Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S9 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S10 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.
- U.S. Army Corps of Engineers (2003). Slope Stability. EM 1110-2-1902Find source ↗
- Stark, T. D. et al. (2016). Development and Use of Fully Softened Shear Strength in Slope Stability Analyses, Third Draft. USACE / ASCE FSS SubcommitteeFind source ↗
- Mott MacDonald (2011). The Effects of Railway Traffic on Embankment Stability. RSSB Research Project 1386 (Revised), Rail Safety and Standards BoardFind source ↗
- Wyllie, D. C. and Mah, C. W. (2004). Rock Slope Engineering: Civil and Mining, 4th ed. Spon PressFind source ↗
- Amend, F. Slope Stabilization with High Tensile Wire Mesh. Geohazards in Transportation in the Appalachian Region Conference, Geobrugg North AmericaFind source ↗
- Wang, S., Hagan, P. C. and Cao, C. (2016). Advances in Rock-Support and Geotechnical Engineering. Butterworth-HeinemannFind source ↗Library entry
- Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
- Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
- Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 10 and 11Find source ↗Library entry
- Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. Leiden: CRC Press/Balkema (Taylor & Francis). ISBN 978-1-032-10470-6. Case studies used on this page: §9.7Find source ↗Library entry
- Swearingen, J. (n.d.). The Basics of Project Management Techniques [lecture slides PMT-1 to PMT-40; author from document properties]. Used on this page for project-management materialFind source ↗
- Cretu, O., Stewart, R. and Berends, T. (2011). Risk Management for Design and Construction. Hoboken, NJ: John Wiley & Sons. Used on this page for project-management materialFind source ↗
- Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & Sohn. Used on this page for project-management materialFind source ↗
- Pratt, D. J. (2011). Fundamentals of Construction Estimating, 3rd ed. Clifton Park, NY: Delmar Cengage Learning. Used on this page for project-management materialFind source ↗
- Austin Powder Company (2002). The Blaster’s Guide. Cleveland, OH: Austin Powder Company. Glossary and formula sheet used (scaled distance, ground transmission constant, presplitting, cushion blasting, overbreak, airblast, flyrock). Used on this page: Section 6.3.7Find source ↗
- Federal Highway Administration (1991). Rock Blasting and Overbreak Control. Publication FHWA-HI-92-001, National Highway Institute Course 13211. Washington, DC: FHWA. Used on this page: Section 6.3.7Find source ↗
- Feng, X.-T. (ed.) (2017). Rock Mechanics and Engineering, Volume 4: Excavation, Support and Monitoring. Leiden: CRC Press/Balkema. Chapters used: Simser, “Design of rockburst support systems for deep hard rock mines” (Ch. 10); Feng, Wang and Röshoff, “A 3D laser scanning technique and its application to rock mechanics” (Ch. 18); Holub, Rušajová and Holečko, “Particle velocities for rockbursts recorded at seismic stations” (Ch. 21). Used on this page: Section 6.3.7; Sections 6.3.6 and 6.3.7 (rock bolts)Find source ↗
Photograph credits
The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.
- Photo 6.3.12-1 — Stabilizing a failed road fill slope in Fergus County, MT. (Photograph courtesy of Soil Nail Launcher, Inc., from www.soilnaillauncher.com.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.3.12-2 — Completed soil nail slope near Lake Tahoe. (Photograph courtesy of Landslide Solutions, Inc., from www.landslidesolutions.com.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.3.12-3 — Carefully sculpted and stained shotcrete finish, Del Norte Bluff. (Photograph courtesy of Del Norte County, from www.soilnaillauncher.com.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.3.12-4 — Installation of corrosion resistant fiberglass Launched Soil Nails™, Del Norte Bluff. (Photograph courtesy of Soil Nail Launcher, Inc., from www.soilnaillauncher.com.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
- Photo 6.3.12-5 — Shotcrete installation, all work is being done from above, Del Norte Bluff. (Photograph courtesy of Soil Nail Launcher, Inc., from www.soilnaillauncher.com.) Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗