↑ Parent Menu⌂ Main Menu
← Chapter 3.2 Desktop Study
GHRM
Railway Ground Hazard Risk Management · 3.0 · Risk Management
Sections · open a dropdown to go to a section or subsection

3.2.7 Desktop Study Deliverable

Building a preliminary site model from the office before anyone goes to the field: maps, records, history and hazards.
Author: Daniel P. Colwell
3.2.7 Desktop Study Deliverable

The desktop study is delivered as a map file and a short summary. Keep it to what the next step needs.

Table 3.2-7. Desktop study deliverable
ItemContent
Map file (KMZ)Study area, legacy borings and wells with logs, soil units, geology, flood and wetland layers, utilities from valuation maps, conceptual access routes, proposed borings
Site background summaryLocation and references; legacy work; expected profile; site history; hazards; data gaps; implications for design
Questions for reconnaissanceAccess, utilities, wet ground, obstructions, property lines, odors
Inputs to the risk ratingSituational attributes, trigger and thresholds (Chapter 3.8)

Interactive map tools, such as the hazard-monitoring map and the earth viewer on this site, can build and export the map file directly, so the same layers carry through to the field form and the full assessment.

← Previous · 3.0 Risk Management Chapter 3.1 — Scoping Proposals
Next · 3.0 Risk Management → Chapter 3.3 — Drilling Scope