Plain text version
Pre-Analysis
- [ ] Collect strength parameters: c', φ', s_u by layer from Chapter 5.2 lab data
- [ ] Identify slickensides in boring core → require residual strength analysis
- [ ] Determine groundwater conditions: FEWL/SWL; piezometric levels (Chapter 2.8)
- [ ] Identify rapid drawdown potential (river crossings; seasonal flooding)
- [ ] Confirm seismic hazard zone (USGS maps); determine a_max and k_h
- [ ] Compute tension crack depth for all cohesive cuts and embankments
Analysis Execution
- [ ] Select appropriate method: Bishop (circular), Janbu (non-circular), or both
- [ ] Input correct unit weights (total above WT, buoyant below WT)
- [ ] Apply pore pressure: measured piezometer heads or r_u coefficient
- [ ] Include tension crack with water-filled assumption
- [ ] Run end-of-construction (undrained), long-term static (drained), seepage, drawdown
- [ ] Run pseudo-static seismic analysis where k_h ≥ 0.05g
- [ ] For clay shale: run residual strength analysis separately; document φ'_r source
- [ ] Search critical failure surface — minimum 200 trial circles or non-circular search
Deliverables
- [ ] Tabulate FS for all required loading conditions (Table 6.3-1 minimum FS)
- [ ] Provide cross-section with critical failure surface plotted
- [ ] Include tension crack location and water-filled force in output
- [ ] Staged construction plan with trigger criteria (if EOC FS < minimum)
- [ ] Instrumentation plan (settlement plates, piezometers, inclinometers) — Chapter 5.3
- [ ] SLOPE/W or SLIDE output file submitted electronically
- [ ] Peer review coordination memo (where the owner railroad requires it)