| Source | What it gives | Use and cautions |
|---|---|---|
| Historical and current USGS topographic maps (15-minute from the 1890s; 7.5-minute editions) | Original ground, former channels, marshes, ponds, quarries, early rail lines | Compare editions to find filled ground and buried channels; the earliest edition is often the most useful |
| State geological survey maps and reports | Bedrock formation, surficial deposits, faults, karst, drift thickness | Formation names explain residual soils (a shale that weathers to fat clay; a carbonate that dissolves) |
| USGS 3DEP lidar (1-m, about 3-ft, DEM) and hillshade | Ground elevations, slopes, scarps, hummocky fill, drainage paths | Note the collection date; recent fill, stockpiles and ruts will not show. Phone GPS altitudes can differ from lidar by 3 to 8 ft and should not be used |
| Aerial and satellite imagery (current and historical) | Land cover, wet areas, ponding, erosion, clearing, construction history | State the positional accuracy of the base imagery; boring symbols may appear offset |
| USDA-NRCS soil survey (SSURGO) | Map units, USCS by depth, drainage class, depth to water and rock | Shallow (to about 5 ft) and generalized; urban land units have no data |
Assemble everything in one map file (KMZ) with a layer for each source. The same file becomes the base for the boring plan, the reconnaissance and, later, the report figures. Name layers so they can be traced into the report (for example "Previous borings and well logs" and "Drill-rig access routes (conceptual)").