlement Analysis
Next · 6.0 Analysis → Chapter 6.4 — Infiltration and Seepage