Chapter 3.2 — Desktop Study

Building a preliminary site model from the office before anyone goes to the field: maps, records, history and hazards.
Author: Daniel P. Colwell

This chapter sets out the desktop study: the public and railroad data sources to review, how to read the history of a site from old maps and imagery, how to screen ground hazards from the office, and how the result sets the reconnaissance and drilling scope. It builds on the desktop study sections of Chapter 3.8, which apply the same sources to the risk rating of a single site.

Typical Values for This Chapter — from the GHRM Soil & Rock Properties Database

Failure case histories show why a desk study at the concept stage pays for itself; hydrologic screening values for the desktop review. English units; every value cites its library source, table and page. For preliminary design and checking test results, not a substitute for site testing.

Hydrologic screening: runoff coefficients, design storms and flood risk (57 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Rational method runoff coefficientBusiness – downtownASCE (1960)0.70.8250.95–HDS2 T5.7, p.5-33
Rational method runoff coefficientBusiness – neighborhoodASCE (1960)0.50.60.7–HDS2 T5.7, p.5-33
Rational method runoff coefficientResidential – single-familyASCE (1960)0.30.40.5–HDS2 T5.7, p.5-33
Rational method runoff coefficientResidential – suburbanASCE (1960)0.250.3250.4–HDS2 T5.7, p.5-33
Rational method runoff coefficientIndustrial – lightASCE (1960)0.50.650.8–HDS2 T5.7, p.5-33
Rational method runoff coefficientIndustrial – heavyASCE (1960)0.60.750.9–HDS2 T5.7, p.5-33
Rational method runoff coefficientRailroad yard areasASCE (1960)0.20.30.4–HDS2 T5.7, p.5-33
Rational method runoff coefficientParks, cemeteriesASCE (1960)0.10.1750.25–HDS2 T5.7, p.5-33
Rational method runoff coefficientUnimproved areasASCE (1960)0.10.20.3–HDS2 T5.7, p.5-33
Rational method runoff coefficientLawn, sandy soil, flat < 2%ASCE (1960)0.050.0750.1–HDS2 T5.7, p.5-33
Rational method runoff coefficientLawn, sandy soil, 2–7%ASCE (1960)0.10.1250.15–HDS2 T5.7, p.5-33
Rational method runoff coefficientLawn, sandy soil, steep > 7%ASCE (1960)0.150.1750.2–HDS2 T5.7, p.5-33
Rational method runoff coefficientLawn, heavy soil, flat < 2%ASCE (1960)0.130.150.17–HDS2 T5.7, p.5-33
Rational method runoff coefficientLawn, heavy soil, 2–7%ASCE (1960)0.180.20.22–HDS2 T5.7, p.5-33
Rational method runoff coefficientLawn, heavy soil, steep > 7%ASCE (1960)0.250.30.35–HDS2 T5.7, p.5-33
Rational method runoff coefficientAsphalt pavementASCE (1960)0.70.8250.95–HDS2 T5.7, p.5-33
Rational method runoff coefficientConcrete pavementASCE (1960)0.80.8750.95–HDS2 T5.7, p.5-33
Rational method runoff coefficientRoofsASCE (1960)0.750.850.95–HDS2 T5.7, p.5-33
Highway design storm return periodRural principal arterialAASHTO (1999)50yrHDS2 T1.1, p.1-5
Highway design storm return periodRural minor arterialAASHTO (1999)2537.550yrHDS2 T1.1, p.1-5
Highway design storm return periodRural major collectorAASHTO (1999)25yrHDS2 T1.1, p.1-5
Highway design storm return periodRural minor collectorAASHTO (1999)10yrHDS2 T1.1, p.1-5
Highway design storm return periodRural local roadAASHTO (1999)57.510yrHDS2 T1.1, p.1-5
Highway design storm return periodUrban principal arterialAASHTO (1999)2537.550yrHDS2 T1.1, p.1-5
Highway design storm return periodUrban minor arterialAASHTO (1999)25yrHDS2 T1.1, p.1-5
Highway design storm return periodUrban collectorAASHTO (1999)10yrHDS2 T1.1, p.1-5
Highway design storm return periodUrban local streetAASHTO (1999)57.510yrHDS2 T1.1, p.1-5
Risk the design flood is equaled or exceeded during service life2-year design floodService life 1 yr50%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life5-year design floodService life 1 yr20%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life10-year design floodService life 1 yr10%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life25-year design floodService life 1 yr4%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life50-year design floodService life 1 yr2%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life100-year design floodService life 1 yr1%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life2-year design floodService life 5 yr96.9%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life5-year design floodService life 5 yr67.2%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life10-year design floodService life 5 yr41%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life25-year design floodService life 5 yr18.5%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life50-year design floodService life 5 yr9.6%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life100-year design floodService life 5 yr4.9%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life2-year design floodService life 10 yr99.9%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life5-year design floodService life 10 yr89.3%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life10-year design floodService life 10 yr65.1%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life25-year design floodService life 10 yr33.5%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life50-year design floodService life 10 yr18.3%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life100-year design floodService life 10 yr9.6%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life5-year design floodService life 20 yr98.8%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life10-year design floodService life 20 yr87.8%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life25-year design floodService life 20 yr55.8%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life50-year design floodService life 20 yr33.2%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life100-year design floodService life 20 yr18.2%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life10-year design floodService life 50 yr99.5%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life25-year design floodService life 50 yr87%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life50-year design floodService life 50 yr63.6%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life100-year design floodService life 50 yr39.5%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life25-year design floodService life 100 yr98.3%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life50-year design floodService life 100 yr86.7%HDS2 T4.25, p.4-90
Risk the design flood is equaled or exceeded during service life100-year design floodService life 100 yr63.4%HDS2 T4.25, p.4-90
Open this set in the database ↗
Why geotechnical failures happen and what investigation is worth (6 values)
PropertySoil / materialClassConditionLowTypicalHighUnitsSource
Primary cause of geotechnical failure (share of cases)Shortcomings in designISSMGE TC302 Task Force 10, ~100 case histories45%FGE text, p.278
Primary cause of geotechnical failure (share of cases)Inadequate site investigationISSMGE TC302 Task Force 10, ~100 case histories20%FGE text, p.278
Primary cause of geotechnical failure (share of cases)Unforeseen phenomena and occurrencesISSMGE TC302 Task Force 10, ~100 case histories20%FGE text, p.278
Primary cause of geotechnical failure (share of cases)Shortcomings in constructionISSMGE TC302 Task Force 10, ~100 case histories14%FGE text, p.274
Site investigation spend worth makingProject costU.S. study (Threadgold 2002)3% of project costFGE text, p.272
Site investigation spend on projects with > 50% cost overrunOutturn project costUK projects (Clayton 2001)2.5% of project costFGE text, p.272
Open this set in the database ↗
References (2)
  1. FGE – Rao, V.V.S. & Sivakumar Babu, G.L., eds. (2016). Forensic Geotechnical Engineering. Developments in Geotechnical Engineering. Springer India.
  2. HDS2 – FHWA (2002). Highway Hydrology, Hydraulic Design Series No. 2, 2nd ed. FHWA-NHI-02-001 (superseded by HDS-2 Highway Hydrology 3rd ed., FHWA-HIF-24-007 (2024)).

Full database  ·  Laboratory tests  ·  Download Excel  ·  Library documents for this chapter  ·  Calculators for this chapter

Further reading — ICE Manual of Geotechnical Engineering
The chapters below cover the same ground in more depth. They are cited, not reproduced; see Appendix G for the full cross-reference and edition notes.
3.2.0 Purpose and Overview

A desktop study answers three questions before the field program is fixed: what is the ground likely to be, what has happened here before, and what could go wrong. Done well, it moves borings to where the answers are, removes borings that legacy data already cover, and warns the field crew about slag, peat, karst or a buried creek before the rig arrives. It is also the cheapest part of any job; a day in the office routinely saves a day of standby or a return trip.

Locate
Study-area polygon, coordinates, quadrangles
▬▸
Collect
Soils, geology, lidar, wells, legacy borings, records
▬▸
Read the history
Historical maps and imagery, fill, channels
▬▸
Screen hazards
Flood, wetland, karst, landslide, contamination
▬▸
Model
Expected profile, groundwater, data gaps
▬▸
Deliver
Map package (KMZ) and site background summary

The output is a short summary and a map file, not a report. Its value is in the expected subsurface profile and the list of questions it hands to the reconnaissance (Chapter 3.4) and the drilling scope (Chapter 3.3).

3.2.1 Sources: Geology, Topography and Lidar
Table 3.2-1. Core desktop data sources
SourceWhat it givesUse and cautions
Historical and current USGS topographic maps (15-minute from the 1890s; 7.5-minute editions)Original ground, former channels, marshes, ponds, quarries, early rail linesCompare editions to find filled ground and buried channels; the earliest edition is often the most useful
State geological survey maps and reportsBedrock formation, surficial deposits, faults, karst, drift thicknessFormation names explain residual soils (a shale that weathers to fat clay; a carbonate that dissolves)
USGS 3DEP lidar (1-m, about 3-ft, DEM) and hillshadeGround elevations, slopes, scarps, hummocky fill, drainage pathsNote the collection date; recent fill, stockpiles and ruts will not show. Phone GPS altitudes can differ from lidar by 3 to 8 ft and should not be used
Aerial and satellite imagery (current and historical)Land cover, wet areas, ponding, erosion, clearing, construction historyState the positional accuracy of the base imagery; boring symbols may appear offset
USDA-NRCS soil survey (SSURGO)Map units, USCS by depth, drainage class, depth to water and rockShallow (to about 5 ft) and generalized; urban land units have no data

Assemble everything in one map file (KMZ) with a layer for each source. The same file becomes the base for the boring plan, the reconnaissance and, later, the report figures. Name layers so they can be traced into the report (for example "Previous borings and well logs" and "Drill-rig access routes (conceptual)").

3.2.2 Soils, Groundwater and Hydrology

Groundwater and drainage control most railroad ground hazards, so the desktop study collects every clue to them:

  • Well and boring databases held by state geological surveys (water wells and engineering borings, often with depth to rock and water). In one recent study 42 wells and borings were found within about 1.5 miles, including 30- to 60-ft engineering borings from the 1960s inside the site and deep monitoring wells that reached limestone at 113 to 137 ft.
  • Soil survey drainage class and seasonal high water. Hydric and undrained units (for example Aquents) flag soft, wet ground and timber-mat access.
  • FEMA flood zones and the base flood elevation where the site is near water.
  • National Wetlands Inventory mapping, to keep borings and clearing a set distance from mapped wetlands (Chapter 3.6).
  • Stream and river gauges and rainfall records, which feed the live risk rating (Chapter 3.8).
Table 3.2-2. Reading groundwater from desktop sources
IndicatorWhat it suggestsFollow-up
Ground only a few feet above a nearby lake or riverGroundwater within a few feet of the surfaceRule out infiltration testing; plan casing or mud rotary for deeper borings
Deep, variable water levels in nearby wells (100 to 200 ft)Karst carbonate aquifer; perched water possible over rockRecord water at drilling, completion and 24 hours
Hydric soil units and wetland mapping along an old spur or ditchWettest ground on site; soft accessSchedule those borings after a dry period or on frozen ground
Ponding, dark standing water or odor reported in ditchesOrganic muck, sulfur-bearing fill or a sewer sourceHistorical review; four-gas monitoring while drilling
3.2.3 Historic Imagery and Railroad Records

The history of a site often explains its ground better than the geology map. Build a short timeline from the oldest map forward, and say what each period means for the borings.

Table 3.2-3. Example site timeline: an intermodal facility on former marshland
PeriodWhat happenedWhat it means for the exploration
Late glacialLake plain of a glacial lake; shallow postglacial lake within wetlands; dolomite bedrock at depthLacustrine sand and silt over glacial till; bedrock well below boring depths
1830s to 1880sMarsh used for hunting and fishing; first railroad on the marsh edgeOriginal surface at or near lake level
1880s to 1990sNear-continuous filling with steel slag, cinders, municipal waste, dredge spoil and debrisVariable, unengineered fill; cemented slag may cause auger refusal; screen cuttings
1960sEngineering borings drilled in the area for a planned developmentLegacy data to collect
2010sFacility expansions with borings and reportsProfile already known; target the gaps
PresentGround 5 to 13 ft above the lake; hummocky fill; a 50- to 60-ft mound in one cornerExpect 0.5 to 6 ft of fill; check imagery before scoping the mound
Table 3.2-4. Example site timeline: a siding through folded carbonate terrain
PeriodWhat happenedWhat it means for the exploration
PaleozoicCarbonates and shales thrust along a regional fault system; tectonic breccia in the shear zoneIrregular rock surface; rapid changes from residual clay to breccia
QuaternaryCreek downcutting; karst dissolution (sinkholes, pinnacled rock, clay-filled voids); old landslide massesCore where refusal is shallow; consider geophysics if the rock surface is erratic
1850sRailroad graded by hand and cart; embankment fill probably undocumented, with cindersTreat the existing embankment as uncontrolled fill
1960sInterstate built through the corridor; chronic cut-slope problems in the brecciaExpect weak, sheared rock in cuts
2020sSiding design borings; avoidance redesign with steeper slopesNew borings needed only where the redesign moves onto unexplored ground

Railroad records add what public sources cannot: track charts, slow-order and geometry-defect history, past repairs, valuation maps with utilities and property lines, and earlier reports. Ask for them in the first week; they often take longest to arrive.

Thin soil over weathered rock in a cut beside the track. Historical maps and the geology map told the team to expect shallow rock here, and the boring plan carried rock-coring contingency for it.
Figure 3.2-1. Thin soil over weathered rock in a cut beside the track. Historical maps and the geology map told the team to expect shallow rock here, and the boring plan carried rock-coring contingency for it.
3.2.4 Hazard Databases
Table 3.2-5. Hazard screening sources
HazardSourcesNotes
Flooding and scourFEMA flood maps, stream gauges and flood categories, historical high-water marksPair water-sensitive sites with a gauge for the live rating
LandslidesState and USGS landslide inventories, lidar hillshade, previous reportsLook for scarps, hummocky ground and bowed fences
Karst and subsidenceState karst maps, sinkhole inventories, mine maps, InSAR where availablePinnacled rock and voids call for coring and possibly geophysics
SeismicUSGS hazard maps and site class correlationsLiquefaction screening for loose saturated sands (Chapter 6.5)
ContaminationState and federal remediation, landfill, underground tank and RCRA databases; a radius reportSlag fill aquifers can have pH above 12; plan screening and cuttings handling
Protected resourcesWetlands inventory, threatened and endangered species (IPaC), migratory bird windowsAffects clearing dates and access (Chapter 3.6)

For network-scale screening, the Federal Railroad Administration's Composite Hazard Index ranks segments, while gauge-based monitoring and public databases rank individual sites. Chapter 3.8 compares the two and shows how the desktop study feeds the preliminary risk rating.

3.2.5 Hydrologic Screening and Live Conditions

For a water-sensitive site (a fill across a creek, a culvert, a slope above a river), the desktop study also sets the numbers the site will be watched against: the culvert capacity storm, the river stage at which water reaches the toe, and the antecedent rainfall that has preceded past failures. These become the thresholds of the live risk rating (Section 3.8.26) and the trigger rating of Section 3.8.18.

How rainfall becomes runoff and flooding. The desktop study identifies which part of this chain controls the site: the storm, the catchment, the culvert or the river.
Figure 3.2-2. How rainfall becomes runoff and flooding. The desktop study identifies which part of this chain controls the site: the storm, the catchment, the culvert or the river.
3.2.6 Preliminary Site Model and Data Gaps

Finish with an expected profile, stated as a simple table with depth ranges, and a list of what the borings must answer. The profile below, assembled from 43 legacy borings for a parking expansion, set the depths of both the light-tower and the pavement borings.

Table 3.2-6. Example expected profile from legacy borings
Depth (typical)StratumNotes
0 to 1 ftTopsoil, gravel or asphaltTopsoil often mixed with cinders
0.5 to 3 to 6 ftSlag, cinder and urban fillVery dense, cemented slag; auger refusal in several borings; chemical odor in one
3 to 6 ft (local)Organic clay and peatWater content over 100 percent; drives settlement
4 to 8 to 13.5 ftLacustrine sand and siltVery loose to medium dense, saturated; N typically 2 to 8
8 to 13.5 to 30+ ftGlacial tillStiff to very stiff lean to fat clay; Qu about 1.0 to 3.7 tsf; no legacy boring below 30 ft
1 to 6 ftGroundwaterClose to the lake level
Write the data gaps as questions. "No legacy boring went below 30 ft" becomes "Where is the bottom of the till, and what is below it?" and sets the light-tower borings at 35 ft.

The same model drives design implications: light-tower shafts will need casing or slurry through the loose saturated sand and will take their capacity in the till; pavement subgrade will need undercut and geosynthetics or full-depth reclamation; organic pockets control settlement; slag and odors call for screening and a cuttings plan.

3.2.7 Desktop Study Deliverable

The desktop study is delivered as a map file and a short summary. Keep it to what the next step needs.

Table 3.2-7. Desktop study deliverable
ItemContent
Map file (KMZ)Study area, legacy borings and wells with logs, soil units, geology, flood and wetland layers, utilities from valuation maps, conceptual access routes, proposed borings
Site background summaryLocation and references; legacy work; expected profile; site history; hazards; data gaps; implications for design
Questions for reconnaissanceAccess, utilities, wet ground, obstructions, property lines, odors
Inputs to the risk ratingSituational attributes, trigger and thresholds (Chapter 3.8)

Interactive map tools, such as the hazard-monitoring map and the earth viewer on this site, can build and export the map file directly, so the same layers carry through to the field form and the full assessment.

3.2.8 Cross-References
Table 3.2-8. Related chapters
TopicRefer to
Desktop study sections of the risk assessmentSection 3.8.23
Trigger rating and geospatial frequencySections 3.8.18 and 3.8.19
ReconnaissanceChapter 3.4
Site conditions write-upChapter 3.5
Drilling scopeChapter 3.3
Groundwater characterizationChapter 2.8
Problem soils (silts, clays, peats, rock and sand)Chapters 2.4 to 2.7
3.2.9 Curve Superelevation and Speed Review

The desktop study usually starts from the track chart or aerial imagery, and curve data come with it. Curvature matters to the geotechnical work in several ways: superelevation thickens the ballast under the high rail, sharp curves (over 3°) add centrifugal force to shoring design next to track (Chapter 7.1), and the speeds the curve can carry decide whether critical-speed checks (Chapter 6.5) or passenger ride limits apply. A Class I railroad's recommended method, based on the standard balance equation, is summarized here.

3.2.9.1 Method

Equation 3.2-1. Balance, spiral length and maximum speed

E = 0.0007 D V² − Eu   Spiral L = max(1.63 Eu Vp, 62 E)   Vmax = √[(E + Eu)/(0.0007 D)]

E = superelevation (in.), D = degree of curve (chord definition, R = 50/sin(D/2)), V = speed (mph), Eu = underbalance (in.). The 62E term keeps the runoff no steeper than 1 in. in 62 ft (freight car torsion); 1.63 EuVp is for passenger comfort.

Table 3.2-9. Superelevation limits in the method
LimitValue
MaximumLesser of balanced elevation and 5 in. (more only with the chief engineer's authority)
MinimumGreatest of 1/2 in., balanced freight − 2 in., balanced passenger − 3 in.
Choice within the rangeAs low as practical, since most tonnage is slow heavy freight that damages the low rail
Reverse curvesAt least 100 ft of tangent between spirals
Grade compensation (industry track standard)0.04% per degree of curve

3.2.9.2 Worked example: 2° curve, freight 60 mph, passenger 75 mph

Table 3.2-10. Calculator output (matches the method's Example 1)
ResultValue
Balanced elevation, freight / passenger5" / 7 7/8"
Allowed range4 7/8" to 5"
Superelevation applied4 7/8"
Minimum spiral (passenger comfort governs over freight torsion, 302 ft)367 ft
Maximum passenger speed at Eu = 3 in.75 mph

Open the curve superelevation calculator →
Degree of curve and radius, balanced and allowable superelevation, spiral length, maximum speeds and grade compensation.

3.2.9.3 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated limits are standard or published values. Individual railroads are not named.

  • A Class I railroad's recommended method for superelevation, spiral length and maximum train speed on curves (2002), Carriers folder.Find source ↗
  • A Class I railroad's standard specifications for private sidetracks (2016), Carriers folder: curvature limits and grade compensation.Find source ↗
3.2.10 Using NRCS Soil Survey Data in the Desktop Study

The NRCS soil survey covers almost all of the United States and is usually the first soil information available for a railroad site. It is an agricultural (pedological) classification of the upper 5 to 6.5 ft of the ground, mapped at about 1:12,000 to 1:24,000, and its engineering tables are estimates for typical soils, not test results. Used with that in mind, it is very good at flagging problem soils along a corridor before any borings are drilled (Arnold and Eswaran 2003; García-Gaines and Frankenstein 2015).

3.2.10.1 How the survey is organized

  • Map units are the areas outlined on the map. Each is named for one or more soil components (usually soil series) and contains inclusions of other soils too small to map separately.
  • Soil Taxonomy classifies soils in six categories: order, suborder, great group, subgroup, family and series. The series is the most detailed. The family name gives particle-size class, mineralogy and soil temperature, all useful to an engineer.
  • Horizons are layers formed by weathering: O (organic), A (topsoil), E (leached), B (subsoil enriched in clay, iron or carbonate), C (little-altered parent material) and R (bedrock). Suffixes add detail: t for clay accumulation, ss for slickensides, g for gleying (wet), k for carbonate, y for gypsum, z for salts, x for fragipan.
  • Engineering data (from SSURGO through Web Soil Survey): USCS and AASHTO classes, liquid limit and plasticity index ranges, linear extensibility (shrink–swell), depth to water table and bedrock, flooding and ponding frequency, frost action, risk of corrosion of steel and concrete, and ratings for uses such as local roads and shallow excavations.

3.2.10.2 Soil orders and what they flag

Table 3.2-11. The 12 Soil Taxonomy orders, their formation and engineering flags (formation after Arnold and Eswaran 2003; engineering flags are screening judgment)
OrderHow it formsEngineering flags for railroad work
GelisolsPermafrost; freeze–thaw churningThaw settlement and frost heave; ice-rich ground
HistosolsOrganic matter accumulates in waterlogged groundPeat and muck: very compressible, weak, long-term settlement (Chapter 2.6)
SpodosolsAcid leaching of iron and aluminum from sandy soil into a cemented subsoilCemented layers that perch water; acidic and often wet: corrosion
AndisolsWeathering of volcanic ashLow density, high water content; strength and plasticity change irreversibly on drying and remolding
OxisolsExtreme tropical weathering to iron and aluminum oxidesDeep residual soils; aggregated clays that classify oddly (Chapter 2.13); mainly Hawaii and Puerto Rico
VertisolsSmectite clay shrinks and swells, forming cracks and slickensidesExpansive clay: track geometry loss, shallow slope failures, structure heave (Chapter 2.5)
AridisolsDry climate; carbonate, gypsum and salt accumulateCollapsible soils (Chapter 2.9), caliche and arid soils (Chapter 2.13), gypsum dissolution (Chapter 2.11), corrosive salts
UltisolsAcid leaching; clay moves into the subsoilResidual soils of the humid Southeast (Chapter 2.13); erodible surface, acidic and corrosive
MollisolsDark, humus-rich topsoil under grasslandOften on loess: collapsible when dry, frost-susceptible silt
AlfisolsClay moves into a base-rich subsoilClayey subsoil under silty topsoil; frost-susceptible silt
InceptisolsWeak developmentVariable; often young soils on slopes and floodplains
EntisolsLittle or no development: recent deposits or eroding slopesFresh alluvium, dune sand, colluvium: loose, soft, liquefiable or erodible

3.2.10.3 USDA texture and USCS are not the same

The USDA texture class uses particle size only: sand is 2 to 0.05 mm, silt 0.05 to 0.002 mm and clay finer than 0.002 mm, with gravel added as a modifier. USCS sets the sand–fines boundary at 0.075 mm (No. 200 sieve) and splits fines by plasticity, not size. So a texture class does not fix a USCS group; it only makes some groups more likely. A consensus mapping from several data sets, thousands of samples in all, is given in Table 3.2-13.

Table 3.2-12. Particle-size limits compared
FractionUSDAUSCS (ASTM D2487)
Gravel> 2 mm (modifier)75 to 4.75 mm
Sand2 to 0.05 mm4.75 to 0.075 mm
Silt0.05 to 0.002 mmFines < 0.075 mm, split into silt and clay by plasticity (A-line)
Clay< 0.002 mm
Table 3.2-13. Most likely USCS group for each USDA texture class (after García-Gaines and Frankenstein 2015), with the spread seen in one 1,196-sample data set
USDA textureMost likely USCSSpread in the 1961 data set
SandSPSM and SP-SM about equally common
Loamy sandSMAlmost all SM
Sandy loamSMSM 40%, ML 20%, SC 13%, SM-SC 9%, CL 8%
Sandy clay loamSCMostly CL (19 of 31), then SC
Sandy claySC or CLToo few samples
LoamCLCL 53%, ML 22%, CL-ML 11%
Silt loamMLCL 45%, ML 36%, CL-ML 10%
SiltMLAll ML
Clay loamCLCL 78%
Silty clay loamCLCL 65%, CH 28%
ClayCH or CLCH 66%
Silty clayCH or CLCH 78%, CL 22%

The spread shows why the mapping is only a starting point: a silt loam is about as likely to be CL as ML, and the report itself recommends laboratory classification for anything that matters.

3.2.10.4 Using the survey along a railroad

  • Screen the corridor for Vertisols and soils with high linear extensibility, Histosols and organic surface horizons, hydric and frequently ponded soils, gypsic and salic horizons, shallow bedrock and fragipans, and soils rated for high frost action.
  • Use the corrosion ratings for buried steel and concrete as a first screen for culverts, piles and signal and communication cable routes, then test (Section 5.2.30). Soil-map-based ratings of shrink–swell and salt corrosion have been used to route buried telecommunication cables away from damaging soils, and the same approach suits railroad cable routes.
  • Know the limits. Data stop at about 5 to 6.5 ft. The existing roadbed and yards are usually mapped as urban land, made land or pits with no data. Values are typical ranges, not site measurements.
  • Record the map unit, component and series in the desktop study so later boring results can be compared and the map can be judged for the rest of the line.

For railroad work: Use the soil survey to decide where to drill and what to test, not to design. A corridor-length table of map units with their order, texture, listed USCS, linear extensibility, depth to water and corrosion ratings takes little time to build from Web Soil Survey and often shows where the problem soils are before the first boring. Flag any length of track where the survey and the track maintenance record agree, for example high shrink–swell soils where surfacing is frequent.

3.2.10.5 Sources

  1. Arnold, R. W. and Eswaran, H. (2003). “Conceptual Basis for Soil Classification: Lessons from the Past.” In Eswaran, H., Rice, T., Ahrens, R. and Stewart, B. A. (eds.), Soil Classification: A Global Desk Reference. Boca Raton, FL: CRC Press, Chapter 4.Find source ↗
  2. Fitzpatrick, R. W., Powell, B., McKenzie, N. J., Maschmedt, D. J., Schoknecht, N. and Jacquier, D. W. (2003). “Demands on Soil Classification in Australia.” In Eswaran, H. et al. (eds.), Soil Classification: A Global Desk Reference. Boca Raton, FL: CRC Press, Chapter 9.Find source ↗
  3. García-Gaines, R. A. and Frankenstein, S. (2015). USCS and the USDA Soil Classification System: Development of a Mapping Scheme. ERDC/CRREL TR-15-4. Hanover, NH: U.S. Army Engineer Research and Development Center, Cold Regions Research and Engineering Laboratory.Find source ↗

Percentages in Table 3.2-13 are calculated from the 1961 Waterways Experiment Station data set reproduced in the report.

Example 3.2-1: Reading a Soil Survey Map Unit for a Siding Extension

Problem Statement

A Class I railroad located in Texas plans to extend a siding across farmland beside the main track. Before borings are scheduled, the desktop study pulls the soil survey map unit that covers most of the new alignment. The engineer must check whether the USCS classes listed in the survey agree with the USDA textures, estimate the shrink–swell potential of the upper 5 ft, and decide what the investigation must look for (Section 3.2.10).

Ap Bt Btss 08 in.36 in.60 in. Given (map unit component, typical horizons) Ap 0–8 in.: silt loam; listed USCS CL-ML; LEP 1.5% Bt 8–36 in.: silty clay loam; listed USCS CL; LEP 4.5% Btss 36–60 in.: clay with slickensides; listed USCS CH; LEP 7.5% (LEP = linear extensibility percent) Required:LE over 60 in.,USCS check,hazard flags
Figure 3.2-3. Example 3.2-1: typical soil profile of the map unit.

Given

VariableValueDescription
Ap, 0–8 in.Silt loam; listed CL-ML; LEP 1.5%Plowed surface horizon
Bt, 8–36 in.Silty clay loam; listed CL; LEP 4.5%Clay-enriched subsoil
Btss, 36–60 in.Clay; listed CH; LEP 7.5%Clay-enriched subsoil with slickensides (“ss”)
ClassesLEP: low < 3%, moderate 3–6%, high 6–9%, very high ≥ 9%NRCS shrink–swell classes

Required

  • (a) Expected USCS class for each horizon from Table 3.2-13, compared with the listed class
  • (b) Linear extensibility LE of the upper 60 in. and the class of each horizon
  • (c) What the borings and laboratory program must check

Equations

  1. Eq. 3.2-1: LE = Σ (LEPi / 100) × ti — sum over horizons of thickness ti (in.)

Steps

Step 1 · (a) USCS check
Silt loam → ML; silty clay loam → CL; clay → CH (Table 3.2-13)
Listed CL-ML, CL, CH: consistent
Spot check: Silt loam spreads between ML and CL (Table 3.2-13); the listed CL-ML sits between them.
↓
Step 2 · (b) LE by horizon
0.015 × 8 = 0.12; 0.045 × 28 = 1.26; 0.075 × 24 = 1.80
LE = 3.18 in. (8.1 cm)
↓
Step 3 · (b) Classes
Ap 1.5% low; Bt 4.5% moderate; Btss 7.5% high
High shrink–swell below 3 ft
Spot check: An LE of 6 cm (2.4 in.) or more within 100 cm (39 in.) is the threshold Soil Taxonomy uses for vertic (shrink–swell) soils; 8.1 cm exceeds it, and the slickensides confirm it.
↓
Step 4 · (c) Investigation
Borings through the Btss into the C horizon; Atterberg limits, swell tests and suction on the clay; sulfate for any lime treatment
Plan for expansive clay under the new subgrade and slopes
↓
Solution
USCS classes consistent; LE ≈ 3.2 in. (8.1 cm), high below 3 ft; treat as expansive clay until tests show otherwise.

Solution

(a) ML, CL and CH expected; the listed CL-ML, CL and CH agree. (b) LE ≈ 3.2 in. (8.1 cm); low, moderate and high by horizon. (c) Investigate and design for expansive clay.

LE is an index of potential volume change between moist and oven-dry, not a prediction of track movement: field moisture changes are smaller and depend on cover, drainage and climate. It is enough to say that the siding subgrade, cut slopes and any shallow culvert or signal foundations are in shrink–swell clay, so the investigation should include swell tests and suction measurements (Chapter 2.5), and the design should consider moisture control, lime treatment after sulfate screening (Section 7.2.7) and the shallow-slide risk on side slopes (Section 7.4.9). The map unit also has inclusions of other soils, so borings, not the map, set the design.

3.2.11 Terrain Analysis and Aerial Photograph Interpretation

Terrain analysis is the interpretation of landforms, drainage, tone and vegetation on topographic maps and remotely sensed images to map the geologic conditions of a site before it is drilled. Hunt (2007) calls it often the most important part of a geotechnical investigation: landform reflects how resistant the materials are to erosion, so ridges, valleys, slope shapes and drainage reveal rock type, structure, soil origin, groundwater and hazards such as landslides and sinkholes.

3.2.11.1 Imagery and scales

Table 3.2-14. Imagery for corridor terrain analysis (after Hunt 2007, Table 1.3)
PurposeImageryScale or resolution
Regional geology and major structures (faults, folds)Satellite images; radar where cloud cover is persistentModerate resolution, whole region
General mapping of large areasStereo pairs of aerial photographs1:60,000 to 1:40,000
Detailed mapping of rock, soil, drainage, slides, sinkholesStereo pairs, black and white, true color or color infrared1:20,000 to 1:8,000
Ground moisture, seepage, wet ground at sinkholes and fault tracesColor infrared (CIR) stereo pairs; thermal infraredLarge to local areas
Ground surface under treesLiDAR bare-earth DEM and hillshade (Section 3.2.12)1 to 3 ft grid typical

Hunt recommends interpreting photographs at two scale ranges for any large study: the small scale for the overview and the large scale for detail. Historical photographs are especially valuable on railroads because they show the ground before fills, cuts and vegetation changed it.

3.2.11.2 Elements of interpretation

  • Landform and slope. Hard rocks form ridges and steep slopes; shales, soluble rocks and weathered zones form valleys and gentle slopes. Slides, sinkholes and gullies have characteristic shapes: scarps, hummocky ground, closed depressions.
  • Drainage pattern and stream form. See Table 3.2-15. Streams, lakes and swamps mark the water table.
  • Gullies. Sharp V gullies form in sand and gravel, broad U gullies in silt and loess, gentle saucer shapes in clay.
  • Tone (black and white photographs). White to light gray: free-draining soil above the water table or acid rocks; dull gray: slow-draining soils or basic rocks; dark gray to black: poorly drained or organic soil, water near the surface.
  • Vegetation. Tree lines often follow floodplain limits and fault traces; water-loving plants mark seepage.
  • Land use. Fills, cuts, borrow pits, quarries and mines are the main man-made features to map.
  • Color infrared. Healthy vegetation appears red, stressed vegetation pink to light, wet ground and water dark; useful for seepage lines and wet sinkholes.
Table 3.2-15. Drainage patterns and what they indicate (dendritic, trellis, rectangular and radial after the Physical Geology text and Hunt 2007; parallel, deranged and karst added from general practice)
PatternAppearanceIndicatesRailroad significance
DendriticTree-like, branching in all directionsUniform material: flat-lying sedimentary rock, massive crystalline rock, thick uniform soilFew structural controls; slope problems follow soil and weathering
TrellisLong parallel main streams with short tributaries at right anglesTilted or folded interbedded rocks, parallel faultsCuts across the strike meet alternating hard and soft beds and dip-slope sliding
RectangularStreams turn at right angles; segments of similar lengthJointed or faulted rock with two joint sets at right anglesJoint-controlled wedge and toppling failures in cuts
RadialStreams flow outward from a high pointDomes, volcanic cones, isolated peaksVariable dip around the feature
ParallelClosely spaced parallel streamsSteep uniform slopes, young surfaces, loessErodible ground; gullying of side slopes
DerangedIrregular, with lakes, swamps and unconnected streamsYoung glacial terrainPeat, soft lake deposits, variable till (Chapter 2.6)
Karst (internal)Few surface streams; closed depressions and sinking streamsSoluble rock: limestone, dolomite, gypsumSinkholes under track and structures (Chapter 2.11)

For railroad work: Build a strip map along the line from the topographic map, the hillshade and two scales of stereo photographs, earliest and latest. Mark landforms, drainage patterns, wet ground, old slides, filled ravines, borrow pits and culvert outfalls, and carry the map into the reconnaissance (Chapter 3.5) to check each feature on the ground. A change in drainage pattern along the line usually marks a change in geology, and is a good place for a boring.

3.2.11.3 Worked example

Example 3.2-2: Ordering Stereo Aerial Photographs for a Corridor Study

Problem Statement

A Class I railroad located in Kentucky has had repeated slides along a 12-mile line through shale hills. Before any borings are planned, the engineer wants historical stereo aerial photographs at two scales to map old slide scars, fills and drainage along the line (Section 3.2.11). The engineer must find the ground covered by each frame, the spacing between exposures and the number of photographs to order along a single flight line.

12-mile corridor (63,360 ft)G = frame on ground = ?air base B = ?9 in. × 9 in. frames at 1:20,000, 60% forward overlapNumber of photos N = ? (and at 1:40,000)GivenL = 12 mi = 63,360 ftFormat 9 × 9 in.Scale 1:20,000 (detail)Scale 1:40,000 (overview)Forward overlap 60%Single flight lineRequiredGround coverage G per frameAir base BPhotos N for each scaleBlack = given; red = required
Given and required for Example 3.2-2.

Given

VariableValueDescription
L12 mi = 63,360 ftCorridor length, one flight line
Format9 in. × 9 in.Standard aerial camera frame
S1:20,000 and 1:40,000Detail and overview scales (Hunt: use two scale ranges)
p60%Forward overlap needed for stereo viewing

Required

  • (a) Ground coverage G of one frame at each scale
  • (b) Air base B (distance between exposure centers)
  • (c) Number of photographs N for full stereo coverage

Equations

  1. Eq. 3.2-2: G = d × S — frame side d times the scale denominator
  2. Eq. 3.2-3: B = (1 − p) G
  3. Eq. 3.2-4: N = ⌈L/B⌉ + 1, plus one frame at each end so both ends are seen in stereo

Steps

Step 1 · (a) Coverage at 1:20,000
9 in. × 20,000 = 180,000 in. ÷ 12
G = 15,000 ft (2.8 mi) square
Spot check: 1:20,000 is 1,667 ft per inch; 9 in. × 1,667 = 15,000 ft.
↓
Step 2 · (b) Air base
(1 − 0.60) × 15,000
B = 6,000 ft
↓
Step 3 · (c) Photos at 1:20,000
63,360 / 6,000 = 10.6 → 11 intervals; 11 + 1 = 12; + 2 end frames
N = 14 photographs
↓
Step 4 · Overview at 1:40,000
G = 30,000 ft; B = 12,000 ft; 63,360/12,000 = 5.3 → 6; 6 + 1 + 2
N = 9 photographs
Spot check: Half the scale, twice the coverage and about half as many frames.
↓
Solution
1:20,000: G = 15,000 ft, B = 6,000 ft, 14 photos; 1:40,000: G = 30,000 ft, B = 12,000 ft, 9 photos.

Solution

(a) 15,000 ft at 1:20,000; 30,000 ft at 1:40,000. (b) 6,000 ft and 12,000 ft. (c) About 14 and 9 photographs.

A single flight line at 1:20,000 covers 7,500 ft each side of the track, far more than the corridor, so one line is enough unless the alignment curves sharply. Order the earliest available year as well as a recent one: old slide scars, filled ravines, borrow pits and abandoned alignments are often clearer before vegetation and later work hide them. Check the photos against the LiDAR hillshade (Section 3.2.12) and the slide inventory, then mark the features to visit during reconnaissance.

3.2.11.4 Sources

  1. Hunt, R. E. (2007). Geotechnical Investigation Methods: A Field Guide for Geotechnical Engineers. Boca Raton, FL: CRC Press.
  2. Introduction to Physical Geology (college textbook; Chapter 9, Geologic Time, and Chapter 14, Streams and Lakes; author and edition not shown in the copy reviewed).
3.2.12 Building the Project GIS

A project GIS keeps every layer of the desktop study on one map in one coordinate system, so the data can be overlaid, queried and handed on. The workflow below follows the standard steps in desktop GIS software (Law and Collins 2016) applied to a railroad corridor.

3.2.12.1 Workflow

  1. Set up the project and the geodatabase. Create one project with a file geodatabase that holds all feature classes and rasters. Choose one projected coordinate system for the whole job, normally the State Plane zone on NAD 83 in US survey feet, and record it in the deliverable.
  2. Load the base layers. Track centerline with mileposts, right-of-way, structures and culverts from the owner; topographic maps; aerial imagery; soil survey (Section 3.2.10); geologic, mine and karst maps; flood maps; previous borings.
  3. Georeference scanned maps. Old valuation maps, track charts and boring location plans are scanned images with no coordinates. Place control points on features that still exist (bridges, road crossings, mileposts), check the residual error the software reports, and record it; an error of tens of feet is common on old maps.
  4. Derive terrain layers from the LiDAR DEM. Hillshade (lit from more than one direction, so features of any orientation show), slope classified at break points such as 2H:1V and 1.5H:1V, contours, and profiles along the centerline and across cuts and fills.
  5. Geoprocess along the corridor. Buffer the centerline (for example 500 ft each side) and clip the soil, geology and hazard layers to it; intersect to list map units and hazards by milepost; summarize lengths of each.
  6. Join attribute data. Link boring logs, slide inventory, track geometry defects and maintenance records to points and line segments, so that patterns can be queried (for example, all surfacing defects on high shrink–swell soil).
  7. Lay out and share. Produce strip maps at a fixed scale with milepost grid, legend and sources; export layers to KMZ for field tablets and for the GHRM risk assessment app.

For railroad work: Use the railroad's own milepost and valuation station system as an attribute on every feature, because that is how track forces locate problems. Keep raw and derived data separate in the geodatabase, note the source and date of every layer, and save the project with the report so the next study starts from it rather than from scratch.

3.2.12.2 Sources

  1. Law, M. and Collins, A. (2016). Getting to Know ArcGIS Pro. Redlands, CA: Esri Press.