↑ Parent Menu⌂ Main Menu
← Chapter 6.3 Slope Stability Analysis
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.3.17 Apps and Analytical Tools 4

Slope stability governs the design of railroad embankments, cut slopes, and side-hill fills across railroad networks.
Authors: Daniel P. Colwell and Mario Ruel
6.3.17 Apps and Analytical Tools4

The web apps and the Geotechnical Analysis Suite calculators and workbook guides for this part of the analysis, gathered here from across the manual in the November 2026 restructure: 4 tools (1 interactive calculators). Where a tool applies to a particular section of this chapter it is also placed in that section in an orange tools strip. Each row lists the chapters and sections where the tool is used. Calculators open on dirtbert.com (sign-in required).

Apps

Each app runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (1.0.3).

Tools

Slope Stability & Seismic
SSResidual & Fully Softened Strength CorrelationsUsed in Chapter 3.8, 3.8.3 Embankment and Slope Failure Mechanisms; Chapter 6.3, 6.3.6 Residual Strength and Progressive FailureCalculator ▸Guide
SSSlope Stability — Effective StressUsed in Chapter 6.3, 6.3.3 Limit Equilibrium Methodsguide onlyGuide
SSSlope Stability — Total StressUsed in Chapter 6.3, 6.3.3 Limit Equilibrium Methodsguide onlyGuide
SSStaged Slope Stability — Pore PressureUsed in Chapter 6.3, 6.3.3 Limit Equilibrium Methodsguide onlyGuide

Calculator: Infinite Slope and Rock Plane Slide (Section 6.3.3.6)

Calculator: Circular Slip (Simplified Bishop) (Section 6.3.3.7)

← Previous · 6.0 Analysis Chapter 6.2 — Settlement Analysis
Next · 6.0 Analysis → Chapter 6.4 — Infiltration and Seepage