Groundwater and drainage control most railroad ground hazards, so the desktop study collects every clue to them:
- Well and boring databases held by state geological surveys (water wells and engineering borings, often with depth to rock and water). In one recent study 42 wells and borings were found within about 1.5 miles, including 30- to 60-ft engineering borings from the 1960s inside the site and deep monitoring wells that reached limestone at 113 to 137 ft.
- Soil survey drainage class and seasonal high water. Hydric and undrained units (for example Aquents) flag soft, wet ground and timber-mat access.
- FEMA flood zones and the base flood elevation where the site is near water.
- National Wetlands Inventory mapping, to keep borings and clearing a set distance from mapped wetlands (Chapter 3.6).
- Stream and river gauges and rainfall records, which feed the live risk rating (Chapter 3.8).
Table 3.2-2. Reading groundwater from desktop sources| Indicator | What it suggests | Follow-up |
|---|
| Ground only a few feet above a nearby lake or river | Groundwater within a few feet of the surface | Rule out infiltration testing; plan casing or mud rotary for deeper borings |
| Deep, variable water levels in nearby wells (100 to 200 ft) | Karst carbonate aquifer; perched water possible over rock | Record water at drilling, completion and 24 hours |
| Hydric soil units and wetland mapping along an old spur or ditch | Wettest ground on site; soft access | Schedule those borings after a dry period or on frozen ground |
| Ponding, dark standing water or odor reported in ditches | Organic muck, sulfur-bearing fill or a sewer source | Historical review; four-gas monitoring while drilling |
Reading the soil survey: map units, Soil Taxonomy orders and what they flag, how USDA texture relates to USCS, and a worked example are in
Section 3.2.10.